Triton Center III (V2): Difference between revisions
MelvinMan10 (talk | contribs) m (→Zone 2) |
No edit summary |
||
(26 intermediate revisions by 6 users not shown) | |||
Line 1: | Line 1: | ||
<div style="float: right">{{Bld | |||
|Triton Center III | |||
|Incomplete | |||
|Unknown | |||
|TC3 | |||
|EG881 | |||
|172 | |||
|9 | |||
|72 | |||
|9 | |||
|0 | |||
|4 | |||
|Multi-purpose | |||
|[[EG881 Integration Project]] | |||
}}</div>{{legit}}{{IpInfo/EG881}}{{Future infrastructure}} | |||
''For the original version, please refer to [[Triton Center III (V1)|this page]].'' | ''For the original version, please refer to [[Triton Center III (V1)|this page]].'' | ||
[[File:Triton Center III V2 - EG881 Integration Project.png|alt=Replaced the old Triton Center III|thumb|602x602px|Triton Center III V2 (In EG881 Integration Project)]] | [[File:Triton Center III V2 - EG881 Integration Project.png|alt=Replaced the old Triton Center III|thumb|602x602px|Triton Center III V2 (In EG881 Integration Project)]] | ||
The '''Triton Center III''' is a 172-floor mixed-use skyscraper made by escalatorgeek881 (EG881). It is currently a part of the [[EG881 Integration Project]]. | The '''Triton Center III''' is a 172-floor mixed-use skyscraper made by escalatorgeek881 (EG881). It is currently a part of the [[EG881 Integration Project]]. This is the second version of Triton Center III, with various things changed like floor LL, that was reduced, floor 90 revamped, completion of the hotel and residential floors, rework at floor 44, addition of communication floors, and revocations like the second ballroom elevators, the outside service elevators, the freight elevator, the LSP floor, and work at floors 45-87 undone. | ||
== Floors == | == Floors == | ||
=== Zone B === | === Zone B === | ||
* '''SP''' - Staff Parking | * '''SP''' - Staff Parking | ||
* '''P7-P1''' - Parking | * '''P7-P1''' - Parking | ||
* '''LL''' - Lower | * '''LL''' - Lower level (Concourse & observation deck lobby) | ||
=== Zone 1 === | === Zone 1 === | ||
* '''L''' - Lobby | * '''L''' - Lobby | ||
* '''M''' - Mezzanine / Service Area | * '''M''' - Mezzanine / Service Area | ||
* '''MU''' - Upper Service Area (not accessible by elevator) | |||
* '''2-6''' - Conference Center | * '''2-6''' - Conference Center | ||
* '''7-41''' - Zone 1 Offices | * '''7-41''' - Zone 1 Offices | ||
Line 17: | Line 33: | ||
* '''45-87''' - Zone 2 Offices | * '''45-87''' - Zone 2 Offices | ||
* '''88-89''' - Zone 2 Mechanical | * '''88-89''' - Zone 2 Mechanical | ||
=== Zone 3 === | === Zone 3 === | ||
* '''90''' - Hotel Skylobby | * '''90''' - Hotel Skylobby | ||
Line 28: | Line 43: | ||
* '''116-136''' - Lower Residences | * '''116-136''' - Lower Residences | ||
* '''137''' - Zone 3 Mechanical | * '''137''' - Zone 3 Mechanical | ||
=== Zone 4 === | === Zone 4 === | ||
* '''138-153''' - Upper Residences | * '''138-153''' - Upper Residences | ||
Line 42: | Line 56: | ||
* '''164''' - Roof / Communications | * '''164''' - Roof / Communications | ||
* '''165-171''' - Communications (not accessible by elevator) | * '''165-171''' - Communications (not accessible by elevator) | ||
* '''RF''' - | * '''RF''' - Rooftop | ||
[[Category:EG881's buildings]] | [[Category:EG881's buildings]] | ||
[[Category:Multi-purpose buildings]] |
Latest revision as of 12:52, 13 October 2024
Triton Center III
| |
---|---|
It contains good-faith information, such as an existing building or content. |
This article describes a building that is currently part of the EG881 Integration Project by EG881. It can be found here on the Skyscraper Simulator Forum. |
---|
This article may need to be updated as more stuff comes. |
For the original version, please refer to this page.
The Triton Center III is a 172-floor mixed-use skyscraper made by escalatorgeek881 (EG881). It is currently a part of the EG881 Integration Project. This is the second version of Triton Center III, with various things changed like floor LL, that was reduced, floor 90 revamped, completion of the hotel and residential floors, rework at floor 44, addition of communication floors, and revocations like the second ballroom elevators, the outside service elevators, the freight elevator, the LSP floor, and work at floors 45-87 undone.
Floors[edit | edit source]
Zone B[edit | edit source]
- SP - Staff Parking
- P7-P1 - Parking
- LL - Lower level (Concourse & observation deck lobby)
Zone 1[edit | edit source]
- L - Lobby
- M - Mezzanine / Service Area
- MU - Upper Service Area (not accessible by elevator)
- 2-6 - Conference Center
- 7-41 - Zone 1 Offices
- 42-43 - Zone 1 Mechanical
Zone 2[edit | edit source]
- 44 - Office Skylobby
- 45-87 - Zone 2 Offices
- 88-89 - Zone 2 Mechanical
Zone 3[edit | edit source]
- 90 - Hotel Skylobby
- 91 - Hotel Guestrooms
- 92 - Hotel Service Area
- 93-112 - Hotel Guestrooms
- 113 - Residential Skylobby
- 114 - Residential Mezzanine
- 115 - Residential Service Area
- 116-136 - Lower Residences
- 137 - Zone 3 Mechanical
Zone 4[edit | edit source]
- 138-153 - Upper Residences
- 154 - Pool Maintenance
- 155 - Aquamarine Sky Pool
- 156 - Upper Service Level
- 157 - Restaurant Service and Kitchen
- 158 - Diamond View Restaurant
- 159-160 - Triton Grand Ballroom
- 161 - Diamond View Observatory
- 162-163 - Zone 4 Mechanical
Zone R[edit | edit source]
- 164 - Roof / Communications
- 165-171 - Communications (not accessible by elevator)
- RF - Rooftop