Pyramid Park Delta City: Difference between revisions
Jump to navigation
Jump to search
Elevator1512 (talk | contribs) No edit summary |
Elevator1512 (talk | contribs) m →Floors |
||
| (16 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
'''Pyramid Park Delta City''' is a planned | {{legit}}{{IpInfo/E1512}}{{future infrastructure}} | ||
'''Pyramid Park Delta City''' is a planned office tower to be located in [[Delta City]] and currently being built by elevator1512. It is currently the main building project for the [[E1512 Integration Project]]. | |||
== Floors == | == Floors == | ||
''The floor plans below have not yet been finalized. There will be a midpoint amenity taking up floors 35-36, with most elevators stopping at one or both of those floors. Also, italicized floors are not yet finalized.'' | |||
* '''''B5-B1''' - Basement Floors'' | |||
* '''B5-B1''' - | * '''L''' - Main Lobby | ||
* ''' | * '''''M''' - Mezzanine / Management'' | ||
* ''' | * '''''MZ''' - Upper Mezzanine / Maintenance'' | ||
* ''' | * '''''2-34''' - Offices (no 13th floor)'' | ||
* ''' | * '''''35-36''' - Midway Interchange and Special Offices'' | ||
* ''' | * '''''37''''' - Lower Mechanical | ||
* '''''37M''''' - Lower Mechanical Mezzanine | |||
* '''''38''-67''' - Offices | |||
* '''68-72''' - Executive Offices | |||
* '''73''' - Upper Mechanical | |||
* '''73M''' - Upper Mechanical Mezzanine | |||
* '''R''' - Roof | * '''R''' - Roof | ||
[[Category:Elevator1512's buildings]] | [[Category:Elevator1512's buildings]] | ||
Latest revision as of 21:44, 18 June 2026
It contains good-faith information, such as an existing building or content. |
| This article describes a building that is currently part of the E1512 Integration Project by elevator1512. It can be found here on the Skyscraper Simulator Forum. |
|---|
|
Pyramid Park Delta City is a planned office tower to be located in Delta City and currently being built by elevator1512. It is currently the main building project for the E1512 Integration Project.
Floors[edit | edit source]
The floor plans below have not yet been finalized. There will be a midpoint amenity taking up floors 35-36, with most elevators stopping at one or both of those floors. Also, italicized floors are not yet finalized.
- B5-B1 - Basement Floors
- L - Main Lobby
- M - Mezzanine / Management
- MZ - Upper Mezzanine / Maintenance
- 2-34 - Offices (no 13th floor)
- 35-36 - Midway Interchange and Special Offices
- 37 - Lower Mechanical
- 37M - Lower Mechanical Mezzanine
- 38-67 - Offices
- 68-72 - Executive Offices
- 73 - Upper Mechanical
- 73M - Upper Mechanical Mezzanine
- R - Roof