Line Hospital (V1): Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
Line 369: Line 369:


=== File 7 ===
=== File 7 ===
==== Building 30 ====
* '''SB (B7)''' - Sub-Basement
* '''B2-B1 (B6-B5)''' - Basement Levels
* '''1 (B4)''' - Lower Level 2
* '''1R (B3)''' - Tunnel to Other Buildings
* '''2 (B2)''' - Lower Level 1
* '''2R (B1)''' - Storage
* '''L (0)''' - Lobby
* '''3 (1)''' - Mezzanine
* '''4-12 (2-10)''' - Patient Rooms
* '''14-19 (11-16)''' - Patient Rooms
* '''PH (17)''' - Penthouse
* '''R (18)''' - Roof
==== Building 31 ====
* '''SB''' - Sub-Basement
* '''B6-B5''' - Storage
* '''B4''' - Lower Level 2
* '''B3''' - Tunnel to Other Buildings
* '''B2''' - Storage
* '''B1''' - Lower Level 1
* '''L''' - Lobby
* '''M''' - Mezzanine
* '''2-9''' - Offices
* '''10''' - Mechanical
* '''11''' - Roof
==== Building 32 ====
* '''LL3''' - Storage
* '''T''' - Tunnel to Other Buildings
* '''LL2-LL1''' - Lower Levels
* '''1 (0)''' - Lobby
* '''2-12''' - Offices
* '''14''' - Mechanical
* '''15''' - Roof
==== Building 33 ====
* '''LL3 (-6)''' - Lower Level 3
* '''L3M (-5)''' - Storage
* '''LL2 (-4)''' - Lower Level 2
* '''L2M (-3)''' - Tunnel to Other Buildings
* '''LL1 (-2)''' - Lower Level 1
* '''L1M (-1)''' - Storage
* '''1 (0)''' - Lobby
* '''1M (1)''' - Lobby Mezzanine
* '''2''' - Lower Patient Rooms
* '''2M (3)''' - Lower Mezzanine
* '''3 (4)''' - Middle Patient Rooms
* '''3M (5)''' - Upper Mezzanine
* '''4 (6)''' - Upper Patient Rooms
* '''4M (7)''' - Mechanical
* '''5 (8)''' - Roof
=== File 8 ===
=== File 8 ===
== See also ==
== See also ==

Revision as of 14:23, 31 July 2023

For the planned building with the same name, please go to this page.

Line Hospital V1 is a building complex that was made by elevator1512. There are a total of 8 separate building files and 37 buildings in the complex.

Floors

File 1

Building 1

  • T3-T1 - Storage Rooms
  • L2 - Lower Ground Section 2
  • M - Maintenance Level
  • L1 - Lower Ground Section 1
  • LG - Ground Floor
  • UG - Upper Ground Floor
  • 1-19 - Patient Rooms
  • 20 - Lower Footbridge
  • 21-29 - Patient Rooms
  • 30 - Upper Footbridge
  • 31-32 - Patient Rooms
  • 33-34 - Mechanical

Building 2

  • SB - Subterranean Basement
  • B - Basement
  • T3-T1 - Storage Rooms
  • L2 - Lower Ground Section 2
  • M - Maintenance Level
  • L1 - Lower Ground Section 1
  • LG - Ground Floor
  • UG - Upper Ground Floor
  • 1-24 - Patient Rooms
  • 25 - Lower Footbridge
  • 26-29 - Offices
  • 30 - Upper Footbridge
  • 31 - Mechanical

Building 3

  • SB - Subterranean Basement
  • B - Basement
  • T3-T1 - Storage Rooms
  • L2 - Lower Ground Section 2
  • M - Mezzanine
  • L1 - Lower Ground Section 1
  • LG - Ground Floor
  • UG - Upper Ground Floor
  • 1-19 - Patient Rooms
  • 20 - Lower Footbridge
  • 21-24 - Patient Rooms
  • 25 - Upper Footbridge
  • 26 - Mechanical

Building 4

  • SB - Subterranean Basement
  • B - Basement
  • T3-T1 - Storage Rooms
  • L2 - Lower Ground Section 2
  • M - Maintenance Level
  • L1 - Lower Ground Section 1
  • LG - Ground Floor
  • UG - Upper Ground Floor
  • 1-6 - Critical Care Units
  • 7-19 - Regular Units
  • 20 - Footbridge
  • 21-22 - Mechanical

Communications Building (Building 5)

  • T2-T1 - Storage Rooms
  • L2 - Generator for Building 1
  • M - Tunnel to Buildings 1 through 4
  • L1 - Generator for Buildings 2 and 3
  • LG - Communications
  • UG - Communications
  • 1-4 - Communications

File 2

Building 6

  • B3 - Lower Basement
  • M - Basement Mezzanine
  • B2 - Middle Basement
  • B1 - Upper Basement
  • 1 - Lobby
  • 1A - Atrium
  • 2-8 - Patient Rooms
  • 9 - Mechanical

Building 7

  • B5 - Generator Room
  • B4 - Lower Basement
  • B3 - Mezzanine
  • M - Basement Mezzanine
  • B2 - Middle Basement
  • B1 - Upper Basement
  • 1 - Lobby
  • 1A - Atrium
  • 2-9 - Offices
  • 10 - Footbridge
  • 11-12 - Upper Offices
  • 13 - Mechanical

Building 8

  • B3-B1 - Underground Crosswalk
  • 1 - Lobby
  • 1A - Atrium
  • 2-9 - Lower Patient Rooms
  • 10 - Lower Footbridge
  • 11 - Lower Mechanical
  • 12-19 - Middle Patient Rooms
  • 20 - Upper Footbridge
  • 21-31 - Upper Patient Rooms
  • 32-33 - Mechanical
  • H - Heliport Level

Building 9

  • SB - Subterranean Basement
  • SM - Subterranean Basement Mezzanine
  • B4 - Storage Area
  • B3 - Lower Basement
  • M - Basement Mezzanine
  • B2 - Middle Basement
  • B1 - Upper Basement
  • 1 - Lobby
  • 1A - Atrium
  • 2 - Emergency Room
  • 3-5 - Extended Stay Patient Rooms
  • 6-9 - Lower Patient Rooms
  • 10 - Lower Footbridge
  • 11-19 - Upper Patient Rooms
  • 20 - Upper Footbridge
  • 21-24 - Offices
  • 25-26 - Mechanical
  • 27 - Roof

Building 10

  • B3 - Lower Basement
  • M - Basement Mezzanine
  • B2 - Middle Basement
  • B1 - Upper Basement
  • 1 - Lobby
  • 1A - Atrium
  • 2-9 - Lower Patient Rooms
  • 10 - Lower Footbridge
  • 11-18 - Upper Patient Rooms
  • 19 - Mechanical
  • 20 - Upper Footbridge
  • 21 - Roof

Communications Building (Building 11)

  • B3 - Lower Basement
  • M - Basement Mezzanine
  • B2 - Middle Basement
  • B1 - Upper Basement
  • 1 - Exit and Storage
  • 1A - Storage
  • 2-3 - Storage

File 3

Building 12

  • S2-S1 - Sub-Basement Level
  • B5-B4 - Lower Basement Floor
  • B3 - Basement Tunnel Section
  • B2-B1 - Upper Basement Floors
  • 1 - Main Entrance
  • 2-4 - Critical Care Patient Rooms
  • M - Lower Crosswalk
  • 5-9 - Lower Patient Rooms
  • 10 - Main Crosswalk
  • 11 - Lower Mechanical
  • 12-18 - Upper Patient Rooms
  • 19 - Upper Mechanical
  • 20 - Upper Crosswalk
  • 21-27 - Hospital Offices
  • H - Heliport Area

Building 13

  • B4 - Tunnel to Building 9
  • B3 - Tunnel to Buildings 12 and 13
  • B2 - Lower Basement
  • B1 - Upper Basement
  • 1 - Main Entrance
  • 2-4 - Offices
  • M - Mezzanine Footbridge
  • 5-6 - Offices
  • 7 - Roof

Building 14

  • S1 - Lower Subterranean Basement
  • B5 - Upper Subterranean Basement
  • B4 - Basement Tunnel
  • B3 - Lower Basement
  • B2 - Middle Basement
  • B1 - Upper Basement
  • 1 - Main Entrance
  • 2-4 - Patient Rooms
  • M - Mezzanine Footbridge
  • 5 - Mechanical
  • 6-9 - Patient Rooms
  • 10 - Main Footbridge
  • 11-12 - Patient Rooms
  • 13 - Mechanical
  • 14 - Roof

Building 15

  • B4 - Storage Level
  • B3 - Basement Tunnel
  • B2 - Lower Basement
  • B1 - Upper Basement
  • 1 - Main Entrance
  • 2-4 - Critical Care Patient Rooms
  • M - Mezzanine Footbridge
  • 5-8 - Patient Rooms
  • 9 - Mechanical
  • 10-19 - Patient Rooms
  • 20 - Footbridge
  • 21 - Patient Rooms
  • 22 - Mechanical
  • 23 - Roof

Communications Building (Building 16)

  • B3 - Lower Basement
  • B2 - Middle Basement
  • B1 - Upper Basement
  • 1 - Lobby
  • 2-4 - Storage
  • M - Storage

File 4

Building 17

  • B3 - Lower Lounge
  • B2 - Storage Room
  • B1 - Basement Tunnel
  • 1 - Main Entrance
  • 2 - Hospital Reception
  • 3-6 - Lower Patient Rooms
  • M - Crosswalk
  • 7-9 - Upper Patient Rooms
  • 10 - Mechanical
  • 11 - Roof

Building 18

  • B2 - Storage Room
  • B1 - Basement Level
  • 1 - Main Entrance
  • 2-6 - Offices
  • M - Lower Crosswalk
  • 7-12 - Offices
  • 13 - Mechanical
  • 14-16 - Executive Offices
  • 17 - Upper Crosswalk
  • 18-24 - Patient Rooms

Building 19

  • B3 - Lower Basement
  • B2 - Storage Room
  • B1 - Main Basement
  • 1 - Main Entrance
  • 2-6 - Patient Rooms
  • M - Footbridge
  • 7-12 - Patient Rooms
  • 13 - Mechanical
  • 14-16 - Patient Rooms
  • 17 - Podium
  • 18-28 - Offices
  • R - Roof

File 5

Building 20

  • B6 - Lower Subterranean Basement
  • B5 - Lower Basement
  • B4 - Upper Subterranean Basement
  • B3 - Basement Tunnel
  • B2 - Middle Basement
  • B1 - Upper Basement
  • 1 - Main Lobby
  • 2-8 - Patient Rooms
  • 9 - Mechanical
  • 10 - Lower Offices
  • P - Office Podium Level
  • 11-18 - Upper Offices
  • M - Mechanical
  • R - Roof

Building 21

  • B4 - Subterranean Basement
  • B3 - Basement Tunnel
  • B2 - Lower Basement
  • B1 - Upper Basement
  • 1 - Main Lobby
  • 2-6 - Offices
  • 7 - Mechanical
  • 8-10 - Lower Patient Rooms
  • P - Podium Level
  • 11-13 - Patient Rooms
  • 14 - Mechanical
  • R - Roof

File 6

Building 22

  • B4-B1 - Basement
  • G - Lobby
  • 1-6 - Patient Rooms
  • 7 - Footbridge
  • 8 - Patient Rooms
  • 9 - Mechanical
  • 10-15 - Patient Rooms
  • 16 - Mechanical
  • 17 - Footbridge
  • 18-26 - Patient Rooms
  • 27 - Footbridge
  • 28 - Patient Rooms
  • 29 - Mechanical
  • 30-36 - Patient Rooms
  • 37 - Roof

Building 23

  • B7-B1 - Basement
  • G - Ground Floor
  • 1 - Special Care Patient Rooms
  • 2 - Mechanical
  • 3-6 - Special Care Patient Rooms
  • 7 - Footbridge
  • 8-16 - Patient Rooms
  • 17 - Footbridge
  • 18-20 - Patient Rooms
  • 21 - Mechanical
  • 22 - Service?
  • 23-26 - Offices
  • 27 - Footbridge
  • 28-41 - Offices
  • 42 - Mechanical
  • 43-44 - Offices
  • R - Roof

Building 24

  • B6-B1 - Basement
  • G - Ground Floor
  • 1-6 - Offices
  • 7 - Footbridge
  • 8-16 - Offices
  • 17 - Footbridge
  • 18 - Offices
  • 19 - Mechanical
  • 20 - Roof

Building 25

  • B2-B1 - Basement
  • G - Ground Floor
  • 1-6 - Offices
  • 7 - Podium
  • 8-13 - Offices
  • 14 - Mechanical
  • 15 - Roof

Building 26

  • B3-B1 - Basement
  • G - Ground Floor
  • 1-6 - Offices
  • 7 - Footbridge
  • 8-10 - Offices
  • 11 - Mechanical
  • 12-16 - Offices
  • 17 - Footbridge
  • 18 - Roof

Building 27

  • B7 - Service Basement
  • B6 - Tunnel to Building 24
  • B5-B1 - Basement
  • G - Ground Floor
  • 1-5 - Special Patient Rooms
  • 6 - Mechanical
  • 7 - Footbridge
  • 8 - Special Patient Rooms
  • 9 - Roof

Building 28

  • B2-B1 - Basement
  • G - Ground Floor
  • 1-3 - Offices
  • 4 - Mechanical
  • 5-6 - Offices
  • 7 - Footbridge
  • 8-16 - Offices
  • 17 - Footbridge
  • 18-24 - Offices
  • 25 - Mechanical
  • 26 - Offices
  • 27 - Footbridge / Roof

Building 29 (Service Building)

  • 1 (B6) - Tunnel
  • 2-3 (B2-B1) - Basement and Tunnel Connector to Building 28
  • 4 (0) - Ground Floor
  • 5-10 (1-6) - Communications
  • 11 (7) - Footbridge to Building 28
  • 12 (8) - Communications Topside

File 7

Building 30

  • SB (B7) - Sub-Basement
  • B2-B1 (B6-B5) - Basement Levels
  • 1 (B4) - Lower Level 2
  • 1R (B3) - Tunnel to Other Buildings
  • 2 (B2) - Lower Level 1
  • 2R (B1) - Storage
  • L (0) - Lobby
  • 3 (1) - Mezzanine
  • 4-12 (2-10) - Patient Rooms
  • 14-19 (11-16) - Patient Rooms
  • PH (17) - Penthouse
  • R (18) - Roof

Building 31

  • SB - Sub-Basement
  • B6-B5 - Storage
  • B4 - Lower Level 2
  • B3 - Tunnel to Other Buildings
  • B2 - Storage
  • B1 - Lower Level 1
  • L - Lobby
  • M - Mezzanine
  • 2-9 - Offices
  • 10 - Mechanical
  • 11 - Roof

Building 32

  • LL3 - Storage
  • T - Tunnel to Other Buildings
  • LL2-LL1 - Lower Levels
  • 1 (0) - Lobby
  • 2-12 - Offices
  • 14 - Mechanical
  • 15 - Roof

Building 33

  • LL3 (-6) - Lower Level 3
  • L3M (-5) - Storage
  • LL2 (-4) - Lower Level 2
  • L2M (-3) - Tunnel to Other Buildings
  • LL1 (-2) - Lower Level 1
  • L1M (-1) - Storage
  • 1 (0) - Lobby
  • 1M (1) - Lobby Mezzanine
  • 2 - Lower Patient Rooms
  • 2M (3) - Lower Mezzanine
  • 3 (4) - Middle Patient Rooms
  • 3M (5) - Upper Mezzanine
  • 4 (6) - Upper Patient Rooms
  • 4M (7) - Mechanical
  • 5 (8) - Roof

File 8

See also