Spacetime Plaza Screenshots: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
MelvinMan10 (talk | contribs)
MelvinMan10 (talk | contribs)
mNo edit summary
 
Line 1: Line 1:
<center>[[STP|Building information]]<br>
<center>[[STP|Building information]]<br>
[[Spacetime Plaza Screenshots|Page 1]], [[Spacetime Plaza Screenshots/2|Page 2]]<br>
'''Note:''' This place is still under development, so the final product may change greatly from these pictures.</center>
'''Note:''' This place is still under development, so the final product may change greatly from these pictures.</center>
==Overview==
==Overview==
Line 44: Line 45:
STP_MDS_7F_STA1.jpg|Looking at the elevator and escalators on the 7<sup>th</sup> floor (6 September 2026)
STP_MDS_7F_STA1.jpg|Looking at the elevator and escalators on the 7<sup>th</sup> floor (6 September 2026)
STP_MDS_7F_STA2.jpg|Another look of the 7<sup>th</sup> floor, with the glass elevators visible (6 September 2026)
STP_MDS_7F_STA2.jpg|Another look of the 7<sup>th</sup> floor, with the glass elevators visible (6 September 2026)
</gallery>
==Miriam Tower==
<gallery>
STP_ACTT_Lobby.jpg|Lobby area on the 1<sup>st</sup> floor (11 June 2026)
STP_ACTT_HZ_Elev.jpg|An office local elevator (23 June 2026)
STP_ACTT_LMZ_Elev.jpg|Another office elevator with a different interior (5 June 2026)
STP_ACTT_34thFloor.jpg|One of the office floors (20 August 2026)
STP_ACTT_PKElev1.jpg|Looking at the parking elevators (4 June 2026)
STP_ACTT_PKElev2.jpg|Inside one of the parking elevators (5 June 2026)
</gallery>
==Lumina Parking Garage and Lavender Moon Hotel==
<gallery>
STP_LuminaPG_Elev1.jpg|Parking elevators on the 1<sup>st</sup> floor (6 September 2026)
STP_LuminaPG_Elev2.jpg|Looking closer to a parking elevator (5 September 2026)
STP_LuminaPG_Elev3.jpg|Inside one of the parking elevators (6 September 2026)
STP_LuminaPG_Elev4.jpg|Riding a parking elevator upstairs (5 September 2026)
STP_LMH_HZElev.jpg|A hotel local elevator (5 August 2026)
STP_UndergroundLD_1.jpg|Underground loading dock between the hotel and Monica Dept. Store (7 August 2026)
STP_UndergroundLD_2.jpg|Another look at the underground loading dock (7 August 2026)
STP_LuminaPG_B1F.jpg|Parking entrance on level B1 (7 August 2026)
STP_LMH_ServiceHall.jpg|A service hallway on a hotel level (6 September 2026)
STP_LMH_TowerSE.jpg|Inside one of the Tower Service Elevators (6 September 2026)
STP_LMH_PodiumSE.jpg|Inside the Podium Service Elevator (6 September 2026)
</gallery>
==Underground parking garage==
<gallery>
STP_Mall_East_ParkingRamp.jpg|Ramps connecting the southeastern side of levels B1 and B2 (3 August 2026)
STP_Mall_East_ParkingRamp_2.jpg|Ramps connecting the northeastern side of levels B1 and B2 (3 August 2026)
STP_Mall_NEParking_B1F_1.jpg|Northeastern end of the parking garage on level B1, underneath the Monica Dept. Store (10 June 2026)
STP_Mall_NEParking_B1F_2.jpg|Another look at the northeastern end of level B1 (10 June 2026)
STP_Mall_NEParking_B2F_1.jpg|Northeastern end of level B2, with both elevator lobbies of Monica Dept. Store completed (10 June 2026)
STP_Mall_EastEscLby_1.jpg|East escalator lobby (1) (5 August 2026)
STP_Mall_EastEscLby_2.jpg|East escalator lobby (2) (5 August 2026)
STP_Mall_WestEscLby_3.jpg|West escalator lobby (5 August 2026)
</gallery>
</gallery>


[[Category:Screenshots]]
[[Category:Screenshots]]
[[Category:Spacetime Plaza Screenshots|*]]
[[Category:Spacetime Plaza Screenshots|*]]

Latest revision as of 10:56, 6 September 2026

Building information

Page 1, Page 2

Note: This place is still under development, so the final product may change greatly from these pictures.

Overview[edit | edit source]

Main mall[edit | edit source]

April Dept. Store and Tower[edit | edit source]

Monica Department Store[edit | edit source]