Spacetime Plaza Screenshots: Difference between revisions
Jump to navigation
Jump to search
MelvinMan10 (talk | contribs) |
MelvinMan10 (talk | contribs) mNo edit summary |
||
| (13 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
<center>[[STP|Building information]]<br></center> | <center>[[STP|Building information]]<br> | ||
'''Note:''' This place is still under development, so the final product may change greatly from these pictures.</center> | |||
==Overview== | ==Overview== | ||
<gallery> | <gallery> | ||
STP_Exterior_NE.jpg|Looking at the main shopping areas from the northeast, with the tall buildings seen in background ( | STP_Exterior_NE.jpg|Looking at the main shopping areas from the northeast, with the tall buildings seen in background (7 August 2026) | ||
STP_Exterior_SW.jpg|Looking from the southwest, with the Lavender Moon Hotel and Miriam Tower visible ( | STP_Exterior_SW.jpg|Looking from the southwest, with the Lavender Moon Hotel and Miriam Tower visible (7 August 2026) | ||
</gallery> | </gallery> | ||
==Main mall== | ==Main mall== | ||
<gallery> | <gallery> | ||
STP_Mall_Center_Atrium.jpg| | STP_Mall_Center_Atrium.jpg|Center atrium with the glass elevators (5 August 2026) | ||
STP_Main_Glass_Elev.jpg|A glass elevator at the center of the main mall (5 August 2026) | STP_Main_Glass_Elev.jpg|A glass elevator at the center of the main mall (5 August 2026) | ||
STP_Mall_EastAnnex.jpg|Escalators inside the East Annex (3 August 2026) | STP_Mall_EastAnnex.jpg|Escalators inside the East Annex (3 August 2026) | ||
STP_Mall_Parking_Elev_1.jpg|Parking elevator lobby on the 6<sup>th</sup> floor | STP_Mall_Parking_Elev_1.jpg|Parking elevator lobby on the 6<sup>th</sup> floor (6 May 2026) | ||
STP_Mall_Parking_Elev_2.jpg|Inside one of the parking elevators (10 June 2026) | STP_Mall_Parking_Elev_2.jpg|Inside one of the parking elevators (10 June 2026) | ||
STP_Mall_Parking_Elev_3.jpg|Parking elevator lobby on the 10<sup>th</sup> floor (10 June 2026) | STP_Mall_Parking_Elev_3.jpg|Parking elevator lobby on the 10<sup>th</sup> floor (10 June 2026) | ||
STP_Mall_East_Elev_1.jpg|One of the elevators at the mall's east side (13 May 2026) | STP_Mall_East_Elev_1.jpg|One of the elevators at the mall's east side (13 May 2026) | ||
STP_Mall_East_Elev_2.jpg|Another bank of elevators with different floor indicators (13 May 2026) | STP_Mall_East_Elev_2.jpg|Another bank of elevators with different floor indicators (13 May 2026) | ||
STP_Mall_WestLD.jpg|West loading dock with the freight elevators (6 August 2026) | |||
STP_Mall_1F_ServHall.jpg|Inside the service hallway on the 1<sup>st</sup> floor (6 August 2026) | |||
STP_Mall_FE1.jpg|The two freight elevators, one small and one large (6 August 2026) | |||
STP_Mall_FE2.jpg|The small freight elevator (6 August 2026) | |||
STP_Mall_FE3.jpg|Inside the small freight elevator (6 August 2026) | |||
STP_Mall_FE4.jpg|Riding the small freight elevator (6 August 2026) | |||
STP_Mall_FE5.jpg|Looking at the interior of both freight elevators (6 August 2026) | |||
</gallery> | </gallery> | ||
| Line 30: | Line 38: | ||
<gallery> | <gallery> | ||
STP_ACTT_Lobby.jpg|Lobby area on the 1<sup>st</sup> floor (11 June 2026) | STP_ACTT_Lobby.jpg|Lobby area on the 1<sup>st</sup> floor (11 June 2026) | ||
STP_ACTT_34thFloor.jpg|One of the office floors ( | STP_ACTT_34thFloor.jpg|One of the office floors (20 August 2026) | ||
STP_ACTT_HZ_Elev.jpg|An office local elevator ( | STP_ACTT_HZ_Elev.jpg|An office local elevator (23 June 2026) | ||
STP_ACTT_LMZ_Elev.jpg|Another office elevator with a different interior (5 June 2026) | STP_ACTT_LMZ_Elev.jpg|Another office elevator with a different interior (5 June 2026) | ||
STP_ACTT_PKElev1.jpg|Looking at the parking elevators (4 June 2026) | STP_ACTT_PKElev1.jpg|Looking at the parking elevators (4 June 2026) | ||
| Line 44: | Line 52: | ||
STP_LMH_PKElev2.jpg|Riding a parking elevator to the 7<sup>th</sup> floor (23 June 2026) | STP_LMH_PKElev2.jpg|Riding a parking elevator to the 7<sup>th</sup> floor (23 June 2026) | ||
STP_LMH_HZElev.jpg|A hotel local elevator (5 August 2026) | STP_LMH_HZElev.jpg|A hotel local elevator (5 August 2026) | ||
STP_UndergroundLD_1.jpg|Underground loading dock between the hotel and Monica Dept. Store (7 August 2026) | |||
STP_UndergroundLD_2.jpg|Another look at the underground loading dock (7 August 2026) | |||
STP_LuminaPG_B1F.jpg|Parking entrance on level B1 (7 August 2026) | |||
</gallery> | </gallery> | ||
| Line 53: | Line 64: | ||
STP_Mall_NEParking_B1F_2.jpg|Another look at the northeastern end of level B1 (10 June 2026) | STP_Mall_NEParking_B1F_2.jpg|Another look at the northeastern end of level B1 (10 June 2026) | ||
STP_Mall_NEParking_B2F_1.jpg|Northeastern end of level B2, with both elevator lobbies of Monica Dept. Store completed (10 June 2026) | STP_Mall_NEParking_B2F_1.jpg|Northeastern end of level B2, with both elevator lobbies of Monica Dept. Store completed (10 June 2026) | ||
STP_Mall_EastEscLby_1.jpg|East escalator lobby (1) (5 August 2026) | |||
STP_Mall_EastEscLby_2.jpg|East escalator lobby (2) (5 August 2026) | |||
STP_Mall_WestEscLby_3.jpg|West escalator lobby (5 August 2026) | |||
</gallery> | </gallery> | ||
[[Category:Screenshots]] | [[Category:Screenshots]] | ||
[[Category:Spacetime Plaza Screenshots|*]] | [[Category:Spacetime Plaza Screenshots|*]] | ||
Latest revision as of 05:07, 20 August 2026
Note: This place is still under development, so the final product may change greatly from these pictures.
Overview[edit | edit source]
-
Looking at the main shopping areas from the northeast, with the tall buildings seen in background (7 August 2026)
-
Looking from the southwest, with the Lavender Moon Hotel and Miriam Tower visible (7 August 2026)
Main mall[edit | edit source]
-
Center atrium with the glass elevators (5 August 2026)
-
A glass elevator at the center of the main mall (5 August 2026)
-
Escalators inside the East Annex (3 August 2026)
-
Parking elevator lobby on the 6th floor (6 May 2026)
-
Inside one of the parking elevators (10 June 2026)
-
Parking elevator lobby on the 10th floor (10 June 2026)
-
One of the elevators at the mall's east side (13 May 2026)
-
Another bank of elevators with different floor indicators (13 May 2026)
-
West loading dock with the freight elevators (6 August 2026)
-
Inside the service hallway on the 1st floor (6 August 2026)
-
The two freight elevators, one small and one large (6 August 2026)
-
The small freight elevator (6 August 2026)
-
Inside the small freight elevator (6 August 2026)
-
Riding the small freight elevator (6 August 2026)
-
Looking at the interior of both freight elevators (6 August 2026)
April Dept. Store and Tower[edit | edit source]
-
Lobby area on level B2, with the elevators and escalators visible (19 June 2026)
-
Outside the lobby area on level B2 (19 June 2026)
-
Level B1 elevator lobby, with the escalators seen in background (19 June 2026)
-
April Tower's elevators on the 3rd floor (6 May 2026)
-
Inside one of April Tower's elevators (6 May 2026)
Miriam Tower[edit | edit source]
-
Lobby area on the 1st floor (11 June 2026)
-
One of the office floors (20 August 2026)
-
An office local elevator (23 June 2026)
-
Another office elevator with a different interior (5 June 2026)
-
Looking at the parking elevators (4 June 2026)
-
Inside one of the parking elevators (5 June 2026)
Lumina Parking Garage and Lavender Moon Hotel[edit | edit source]
-
Parking elevators on the 1st floor (23 June 2026)
-
Looking closer to a parking elevator (23 June 2026)
-
Inside one of the parking elevators (23 June 2026)
-
Riding a parking elevator to the 7th floor (23 June 2026)
-
A hotel local elevator (5 August 2026)
-
Underground loading dock between the hotel and Monica Dept. Store (7 August 2026)
-
Another look at the underground loading dock (7 August 2026)
-
Parking entrance on level B1 (7 August 2026)
Underground parking garage[edit | edit source]
-
Ramps connecting the southeastern side of levels B1 and B2 (3 August 2026)
-
Ramps connecting the northeastern side of levels B1 and B2 (3 August 2026)
-
Northeastern end of the parking garage on level B1, underneath the Monica Dept. Store (10 June 2026)
-
Another look at the northeastern end of level B1 (10 June 2026)
-
Northeastern end of level B2, with both elevator lobbies of Monica Dept. Store completed (10 June 2026)
-
East escalator lobby (1) (5 August 2026)
-
East escalator lobby (2) (5 August 2026)
-
West escalator lobby (5 August 2026)