Stratford Business Complex: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
m Text replacement - "{{legit}}" to "{{legit}}{{IpInfo/EG881}}"
MelvinMan10 (talk | contribs)
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
*'''SB''' - ''Locked''
*'''SB''' - ''Locked''
*'''B''' - Access to Annex Tunnels
*'''B''' - Access to Annex Tunnels
*'''G''' - Lobby
*'''G''' - Lobby, lower exit
*'''1-21''' - Offices
*'''1''' - Offices, upper exit
*'''2-21''' - Offices
*'''22''' - ''Service level? (Locked)''
*'''22''' - ''Service level? (Locked)''
*'''R''' - Roof
*'''R''' - Roof
=== Building 2 ===
=== Building 2 ===
*'''A''' - Annex level
*'''A''' - Annex level
*'''LL''' - Lower level, exit to parking lot
*'''LL''' - Lower level, lower exit
*'''1''' - Lobby, upper exit, offices
*'''1''' - Lobby, upper exit, offices
*'''2-5''' - Offices
*'''2-5''' - Offices
*'''R''' - Roof
*'''R''' - Roof
=== Building 3 ===
=== Building 3 ===
*'''SB''' - Service basement
*'''SB''' - Service basement

Latest revision as of 00:36, 7 August 2026

This article is legitimate.
It contains good-faith information, such as an existing building or content.
This article describes a building that is currently
a part of the EG881 Integration Project by EG881.

It can be found at the Skyscraper Simulator Forum.

Stratford Business Complex

The Stratford Business Complex is a complex of office buildings created by escalatorgeek881. There are different brands of elevators, such as Otis, Dover, and Kone, in the complex.

Floors[edit | edit source]

Building 1[edit | edit source]

This needs to be updated.

  • SB - Locked
  • B - Access to Annex Tunnels
  • G - Lobby, lower exit
  • 1 - Offices, upper exit
  • 2-21 - Offices
  • 22 - Service level? (Locked)
  • R - Roof

Building 2[edit | edit source]

  • A - Annex level
  • LL - Lower level, lower exit
  • 1 - Lobby, upper exit, offices
  • 2-5 - Offices
  • R - Roof

Building 3[edit | edit source]

  • SB - Service basement
  • A - Annex level
  • LL - Lower level
  • 1 - Lobby, offices
  • 2-7 - Offices
  • R - Roof

Building 4[edit | edit source]

  • A - Annex level
  • G - Lobby
  • 2-5 - Offices
  • R - Roof

Building 5[edit | edit source]

  • T - Tunnel level
  • 1 - Lobby
  • 2-5 - Offices
  • R - Roof

Buildings 6-8[edit | edit source]

Under construction.

Buildings 9-10[edit | edit source]

Info yet to be revealed.

Parking garage[edit | edit source]

Under construction.

See also[edit | edit source]