Line Hospital (V1): Difference between revisions
Jump to navigation
Jump to search
Elevator1512 (talk | contribs) (→File 6) |
No edit summary |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
''For the planned building with the same name, please go to [[Line Hospital (V2)|this page]].'' | ''For the planned building with the same name, please go to [[Line Hospital (V2)|this page]].'' | ||
{{Line Hospital (V1)}} | |||
'''Line Hospital V1''' is a building complex that was made by elevator1512. There are a total of 8 separate building files and 37 buildings in the complex. | '''Line Hospital V1''' is a building complex that was made by elevator1512. There are a total of 8 separate building files and 37 buildings in the complex. | ||
== Floors == | == Floors == | ||
Line 1,204: | Line 1,204: | ||
=== File 7 === | === File 7 === | ||
==== Building 30 ==== | ==== Building 30 ==== | ||
{| class="wikitable mw-collapsible mw-collapsed" | |||
|+ | |||
!Floors | |||
!Usage | |||
|- | |||
|'''SB (B7)''' | |||
|Sub-Basement | |||
|- | |||
|'''B2-B1 (B6-B5)''' | |||
|Basement Levels | |||
|- | |||
|'''1 (B4)''' | |||
|Lower Level 2 | |||
|- | |||
|'''1R (B3)''' | |||
|Tunnel to Buildings 31-33 | |||
|- | |||
|'''2 (B2)''' | |||
|Lower Level 1 | |||
|- | |||
|'''2R (B1)''' | |||
|Storage | |||
|- | |||
|'''L (0)''' | |||
|Lobby | |||
|- | |||
|'''3 (1)''' | |||
|Mezzanine | |||
|- | |||
|'''4-12 (2-10)''' | |||
|Patient Rooms | |||
|- | |||
|'''14-19 (11-16)''' | |||
|Patient Rooms | |||
|- | |||
|'''PH (17)''' | |||
|Penthouse | |||
|- | |||
|'''R (18)''' | |||
|Roof | |||
|} | |||
==== Building 31 ==== | ==== Building 31 ==== | ||
{| class="wikitable mw-collapsible mw-collapsed" | |||
|+ | |||
!Floors | |||
!Usage | |||
|- | |||
|'''SB''' | |||
|Sub-Basement | |||
|- | |||
|'''B6-B5''' | |||
|Storage | |||
|- | |||
|'''B4''' | |||
|Lower Level 2 | |||
|- | |||
|'''B3''' | |||
|Tunnel to Buildings 30, 32-33 | |||
|- | |||
|'''B2''' | |||
|Storage | |||
|- | |||
|'''B1''' | |||
|Lower Level 1 | |||
|- | |||
|'''L''' | |||
|Lobby | |||
|- | |||
|'''M''' | |||
|Mezzanine | |||
|- | |||
|'''2-9''' | |||
|Offices | |||
|- | |||
|'''10''' | |||
|Mechanical | |||
|- | |||
|'''11''' | |||
|Roof | |||
|} | |||
==== Building 32 ==== | ==== Building 32 ==== | ||
{| class="wikitable mw-collapsible mw-collapsed" | |||
|+ | |||
!Floors | |||
!Usage | |||
|- | |||
|'''LL3''' | |||
|Storage | |||
|- | |||
|'''T''' | |||
|Tunnel to Buildings 30-31, 33 | |||
|- | |||
|'''LL2-LL1''' | |||
|Lower Levels | |||
|- | |||
|'''1''' | |||
|Lobby | |||
|- | |||
|'''2-12''' | |||
|Offices | |||
|- | |||
|'''14''' | |||
|Mechanical | |||
|- | |||
|'''15''' | |||
|Roof | |||
|} | |||
==== Building 33 ==== | ==== Building 33 ==== | ||
{| class="wikitable mw-collapsible mw-collapsed" | |||
|+ | |||
!Floors | |||
!Usage | |||
|- | |||
|'''LL3 (-6)''' | |||
|Lower Level 3 | |||
|- | |||
|'''L3M (-5)''' | |||
|Storage | |||
|- | |||
|'''LL2 (-4)''' | |||
|Lower Level 2 | |||
|- | |||
|'''L2M (-3)''' | |||
|Tunnel to Buildings 30-32 | |||
|- | |||
|'''LL1 (-2)''' | |||
|Lower Level 1 | |||
|- | |||
|'''L1M (-1)''' | |||
|Storage | |||
|- | |||
|'''1 (0)''' | |||
|Lobby | |||
|- | |||
|'''1M (1)''' | |||
|Lobby Mezzanine | |||
|- | |||
|'''2''' | |||
|Lower Patient Rooms | |||
|- | |||
|'''2M (3)''' | |||
|Lower Mezzanine | |||
|- | |||
|'''3 (4)''' | |||
|Middle Patient Rooms | |||
|- | |||
|'''3M (5)''' | |||
|Upper Mezzanine | |||
|- | |||
|'''4 (6)''' | |||
|Upper Patient Rooms | |||
|- | |||
|'''4M (7)''' | |||
|Mechanical | |||
|- | |||
|'''5 (8)''' | |||
|Roof | |||
|} | |||
=== File 8 === | === File 8 === | ||
==== Building 34 ==== | ==== Building 34 ==== | ||
{| class="wikitable mw-collapsible mw-collapsed" | |||
|+ | |||
!Floors | |||
!Usage | |||
|- | |||
|'''B8''' | |||
|Service Basement | |||
|- | |||
|'''B7-B6''' | |||
|Unknown | |||
|- | |||
|'''B5''' | |||
|Lower Tunnel Level | |||
|- | |||
|'''B4-B3''' | |||
|Unknown | |||
|- | |||
|'''B2''' | |||
|Upper Tunnel Level | |||
|- | |||
|'''B1''' | |||
|Mechanical | |||
|- | |||
|'''1''' | |||
|Lobby | |||
|- | |||
|'''M''' | |||
|Mezzanine | |||
|- | |||
|'''2''' | |||
|Mechanical | |||
|- | |||
|'''3-8''' | |||
|Patient Rooms | |||
|- | |||
|'''9''' | |||
|Lower Footbridge | |||
|- | |||
|'''10-20''' | |||
|Patient Rooms | |||
|- | |||
|'''21''' | |||
|Upper Footbridge | |||
|- | |||
|'''22-25''' | |||
|Patient Rooms | |||
|- | |||
|'''26''' | |||
|Mechanical | |||
|- | |||
|'''27-39''' | |||
|Patient Rooms | |||
|- | |||
|'''R''' | |||
|Roof | |||
|} | |||
==== Building 35 ==== | ==== Building 35 ==== | ||
{| class="wikitable mw-collapsible mw-collapsed" | |||
|+ | |||
!Floors | |||
!Usage | |||
|- | |||
|'''B8''' | |||
|Service Basement | |||
|- | |||
|'''B7-B6''' | |||
|Express Zone | |||
|- | |||
|'''B5''' | |||
|Lower Tunnel Level | |||
|- | |||
|'''B4-B3''' | |||
|Unknown | |||
|- | |||
|'''B2''' | |||
|Upper Tunnel Level | |||
|- | |||
|'''B1''' | |||
|Unknown | |||
|- | |||
|'''1''' | |||
|Lobby | |||
|- | |||
|'''M''' | |||
|Mezzanine | |||
|- | |||
|'''2-8''' | |||
|Offices | |||
|- | |||
|'''9''' | |||
|Lower Footbridge | |||
|- | |||
|'''10-18''' | |||
|Offices | |||
|- | |||
|'''19''' | |||
|Mechanical | |||
|- | |||
|'''20''' | |||
|Offices | |||
|- | |||
|'''21''' | |||
|Upper Footbridge | |||
|- | |||
|'''22-24''' | |||
|Offices | |||
|- | |||
|'''R''' | |||
|Roof | |||
|} | |||
==== Building 36 ==== | ==== Building 36 ==== | ||
{| class="wikitable mw-collapsible mw-collapsed" | |||
|+ | |||
!Floors | |||
!Usage | |||
|- | |||
|'''B8''' | |||
|Service Basement | |||
|- | |||
|'''B7-B6''' | |||
|Unknown | |||
|- | |||
|'''B5''' | |||
|Lower Tunnel Level | |||
|- | |||
|'''B4''' | |||
|Mechanical | |||
|- | |||
|'''B3''' | |||
|Unknown | |||
|- | |||
|'''B2''' | |||
|Upper Tunnel Level | |||
|- | |||
|'''B1''' | |||
|Mechanical | |||
|- | |||
|'''1''' | |||
|Lobby | |||
|- | |||
|'''M''' | |||
|Mezzanine | |||
|- | |||
|'''2''' | |||
|Mechanical | |||
|- | |||
|'''3-8''' | |||
|Offices | |||
|- | |||
|'''9''' | |||
|Lower Footbridge | |||
|- | |||
|'''10''' | |||
|Mechanical | |||
|- | |||
|'''11-14''' | |||
|Offices | |||
|- | |||
|'''R''' | |||
|Roof | |||
|} | |||
==== Building 37 ==== | ==== Building 37 ==== | ||
{| class="wikitable mw-collapsible mw-collapsed" | |||
|+ | |||
!Floors | |||
!Usage | |||
|- | |||
|'''B8''' | |||
|Service Basement | |||
|- | |||
|'''B7-B4''' | |||
|Express Zone | |||
|- | |||
|'''B3''' | |||
|Mechanical | |||
|- | |||
|'''B2''' | |||
|Upper Tunnel Level | |||
|- | |||
|'''B1''' | |||
|Unknown | |||
|- | |||
|'''1''' | |||
|Lobby | |||
|- | |||
|'''M''' | |||
|Mezzanine | |||
|- | |||
|'''2-8''' | |||
|Patient Rooms | |||
|- | |||
|'''9''' | |||
|Lower Footbridge | |||
|- | |||
|'''10-13''' | |||
|Patient Rooms | |||
|- | |||
|'''14''' | |||
|Mechanical | |||
|- | |||
|'''15-20''' | |||
|Patient Rooms | |||
|- | |||
|'''21''' | |||
|Upper Footbridge | |||
|- | |||
|'''R''' | |||
|Roof | |||
|} | |||
== See also == | == See also == | ||
* [[ | * [[Bayside Plaza (V1)]] | ||
* [[Garden Plaza Tower]] | |||
[[Category:Elevator1512's buildings]] | [[Category:Elevator1512's buildings]] | ||
[[Category:Beno Building Creator buildings]] | [[Category:Beno Building Creator buildings]] | ||
[[Category:Hospitals]] |
Latest revision as of 10:04, 25 February 2024
For the planned building with the same name, please go to this page.
File 1 | File 2 | File 3 | File 4 | File 5 | File 6 | File 7 | File 8 |
Line Hospital V1 is a building complex that was made by elevator1512. There are a total of 8 separate building files and 37 buildings in the complex.
Floors[edit | edit source]
File 1[edit | edit source]
Building 1[edit | edit source]
Floors | Usage |
---|---|
T3-T1 | Storage Rooms |
L2 | Lower Ground Section 2 |
M | Maintenance Level |
L1 | Lower Ground Section 1 |
LG | Ground Floor |
UG | Upper Ground Floor |
1-19 | Patient Rooms |
20 | Lower Footbridge |
21-29 | Patient Rooms |
30 | Upper Footbridge |
31-32 | Patient Rooms |
33-34 | Mechanical |
R | Rooftop |
Building 2[edit | edit source]
Floors | Usage |
---|---|
SB | Sub-Basement |
B | Basement |
T3-T1 | Storage Rooms |
L2 | Lower Ground Section 2 |
M | Maintenance Level |
L1 | Lower Ground Section 1 |
LG | Ground Floor |
UG | Upper Ground Floor |
1-24 | Patient Rooms |
25 | Lower Footbridge |
26-29 | Offices |
30 | Upper Footbridge |
31 | Mechanical |
32 | Rooftop |
Building 3[edit | edit source]
Floors | Usage |
---|---|
SB | Subterranean Basement |
B | Basement |
T3-T1 | Storage Rooms |
L2 | Lower Ground Section 2 |
M | Maintenance Level |
L1 | Lower Ground Section 1 |
LG | Ground Floor |
UG | Upper Ground Floor |
1-19 | Patient Rooms |
20 | Lower Footbridge |
21-24 | Patient Rooms |
25 | Upper Footbridge |
26 | Mechanical |
27 | Rooftop |
Building 4[edit | edit source]
Floors | Usage |
---|---|
SB | Subterranean Basement |
B | Basement |
T3-T1 | Storage Rooms |
L2 | Lower Ground Section 2 |
M | Maintenance Level |
L1 | Lower Ground Section 1 |
LG | Ground Floor |
UG | Upper Ground Floor |
1-6 | Critical Care Units |
7-19 | Regular Units |
20 | Footbridge |
21-22 | Mechanical |
23 | Rooftop |
Communications Building (Building 5)[edit | edit source]
Floors | Usage |
---|---|
T2-T1 | Storage Rooms |
L2 | Generator for Building 1 |
M | Tunnel to Buildings 1-4 |
L1 | Generator for Buildings 2 and 3 |
LG | Communications |
UG | Communications |
1-4 | Communications |
5 | Rooftop |
File 2[edit | edit source]
Building 6[edit | edit source]
Floors | Usage |
---|---|
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2-8 | Patient Rooms |
9 | Mechanical |
10 | Rooftop |
Building 7[edit | edit source]
Floors | Usage |
---|---|
B5 | Generator Room |
B4 | Lower Basement |
B3 | Mezzanine |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2-9 | Offices |
10 | Footbridge |
11-12 | Upper Offices |
13 | Mechanical |
14 | Rooftop |
Building 8[edit | edit source]
Floors | Usage |
---|---|
B3-B1 | Underground Crosswalk |
1 | Lobby |
1A | Atrium |
2-9 | Lower Patient Rooms |
10 | Lower Footbridge |
11 | Lower Mechanical |
12-19 | Middle Patient Rooms |
20 | Upper Footbridge |
21-31 | Upper Patient Rooms |
32-33 | Mechanical |
H | Heliport Level |
Building 9[edit | edit source]
Floors | Usage |
---|---|
SB | Sub-Basement |
SM | Sub-Basement Mezzanine |
B4 | Storage Area |
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2 | Emergency Room |
3-5 | Extended Stay Patient Rooms |
6-9 | Lower Patient Rooms |
10 | Lower Footbridge |
11-19 | Upper Patient Rooms |
20 | Upper Footbridge |
21-24 | Offices |
25-26 | Mechanical |
27 | Roof |
Building 10[edit | edit source]
Floors | Usage |
---|---|
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2-9 | Lower Patient Rooms |
10 | Lower Footbridge |
11-18 | Upper Patient Rooms |
19 | Mechanical |
20 | Upper Footbridge |
21 | Roof |
Communications Building (Building 11)[edit | edit source]
Floors | Usage |
---|---|
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Exit and Storage |
1A | Storage |
2-3 | Storage |
4 | Rooftop |
File 3[edit | edit source]
Building 12[edit | edit source]
Floors | Usage |
---|---|
S2-S1 | Sub-Basement Level |
B5-B4 | Lower Basement Floor |
B3 | Basement Tunnel Section |
B2-B1 | Upper Basement Floors |
1 | Main Entrance |
2-4 | Critical Care Patient Rooms |
M | Lower Crosswalk |
5-9 | Lower Patient Rooms |
10 | Main Crosswalk |
11 | Lower Mechanical |
12-18 | Upper Patient Rooms |
19 | Upper Mechanical |
20 | Upper Crosswalk |
21-27 | Hospital Offices |
H | Heliport Area |
Building 13[edit | edit source]
Floors | Usage |
---|---|
B4 | Tunnel to Building 9 |
B3 | Tunnel to Buildings 12 and 13 |
B2 | Lower Basement |
B1 | Upper Basement |
1 | Main Entrance |
2-4 | Offices |
M | Mezzanine Footbridge |
5-6 | Offices |
7 | Roof |
Building 14[edit | edit source]
Floors | Usage |
---|---|
S1 | Lower Subterranean Basement |
B5 | Upper Subterranean Basement |
B4 | Basement Tunnel |
B3 | Lower Basement |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Main Entrance |
2-4 | Patient Rooms |
M | Mezzanine Footbridge |
5 | Mechanical |
6-9 | Patient Rooms |
10 | Main Footbridge |
11-12 | Patient Rooms |
13 | Mechanical |
14 | Roof |
Building 15[edit | edit source]
Floors | Usage |
---|---|
B4 | Storage Level |
B3 | Basement Tunnel |
B2 | Lower Basement |
B1 | Upper Basement |
1 | Main Entrance |
2-4 | Critical Care Patient Rooms |
M | Mezzanine Footbridge |
5-8 | Patient Rooms |
9 | Mechanical |
10-19 | Patient Rooms |
20 | Footbridge |
21 | Patient Rooms |
22 | Mechanical |
23 | Roof |
Communications Building (Building 16)[edit | edit source]
Floors | Usage |
---|---|
B3 | Lower Basement |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
2-4 | Storage |
M | Storage |
5 | Roof |
File 4[edit | edit source]
Building 17[edit | edit source]
Floors | Usage |
---|---|
B3 | Lower Lounge |
B2 | Storage Room |
B1 | Basement Tunnel |
1 | Main Entrance |
2 | Hospital Reception |
3-6 | Lower Patient Rooms |
M | Crosswalk |
7-9 | Upper Patient Rooms |
10 | Mechanical |
11 | Roof |
Building 18[edit | edit source]
Floors | Usage |
---|---|
B2 | Storage Room |
B1 | Basement Level |
1 | Main Entrance |
2-6 | Offices |
M | Lower Crosswalk |
7-12 | Offices |
13 | Mechanical |
14-16 | Executive Offices |
17 | Upper Crosswalk |
18-24 | Patient Rooms |
25 | Roof |
Building 19[edit | edit source]
Floors | Usage |
---|---|
B3 | Lower Basement |
B2 | Storage Room |
B1 | Main Basement |
1 | Main Entrance |
2-6 | Patient Rooms |
M | Footbridge |
7-12 | Patient Rooms |
13 | Mechanical |
14-16 | Patient Rooms |
17 | Podium |
18-28 | Offices |
R | Roof |
File 5[edit | edit source]
Building 20[edit | edit source]
Floors | Usage |
---|---|
B6 | Lower Subterranean Basement |
B5 | Lower Basement |
B4 | Upper Subterranean Basement |
B3 | Basement Tunnel |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Main Lobby |
2-8 | Patient Rooms |
9 | Mechanical |
10 | Lower Offices |
P | Office Podium Level |
11-18 | Upper Offices |
M | Mechanical |
R | Roof |
Building 21[edit | edit source]
Floors | Usage |
---|---|
B4 | Subterranean Basement |
B3 | Basement Tunnel |
B2 | Lower Basement |
B1 | Upper Basement |
1 | Main Lobby |
2-6 | Offices |
7 | Mechanical |
8-10 | Lower Patient Rooms |
P | Podium Level |
11-13 | Patient Rooms |
14 | Mechanical |
R | Roof |
File 6[edit | edit source]
Building 22[edit | edit source]
Floors | Usage |
---|---|
B4-B1 | Basement |
G | Lobby |
1-6 | Patient Rooms |
7 | Footbridge |
8 | Patient Rooms |
9 | Mechanical |
10-15 | Patient Rooms |
16 | Mechanical |
17 | Footbridge |
18-26 | Patient Rooms |
27 | Footbridge |
28 | Patient Rooms |
29 | Mechanical |
30-36 | Patient Rooms |
37 | Roof |
Building 23[edit | edit source]
Floors | Usage |
---|---|
B7-B1 | Basement |
G | Ground Floor |
1 | Special Care Patient Rooms |
2 | Mechanical |
3-6 | Special Care Patient Rooms |
7 | Footbridge |
8-16 | Patient Rooms |
17 | Footbridge |
18-20 | Patient Rooms |
21 | Mechanical |
22 | Service? |
23-26 | Offices |
27 | Footbridge |
28-41 | Offices |
42 | Mechanical |
43-44 | Offices |
R | Roof |
Building 24[edit | edit source]
Floors | Usage |
---|---|
B6-B1 | Basement |
G | Ground Floor |
1-6 | Offices |
7 | Footbridge |
8-16 | Offices |
17 | Footbridge |
18 | Offices |
19 | Mechanical |
20 | Roof |
Building 25[edit | edit source]
Floors | Usage |
---|---|
B2-B1 | Basement |
G | Ground Floor |
1-6 | Offices |
7 | Podium |
8-13 | Offices |
14 | Mechanical |
15 | Roof |
Building 26[edit | edit source]
Floors | Usage |
---|---|
B3-B1 | Basement |
G | Ground Floor |
1-6 | Offices |
7 | Footbridge |
8-10 | Offices |
11 | Mechanical |
12-16 | Offices |
17 | Footbridge |
18 | Roof |
Building 27[edit | edit source]
Floors | Usage |
---|---|
B7 | Service Basement |
B6 | Tunnel to Building 24 |
B5-B1 | Basement |
G | Ground Floor |
1-5 | Special Patient Rooms |
6 | Mechanical |
7 | Footbridge |
8 | Special Patient Rooms |
9 | Roof |
Building 28[edit | edit source]
Floors | Usage |
---|---|
B2-B1 | Basement |
G | Ground Floor |
1-3 | Offices |
4 | Mechanical |
5-6 | Offices |
7 | Footbridge |
8-16 | Offices |
17 | Footbridge |
18-24 | Offices |
25 | Mechanical |
26 | Offices |
27 | Footbridge / Roof |
Building 29 (Service Building)[edit | edit source]
Floors | Usage |
---|---|
1 (B6) | Tunnel |
2-3 (B2-B1) | Basement and Tunnel Connector to Building 28 |
4 (0) | Ground Floor |
5-10 (1-6) | Communications |
11 (7) | Footbridge to Building 28 |
12 (8) | Communications Topside |
13 (9) | Roof |
File 7[edit | edit source]
Building 30[edit | edit source]
Floors | Usage |
---|---|
SB (B7) | Sub-Basement |
B2-B1 (B6-B5) | Basement Levels |
1 (B4) | Lower Level 2 |
1R (B3) | Tunnel to Buildings 31-33 |
2 (B2) | Lower Level 1 |
2R (B1) | Storage |
L (0) | Lobby |
3 (1) | Mezzanine |
4-12 (2-10) | Patient Rooms |
14-19 (11-16) | Patient Rooms |
PH (17) | Penthouse |
R (18) | Roof |
Building 31[edit | edit source]
Floors | Usage |
---|---|
SB | Sub-Basement |
B6-B5 | Storage |
B4 | Lower Level 2 |
B3 | Tunnel to Buildings 30, 32-33 |
B2 | Storage |
B1 | Lower Level 1 |
L | Lobby |
M | Mezzanine |
2-9 | Offices |
10 | Mechanical |
11 | Roof |
Building 32[edit | edit source]
Floors | Usage |
---|---|
LL3 | Storage |
T | Tunnel to Buildings 30-31, 33 |
LL2-LL1 | Lower Levels |
1 | Lobby |
2-12 | Offices |
14 | Mechanical |
15 | Roof |
Building 33[edit | edit source]
Floors | Usage |
---|---|
LL3 (-6) | Lower Level 3 |
L3M (-5) | Storage |
LL2 (-4) | Lower Level 2 |
L2M (-3) | Tunnel to Buildings 30-32 |
LL1 (-2) | Lower Level 1 |
L1M (-1) | Storage |
1 (0) | Lobby |
1M (1) | Lobby Mezzanine |
2 | Lower Patient Rooms |
2M (3) | Lower Mezzanine |
3 (4) | Middle Patient Rooms |
3M (5) | Upper Mezzanine |
4 (6) | Upper Patient Rooms |
4M (7) | Mechanical |
5 (8) | Roof |
File 8[edit | edit source]
Building 34[edit | edit source]
Floors | Usage |
---|---|
B8 | Service Basement |
B7-B6 | Unknown |
B5 | Lower Tunnel Level |
B4-B3 | Unknown |
B2 | Upper Tunnel Level |
B1 | Mechanical |
1 | Lobby |
M | Mezzanine |
2 | Mechanical |
3-8 | Patient Rooms |
9 | Lower Footbridge |
10-20 | Patient Rooms |
21 | Upper Footbridge |
22-25 | Patient Rooms |
26 | Mechanical |
27-39 | Patient Rooms |
R | Roof |
Building 35[edit | edit source]
Floors | Usage |
---|---|
B8 | Service Basement |
B7-B6 | Express Zone |
B5 | Lower Tunnel Level |
B4-B3 | Unknown |
B2 | Upper Tunnel Level |
B1 | Unknown |
1 | Lobby |
M | Mezzanine |
2-8 | Offices |
9 | Lower Footbridge |
10-18 | Offices |
19 | Mechanical |
20 | Offices |
21 | Upper Footbridge |
22-24 | Offices |
R | Roof |
Building 36[edit | edit source]
Floors | Usage |
---|---|
B8 | Service Basement |
B7-B6 | Unknown |
B5 | Lower Tunnel Level |
B4 | Mechanical |
B3 | Unknown |
B2 | Upper Tunnel Level |
B1 | Mechanical |
1 | Lobby |
M | Mezzanine |
2 | Mechanical |
3-8 | Offices |
9 | Lower Footbridge |
10 | Mechanical |
11-14 | Offices |
R | Roof |
Building 37[edit | edit source]
Floors | Usage |
---|---|
B8 | Service Basement |
B7-B4 | Express Zone |
B3 | Mechanical |
B2 | Upper Tunnel Level |
B1 | Unknown |
1 | Lobby |
M | Mezzanine |
2-8 | Patient Rooms |
9 | Lower Footbridge |
10-13 | Patient Rooms |
14 | Mechanical |
15-20 | Patient Rooms |
21 | Upper Footbridge |
R | Roof |