NTCC/Palmetto Building: Difference between revisions
Jump to navigation
Jump to search
MelvinMan10 (talk | contribs) Created page with "The '''Palmetto Building''' is an expansion south of the main NTCC complex. It is currently under construction. Category:Northeast Triad Convention Center" |
MelvinMan10 (talk | contribs) mNo edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
:<small>< [[Northeast Triad Convention Center]]</small><br> | |||
The '''Palmetto Building''' is an expansion south of the main [[NTCC]] complex. It is currently under construction. | The '''Palmetto Building''' is an expansion south of the main [[NTCC]] complex. It is currently under construction. | ||
== Current floor assignments == | |||
*'''B''' - Tunnel to [[NTCC/Main complex|main complex]] and [[NTCC/Doolittle Meridian Center#Doolittle Street Parking Garage|Doolittle St. Parking Garage]] | |||
*'''1 and up''' - ''Under construction'' | |||
[[Category:Northeast Triad Convention Center]] | [[Category:Northeast Triad Convention Center]] |
Latest revision as of 04:11, 20 July 2025
The Palmetto Building is an expansion south of the main NTCC complex. It is currently under construction.
Current floor assignments[edit | edit source]
- B - Tunnel to main complex and Doolittle St. Parking Garage
- 1 and up - Under construction