Spacetime Plaza Screenshots: Difference between revisions
Jump to navigation
Jump to search
MelvinMan10 (talk | contribs) |
MelvinMan10 (talk | contribs) |
||
| Line 26: | Line 26: | ||
STP_ACTT_34thFloor.jpg|One of the office floors (1 June 2026) | STP_ACTT_34thFloor.jpg|One of the office floors (1 June 2026) | ||
STP_ACTT_HZ_Elev.jpg|An office local elevator (1 June 2026) | STP_ACTT_HZ_Elev.jpg|An office local elevator (1 June 2026) | ||
STP_ACTT_LMZ_Elev.jpg|Another office elevator with a different interior (5 June 2026) | |||
STP_ACTT_PKElev1.jpg|Looking at the parking elevators (4 June 2026) | STP_ACTT_PKElev1.jpg|Looking at the parking elevators (4 June 2026) | ||
STP_ACTT_PKElev2.jpg|Inside one of the parking elevators (5 June 2026) | STP_ACTT_PKElev2.jpg|Inside one of the parking elevators (5 June 2026) | ||
Latest revision as of 07:48, 5 June 2026
Overview[edit | edit source]
-
Looking at the main shopping areas from the northeast, with the tall buildings seen in background (31 May 2026)
-
Looking from the southwest, with the Lavender Moon Hotel and Accounting Tower visible (31 May 2026)
Main mall and Monica Dept. Store[edit | edit source]
-
The main mall's center atrium with the glass elevators (13 May 2026)
-
A glass elevator at the center of the main mall (6 May 2026)
-
Parking elevator lobby (6 May 2026)
-
Inside one of the parking elevators (6 May 2026)
-
One of the elevators at the mall's east side (13 May 2026)
-
Another bank of elevators with different floor indicators (13 May 2026)
April Dept. Store and Tower[edit | edit source]
-
April Tower's elevators on the 3rd floor (6 May 2026)
-
Inside one of April Tower's elevators (6 May 2026)
Accounting Tower[edit | edit source]
-
One of the office floors (1 June 2026)
-
An office local elevator (1 June 2026)
-
Another office elevator with a different interior (5 June 2026)
-
Looking at the parking elevators (4 June 2026)
-
Inside one of the parking elevators (5 June 2026)
Underground parking garage[edit | edit source]
-
A ramp connecting the southeastern side of levels B1 and B2 (1 June 2026)
-
A ramp connecting the northeastern side of levels B1 and B2 (1 June 2026)