LF Integration Project: Difference between revisions
Jump to navigation
Jump to search
m (Updated as I'm on vacation) |
mNo edit summary |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{IpInfo}}{{legit}} | {{IpInfo}}{{legit}} | ||
The '''LF Integration Project''' is a new integration project by [[User:Lighthouse Friesland|Lighthouse Friesland]]. Newer buildings such as [[Centerville Main Hospital]] and some other buildings were added later. | The '''LF Integration Project''' is a new integration project by [[User:Lighthouse Friesland|Lighthouse Friesland]]. It's main building project is [[The Piles Centre]]. Newer buildings such as [[Centerville Main Hospital]] and some other buildings were added later. | ||
In Build 5, I introduced [[RealisticTopBox2024]], a script where users allow to create inspection boxes easier. | In Build 5, I introduced [[RealisticTopBox2024]], a script where users allow to create inspection boxes easier. | ||
A new build is coming every 3-4 weeks, sometimes a few days or more than 3-4 weeks. | A new build is coming every 3-4 weeks, sometimes a few days or more than 3-4 weeks. | ||
Line 82: | Line 80: | ||
* [[Grape Residences|{{Font Colour|Grape Residences|yellow}}]] | * [[Grape Residences|{{Font Colour|Grape Residences|yellow}}]] | ||
* [[B&B Hotel Central Berlin|{{Font Colour|B&B Hotel Central Berlin|darkred}}]] | * [[B&B Hotel Central Berlin|{{Font Colour|B&B Hotel Central Berlin|darkred}}]] | ||
* [[Kollhoff-Tower]] (On Hold) | |||
* [[Skyscraperville High Street|{{Font Colour|Skyscraperville High Street|red}}]] Phase II (Market Subway Station and Thalia bookstore) | * [[Skyscraperville High Street|{{Font Colour|Skyscraperville High Street|red}}]] Phase II (Market Subway Station and Thalia bookstore) | ||
* [[Helgoland cruise ship|{{Font Colour|Helgoland cruise ship|red}}]] | * [[Helgoland cruise ship|{{Font Colour|Helgoland cruise ship|red}}]] |
Latest revision as of 10:46, 21 November 2024
Integration Project Info* | ||
---|---|---|
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
It contains good-faith information, such as an existing building or content. |
The LF Integration Project is a new integration project by Lighthouse Friesland. It's main building project is The Piles Centre. Newer buildings such as Centerville Main Hospital and some other buildings were added later.
In Build 5, I introduced RealisticTopBox2024, a script where users allow to create inspection boxes easier.
A new build is coming every 3-4 weeks, sometimes a few days or more than 3-4 weeks.
Versions[edit | edit source]
Legend
- Red: Build is no longer supported
- Yellow: Build will end support soon
- Green: Supported
- Build 1 - 21/02/2024 (Support ended on 26/02/2024)
- Build 2 - 26/02/2024 (Support ended on 14/03/2024)
- Build 3 - 14/03/2024 (Support ended on 30/03/2024)
- Build 4 - 30/03/2024 (Support ended on 14/04/2024)
- Build 4.5 - 14/04/2024 (Support ended on 11/06/2024)
- Build 5 - 11/06/2024
History[edit | edit source]
- Before October 2023, all buildings were released in My skyscrapersim buildings on Scratch.
- Since October 2023 and before this IP, all buildings were released in LF Data Pack. Due to the cost of downloading folders on MediaFire, I've abandoned my data pack and released this IP.
- In April 2024, the RealisticTopBox2024 script was created to allow people adding an inspection box on top of the elevators easily. It was released 2 months later.
Buildings[edit | edit source]
Legend
- Red: Not started / Planned
- Dark Red: Cancelled
- Yellow: In progress (1x) / Completed (2x)
- Blue: Released, but still in progress
- Green: Released and completed
- Purple: Replaced
- Orange: Released, but is discontinued
Since Build 1[edit | edit source]
- Berlin TV Tower
- C&A Coalham
- Centerville Street 24 in Skyscraperville
- Coalham High School
- Holiday Inn Apartement Skyscraperville
- Messeturm Frankfurt (aka Frankfurt Trade Fair Tower, or simply MesseTurm)
- Motel One Coalham
- My Observation Tower (aka Skyscraperville Observation Tower, or 1 George Street)
- Park Inn Tower Berlin
Since Build 2[edit | edit source]
Since Build 3[edit | edit source]
- Lighthouse Friesland Plaza v2 *
- Ssv - City Center P-Garage *
- Ssv - Coalham Street P-Garage *
- Ssv - Central Railway Station P-Garage *
- Ssv - LF Plaza Underground CP *
- Ssv - Market Place Underground CP *
- DTSsv - Galleria Sports *
Since Build 4[edit | edit source]
- Skyscraperville Towers *
- Centerville Main Hospital v2 *
- Simple - Locked Off Elevator *
- Simple - Modern Lutz *
- Marriott Marquis Skyscraperville *
- Simple - LF Testing *
Since Build 4.5[edit | edit source]
- The Piles Centre Phase I *
Since Build 5[edit | edit source]
- The Piles Centre Phase II *
- Elevator Museum Skyscraperville (V2) *
- Skyscraperville High Street (Thalia and Fielmann) Phase I *
- Berlin TV Tower (V5) *
- Simple - Realistic Top Box *
- Park Inn Tower Berlin (V3) *
Since Upcoming Build 6[edit | edit source]
- The Piles Centre Phase III
- Grape Residences
- B&B Hotel Central Berlin
- Kollhoff-Tower (On Hold)
- Skyscraperville High Street Phase II (Market Subway Station and Thalia bookstore)
- Helgoland cruise ship