EG881 Integration Project: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
MelvinMan10 (talk | contribs)
MelvinMan10 (talk | contribs)
Line 49: Line 49:
* [[EG881 Ranch House]]
* [[EG881 Ranch House]]
* [[Eternity Plaza (V2)]]
* [[Eternity Plaza (V2)]]
* [[JP Richardson Visitors Center]]
* [[Northeast Triad Convention Center]] (NTCC)
** [[NTCC/DMC|Doolittle Meridian Center]]
* [[Sky I (V2)]]
* [[Stratford Business Complex]]
* [[Terrace V3]]
* [[Terrace V3]]
* [[Terrace Border V2]]
** [[Terrace Border V2]]
* [[Triton Center III (V2)]]
* [[Triton Center III (V2)]]
* [[Sky I (V2)]]
* [[Northeast Triad Convention Center]] (NTCC)
* [[Stratford Business Complex]]
* [[NTCC/DMC|Doolittle Meridian Center (New building next to Doolittle St. Garage)]]


=== Future buildings ===
=== Future buildings ===
''These buildings currently have only their exterior simulated.''
''These buildings currently have only their exterior simulated.''
* Alfinity Plaza
* Coniferous Tower
* Coniferous Tower
* Denton Plaza
* Denton Plaza
Line 66: Line 68:


=== Past buildings ===
=== Past buildings ===
''Main article: [[Buildings/Creators E-H#escalatorgeek881's Buildings|escalatorgeek881's Buildings]]''
''Most of these buildings have been superseded by newer versions listed above.''
{| class="wikitable sortable mw-collapsible mw-collapsed"
|+
!Building Name
!Status
!City
!Building Name
!Status
!City
|-
|[[Triton Center II]]
|Completed
|Unknown
|[[The Spire]]
|Discontinued
|Carrara
|-
|[[Triton Center III (V1)]]
|Discontinued
|[[Diamond City]]
|[[Dellerton Plaza (V1)]]
|Completed
|[[Andersville]]
|-
|[[Eternity Plaza (V1)]]
|Completed
|Andersville
|[[One Mantis Center (V1)]]
|Discontinued
|Andersville
|-
|[[Simple - EG881 Testing]]
|Completed
|Unknown
|[[Sky I (V1)]]
|Discontinued
|Diamond City
|-
|[[Terrace]]
|Completed
|Andersville
 
|[[Terrace Border]]
|Completed
|Andersville
|}


== External links ==
== External links ==

Revision as of 01:07, 11 August 2025

Integration Project Info*
Elevator1512's Buildings *
38
tag
Escalatorgeek881's Buildings *
21
tag
Mn10's Buildings *
9
tag
M72's Buildings *
111
tag
Sumosoftinc's Buildings *
45
tag
EGR1312's Buildings *
42
tag
SS Showcase's Buildings *
18
tag
Haru's Buildings *
5
tag
Elevator1209's Buildings *
6
tag
LF's Buildings *
28
tag
HappyPizza64's Buildings *
14
tag
joao84704's Buildings *
29
tag
Lift Excelsior's Buildings *
4
tag
Current Integration Projects *
19
tag
Add this template *
This article is legitimate.
It contains good-faith information, such as an existing building or content.

The EG881 Integration Project is an integration project founded by escalatorgeek881. It is the first integration project as it allowed multiple buildings and their related data to be released at the same time, and more integration projects soon followed such as the Mn10 Integration Project and M72 Integration Project. It also introduced Escalator2011 which allows users to create realistic-looking escalators, and In-Code Basic Stairwell Creator to create stairwells in seconds. This project was one of the forum's most popular topics until it was left untouched in late 2018. Later in May 2023, EG881 returned to the new forum and posted some progress on various buildings, such as NTCC, SBC, and Dellerton Plaza.

Versions

EG881 Integration Project 2011

  • Version 1.0 (04/04/2011)
  • Version 1.5 (05/01/2011)
  • Version 2.0 (06/05/2011)
  • Version 2.5 (07/30/2011)
  • Version 3.0 (09/25/2011)

EG881 Integration Project 2012

  • Build 1 (02/06/2012)
  • Build 2 (02/12/2012)
  • Build 3 (03/12/2012)
  • Build 4 (06/03/2012)
  • Build 5 (09/22/2012)
  • Build 6 (12/25/2012)

EG881 Integration Project 2013 / 2014

Integration Project 2013

  • Build 1 (01/14/2013)
  • Build 2 (05/26/2013)
  • Build 3 (10/19/2013)

Integration Project 2014

  • Build 1 (01/11/2014)
  • Build 2 (01/29/2014)
  • Build 3 (03/09/2014)

EG881 Integration Project (After 2014)

  • Build 1 (03/19/2015)
  • Build 2 (07/20/2015)
  • Build 3 (08/25/2015)
  • Build 4 (12/20/2015)
  • Build 5 (12/25/2015)
  • Build 6 (03/29/2016)
  • Build 7 (05/01/2016)
  • Build 8 (07/17/2016)
  • Build 9 (12/19/2016)
  • Build 10 (01/16/2017)
  • Build 11 (10/01/2018)
  • Build 12 (06/04/2023)
  • Build 13 (07/30/2023)
  • Build 14 (09/17/2023)
  • Build 15 (11/05/2023)
  • Build 16 (03/02/2024)
  • Build 17 (07/19/2025)

Buildings

Current buildings

Future buildings

These buildings currently have only their exterior simulated.

  • Alfinity Plaza
  • Coniferous Tower
  • Denton Plaza
  • Grove Building
  • Lint Plaza
  • Shillander Financial Center

Past buildings

Most of these buildings have been superseded by newer versions listed above.

Building Name Status City Building Name Status City
Triton Center II Completed Unknown The Spire Discontinued Carrara
Triton Center III (V1) Discontinued Diamond City Dellerton Plaza (V1) Completed Andersville
Eternity Plaza (V1) Completed Andersville One Mantis Center (V1) Discontinued Andersville
Simple - EG881 Testing Completed Unknown Sky I (V1) Discontinued Diamond City
Terrace Completed Andersville Terrace Border Completed Andersville

External links