Terrace Border V2: Difference between revisions
Jump to navigation
Jump to search
MelvinMan10 (talk | contribs) m →Floors |
MelvinMan10 (talk | contribs) m 1-12 and 14-31 = 30 floors. |
||
(11 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
:<small>< [[Terrace V3]]</small><br> | |||
'''Terrace Border V2''' is a | ''This article is about Terrace Border's current version. For the original one, please refer to [[Terrace Border|this page]] instead.'' | ||
== | |||
* '''SB''' - Sub-Basement | '''Terrace Border V2''' is a 30-floor office building created by EG881. It is currently a part of the [[EG881 Integration Project]]. The building splits into two towers from the 17th floor upwards. | ||
* '''B''' - Basement | ==Current floor assignments== | ||
===Office towers=== | |||
*'''SB''' - Sub-Basement (service area) | |||
*'''B''' - Basement | |||
*'''1''' - Lobby | *'''1''' - Lobby | ||
*'''2-16''' - Atrium Offices | *'''2-16''' - Atrium Offices (No 13<sup>th</sup> floor) | ||
*'''17-30''' - Offices | *'''17-30''' - Offices | ||
*'''31''' - Mechanical | *'''31''' - Mechanical | ||
*'''R''' - Roof | *'''R''' - Roof | ||
[[Category: | ===Parking garage=== | ||
* '''SB''' - Sub-Basement, Loading Dock | |||
* '''B''' - Basement | |||
* '''1''' - Ground Floor, Parking | |||
* '''2-<abbr title="Roof level.">6</abbr>''' - Parking | |||
== See also== | |||
*[[Terrace V3/Original buildings]] | |||
*[[Terrace V3/Northern expansion]] | |||
[[Category:Terrace V3]] |
Latest revision as of 07:08, 22 July 2025
This article is about Terrace Border's current version. For the original one, please refer to this page instead.
Terrace Border V2 is a 30-floor office building created by EG881. It is currently a part of the EG881 Integration Project. The building splits into two towers from the 17th floor upwards.
Current floor assignments[edit | edit source]
Office towers[edit | edit source]
- SB - Sub-Basement (service area)
- B - Basement
- 1 - Lobby
- 2-16 - Atrium Offices (No 13th floor)
- 17-30 - Offices
- 31 - Mechanical
- R - Roof
Parking garage[edit | edit source]
- SB - Sub-Basement, Loading Dock
- B - Basement
- 1 - Ground Floor, Parking
- 2-6 - Parking