Pyramid Park Delta City: Difference between revisions
Jump to navigation
Jump to search
Elevator1512 (talk | contribs) |
Elevator1512 (talk | contribs) moving to just one tower now |
||
| (7 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{legit}}{{IpInfo/E1512}} | {{legit}}{{IpInfo/E1512}}{{future infrastructure}} | ||
'''Pyramid Park Delta City''' is a planned | '''Pyramid Park Delta City''' is a planned office tower to be located in [[Delta City]] and currently being built by elevator1512. It is currently the main building project for the [[E1512 Integration Project]]. | ||
== Floors == | == Floors == | ||
''The floor plans below have not yet been finalized. I might add a midpoint amenity taking up floors 34-35, with most elevators stopping at one or both of those floors.'' | |||
''The floor plans below have not yet been finalized.'' | * '''SB''' - Sub-Basement | ||
* ''' | * '''B''' - Lower Level | ||
* '''1''' - Main Lobby | * '''1''' - Main Lobby | ||
* '''2''' - Upper Lobby | * '''2''' - Upper Lobby | ||
* ''' | * '''M''' - Mezzanine / Management | ||
* ''' | * '''3-33''' - Offices (no 13th floor) | ||
* '''34-35''' - Midway Interchange and Special Offices | |||
* '''36''' - Lower Mechanical | |||
* '''36M''' - Lower Mechanical Mezzanine | |||
* '''37-66''' - Offices | |||
* '''67-71''' - Executive Offices | |||
* '''72''' - Upper Mechanical | |||
* '''72M''' - Upper Mechanical Mezzanine | |||
* '''R''' - Roof | * '''R''' - Roof | ||
[[Category:Elevator1512's buildings]] | [[Category:Elevator1512's buildings]] | ||
Latest revision as of 09:46, 8 March 2026
It contains good-faith information, such as an existing building or content. |
| This article describes a building that is currently part of the E1512 Integration Project by elevator1512. It can be found here on the Skyscraper Simulator Forum. |
|---|
|
Pyramid Park Delta City is a planned office tower to be located in Delta City and currently being built by elevator1512. It is currently the main building project for the E1512 Integration Project.
Floors[edit | edit source]
The floor plans below have not yet been finalized. I might add a midpoint amenity taking up floors 34-35, with most elevators stopping at one or both of those floors.
- SB - Sub-Basement
- B - Lower Level
- 1 - Main Lobby
- 2 - Upper Lobby
- M - Mezzanine / Management
- 3-33 - Offices (no 13th floor)
- 34-35 - Midway Interchange and Special Offices
- 36 - Lower Mechanical
- 36M - Lower Mechanical Mezzanine
- 37-66 - Offices
- 67-71 - Executive Offices
- 72 - Upper Mechanical
- 72M - Upper Mechanical Mezzanine
- R - Roof