Line Hospital (V1): Difference between revisions
		
		
		
		Jump to navigation
		Jump to search
		
Elevator1512 (talk | contribs)  | 
				Elevator1512 (talk | contribs)  | 
				||
| Line 687: | Line 687: | ||
=== File 4 ===  | === File 4 ===  | ||
==== Building 17 ====  | ==== Building 17 ====  | ||
{| class="wikitable mw-collapsible mw-collapsed"  | |||
|+  | |||
!Floors  | |||
!Usage  | |||
|-  | |||
|'''B3'''  | |||
|Lower Lounge  | |||
|-  | |||
|'''B2'''  | |||
|Storage Room  | |||
|-  | |||
|'''B1'''  | |||
|Basement Tunnel  | |||
|-  | |||
|'''1'''  | |||
|Main Entrance  | |||
|-  | |||
|'''2'''  | |||
|Hospital Reception  | |||
|-  | |||
|'''3-6'''  | |||
|Lower Patient Rooms  | |||
|-  | |||
|'''M'''  | |||
|Crosswalk  | |||
|-  | |||
|'''7-9'''  | |||
|Upper Patient Rooms  | |||
|-  | |||
|'''10'''  | |||
|Mechanical  | |||
|-  | |||
|'''11'''  | |||
|Roof  | |||
|}  | |||
==== Building 18 ====  | ==== Building 18 ====  | ||
{| class="wikitable mw-collapsible mw-collapsed"  | |||
|+  | |||
!Floors  | |||
!Usage  | |||
|-  | |||
|'''B2'''  | |||
|Storage Room  | |||
|-  | |||
|'''B1'''  | |||
|Basement Level  | |||
|-  | |||
|'''1'''  | |||
|Main Entrance  | |||
|-  | |||
|'''2-6'''  | |||
|Offices  | |||
|-  | |||
|'''M'''  | |||
|Lower Crosswalk  | |||
|-  | |||
|'''7-12'''  | |||
|Offices  | |||
|-  | |||
|'''13'''  | |||
|Mechanical  | |||
|-  | |||
|'''14-16'''  | |||
|Executive Offices  | |||
|-  | |||
|'''17'''  | |||
|Upper Crosswalk  | |||
|-  | |||
|'''18-24'''  | |||
|Patient Rooms  | |||
|-  | |||
|'''25'''  | |||
|Roof  | |||
|}  | |||
==== Building 19 ====  | ==== Building 19 ====  | ||
{| class="wikitable mw-collapsible mw-collapsed"  | |||
|+  | |||
!Floors  | |||
!Usage  | |||
|-  | |||
|'''B3'''  | |||
|Lower Basement  | |||
|-  | |||
|'''B2'''  | |||
|Storage Room  | |||
|-  | |||
|'''B1'''  | |||
|Main Basement  | |||
|-  | |||
|'''1'''  | |||
|Main Entrance  | |||
|-  | |||
|'''2-6'''  | |||
|Patient Rooms  | |||
|-  | |||
|'''M'''  | |||
|Footbridge  | |||
|-  | |||
|'''7-12'''  | |||
|Patient Rooms  | |||
|-  | |||
|'''13'''  | |||
|Mechanical  | |||
|-  | |||
|'''14-16'''  | |||
|Patient Rooms  | |||
|-  | |||
|'''17'''  | |||
|Podium  | |||
|-  | |||
|'''18-28'''  | |||
|Offices  | |||
|-  | |||
|'''R'''  | |||
|Roof  | |||
|}  | |||
=== File 5 ===  | === File 5 ===  | ||
Revision as of 11:59, 4 August 2023
For the planned building with the same name, please go to this page.
Line Hospital V1 is a building complex that was made by elevator1512. There are a total of 8 separate building files and 37 buildings in the complex.
Floors
File 1
Building 1
| Floors | Usage | 
|---|---|
| T3-T1 | Storage Rooms | 
| L2 | Lower Ground Section 2 | 
| M | Maintenance Level | 
| L1 | Lower Ground Section 1 | 
| LG | Ground Floor | 
| UG | Upper Ground Floor | 
| 1-19 | Patient Rooms | 
| 20 | Lower Footbridge | 
| 21-29 | Patient Rooms | 
| 30 | Upper Footbridge | 
| 31-32 | Patient Rooms | 
| 33-34 | Mechanical | 
| R | Rooftop | 
Building 2
| Floors | Usage | 
|---|---|
| SB | Sub-Basement | 
| B | Basement | 
| T3-T1 | Storage Rooms | 
| L2 | Lower Ground Section 2 | 
| M | Maintenance Level | 
| L1 | Lower Ground Section 1 | 
| LG | Ground Floor | 
| UG | Upper Ground Floor | 
| 1-24 | Patient Rooms | 
| 25 | Lower Footbridge | 
| 26-29 | Offices | 
| 30 | Upper Footbridge | 
| 31 | Mechanical | 
| 32 | Rooftop | 
Building 3
| Floors | Usage | 
|---|---|
| SB | Subterranean Basement | 
| B | Basement | 
| T3-T1 | Storage Rooms | 
| L2 | Lower Ground Section 2 | 
| M | Maintenance Level | 
| L1 | Lower Ground Section 1 | 
| LG | Ground Floor | 
| UG | Upper Ground Floor | 
| 1-19 | Patient Rooms | 
| 20 | Lower Footbridge | 
| 21-24 | Patient Rooms | 
| 25 | Upper Footbridge | 
| 26 | Mechanical | 
| 27 | Rooftop | 
Building 4
| Floors | Usage | 
|---|---|
| SB | Subterranean Basement | 
| B | Basement | 
| T3-T1 | Storage Rooms | 
| L2 | Lower Ground Section 2 | 
| M | Maintenance Level | 
| L1 | Lower Ground Section 1 | 
| LG | Ground Floor | 
| UG | Upper Ground Floor | 
| 1-6 | Critical Care Units | 
| 7-19 | Regular Units | 
| 20 | Footbridge | 
| 21-22 | Mechanical | 
| 23 | Rooftop | 
Communications Building (Building 5)
| Floors | Usage | 
|---|---|
| T2-T1 | Storage Rooms | 
| L2 | Generator for Building 1 | 
| M | Tunnel to Buildings 1-4 | 
| L1 | Generator for Buildings 2 and 3 | 
| LG | Communications | 
| UG | Communications | 
| 1-4 | Communications | 
| 5 | Rooftop | 
File 2
Building 6
| Floors | Usage | 
|---|---|
| B3 | Lower Basement | 
| M | Basement Mezzanine | 
| B2 | Middle Basement | 
| B1 | Upper Basement | 
| 1 | Lobby | 
| 1A | Atrium | 
| 2-8 | Patient Rooms | 
| 9 | Mechanical | 
| 10 | Rooftop | 
Building 7
| Floors | Usage | 
|---|---|
| B5 | Generator Room | 
| B4 | Lower Basement | 
| B3 | Mezzanine | 
| M | Basement Mezzanine | 
| B2 | Middle Basement | 
| B1 | Upper Basement | 
| 1 | Lobby | 
| 1A | Atrium | 
| 2-9 | Offices | 
| 10 | Footbridge | 
| 11-12 | Upper Offices | 
| 13 | Mechanical | 
| 14 | Rooftop | 
Building 8
| Floors | Usage | 
|---|---|
| B3-B1 | Underground Crosswalk | 
| 1 | Lobby | 
| 1A | Atrium | 
| 2-9 | Lower Patient Rooms | 
| 10 | Lower Footbridge | 
| 11 | Lower Mechanical | 
| 12-19 | Middle Patient Rooms | 
| 20 | Upper Footbridge | 
| 21-31 | Upper Patient Rooms | 
| 32-33 | Mechanical | 
| H | Heliport Level | 
Building 9
| Floors | Usage | 
|---|---|
| SB | Sub-Basement | 
| SM | Sub-Basement Mezzanine | 
| B4 | Storage Area | 
| B3 | Lower Basement | 
| M | Basement Mezzanine | 
| B2 | Middle Basement | 
| B1 | Upper Basement | 
| 1 | Lobby | 
| 1A | Atrium | 
| 2 | Emergency Room | 
| 3-5 | Extended Stay Patient Rooms | 
| 6-9 | Lower Patient Rooms | 
| 10 | Lower Footbridge | 
| 11-19 | Upper Patient Rooms | 
| 20 | Upper Footbridge | 
| 21-24 | Offices | 
| 25-26 | Mechanical | 
| 27 | Roof | 
Building 10
| Floors | Usage | 
|---|---|
| B3 | Lower Basement | 
| M | Basement Mezzanine | 
| B2 | Middle Basement | 
| B1 | Upper Basement | 
| 1 | Lobby | 
| 1A | Atrium | 
| 2-9 | Lower Patient Rooms | 
| 10 | Lower Footbridge | 
| 11-18 | Upper Patient Rooms | 
| 19 | Mechanical | 
| 20 | Upper Footbridge | 
| 21 | Roof | 
Communications Building (Building 11)
| Floors | Usage | 
|---|---|
| B3 | Lower Basement | 
| M | Basement Mezzanine | 
| B2 | Middle Basement | 
| B1 | Upper Basement | 
| 1 | Exit and Storage | 
| 1A | Storage | 
| 2-3 | Storage | 
| 4 | Rooftop | 
File 3
Building 12
| Floors | Usage | 
|---|---|
| S2-S1 | Sub-Basement Level | 
| B5-B4 | Lower Basement Floor | 
| B3 | Basement Tunnel Section | 
| B2-B1 | Upper Basement Floors | 
| 1 | Main Entrance | 
| 2-4 | Critical Care Patient Rooms | 
| M | Lower Crosswalk | 
| 5-9 | Lower Patient Rooms | 
| 10 | Main Crosswalk | 
| 11 | Lower Mechanical | 
| 12-18 | Upper Patient Rooms | 
| 19 | Upper Mechanical | 
| 20 | Upper Crosswalk | 
| 21-27 | Hospital Offices | 
| H | Heliport Area | 
Building 13
| Floors | Usage | 
|---|---|
| B4 | Tunnel to Building 9 | 
| B3 | Tunnel to Buildings 12 and 13 | 
| B2 | Lower Basement | 
| B1 | Upper Basement | 
| 1 | Main Entrance | 
| 2-4 | Offices | 
| M | Mezzanine Footbridge | 
| 5-6 | Offices | 
| 7 | Roof | 
Building 14
| Floors | Usage | 
|---|---|
| S1 | Lower Subterranean Basement | 
| B5 | Upper Subterranean Basement | 
| B4 | Basement Tunnel | 
| B3 | Lower Basement | 
| B2 | Middle Basement | 
| B1 | Upper Basement | 
| 1 | Main Entrance | 
| 2-4 | Patient Rooms | 
| M | Mezzanine Footbridge | 
| 5 | Mechanical | 
| 6-9 | Patient Rooms | 
| 10 | Main Footbridge | 
| 11-12 | Patient Rooms | 
| 13 | Mechanical | 
| 14 | Roof | 
Building 15
| Floors | Usage | 
|---|---|
| B4 | Storage Level | 
| B3 | Basement Tunnel | 
| B2 | Lower Basement | 
| B1 | Upper Basement | 
| 1 | Main Entrance | 
| 2-4 | Critical Care Patient Rooms | 
| M | Mezzanine Footbridge | 
| 5-8 | Patient Rooms | 
| 9 | Mechanical | 
| 10-19 | Patient Rooms | 
| 20 | Footbridge | 
| 21 | Patient Rooms | 
| 22 | Mechanical | 
| 23 | Roof | 
Communications Building (Building 16)
| Floors | Usage | 
|---|---|
| B3 | Lower Basement | 
| B2 | Middle Basement | 
| B1 | Upper Basement | 
| 1 | Lobby | 
| 2-4 | Storage | 
| M | Storage | 
| 5 | Roof | 
File 4
Building 17
| Floors | Usage | 
|---|---|
| B3 | Lower Lounge | 
| B2 | Storage Room | 
| B1 | Basement Tunnel | 
| 1 | Main Entrance | 
| 2 | Hospital Reception | 
| 3-6 | Lower Patient Rooms | 
| M | Crosswalk | 
| 7-9 | Upper Patient Rooms | 
| 10 | Mechanical | 
| 11 | Roof | 
Building 18
| Floors | Usage | 
|---|---|
| B2 | Storage Room | 
| B1 | Basement Level | 
| 1 | Main Entrance | 
| 2-6 | Offices | 
| M | Lower Crosswalk | 
| 7-12 | Offices | 
| 13 | Mechanical | 
| 14-16 | Executive Offices | 
| 17 | Upper Crosswalk | 
| 18-24 | Patient Rooms | 
| 25 | Roof | 
Building 19
| Floors | Usage | 
|---|---|
| B3 | Lower Basement | 
| B2 | Storage Room | 
| B1 | Main Basement | 
| 1 | Main Entrance | 
| 2-6 | Patient Rooms | 
| M | Footbridge | 
| 7-12 | Patient Rooms | 
| 13 | Mechanical | 
| 14-16 | Patient Rooms | 
| 17 | Podium | 
| 18-28 | Offices | 
| R | Roof | 
File 5
Building 20
- B6 - Lower Subterranean Basement
 - B5 - Lower Basement
 - B4 - Upper Subterranean Basement
 - B3 - Basement Tunnel
 - B2 - Middle Basement
 - B1 - Upper Basement
 - 1 - Main Lobby
 - 2-8 - Patient Rooms
 - 9 - Mechanical
 - 10 - Lower Offices
 - P - Office Podium Level
 - 11-18 - Upper Offices
 - M - Mechanical
 - R - Roof
 
Building 21
- B4 - Subterranean Basement
 - B3 - Basement Tunnel
 - B2 - Lower Basement
 - B1 - Upper Basement
 - 1 - Main Lobby
 - 2-6 - Offices
 - 7 - Mechanical
 - 8-10 - Lower Patient Rooms
 - P - Podium Level
 - 11-13 - Patient Rooms
 - 14 - Mechanical
 - R - Roof
 
File 6
Building 22
- B4-B1 - Basement
 - G - Lobby
 - 1-6 - Patient Rooms
 - 7 - Footbridge
 - 8 - Patient Rooms
 - 9 - Mechanical
 - 10-15 - Patient Rooms
 - 16 - Mechanical
 - 17 - Footbridge
 - 18-26 - Patient Rooms
 - 27 - Footbridge
 - 28 - Patient Rooms
 - 29 - Mechanical
 - 30-36 - Patient Rooms
 - 37 - Roof
 
Building 23
- B7-B1 - Basement
 - G - Ground Floor
 - 1 - Special Care Patient Rooms
 - 2 - Mechanical
 - 3-6 - Special Care Patient Rooms
 - 7 - Footbridge
 - 8-16 - Patient Rooms
 - 17 - Footbridge
 - 18-20 - Patient Rooms
 - 21 - Mechanical
 - 22 - Service?
 - 23-26 - Offices
 - 27 - Footbridge
 - 28-41 - Offices
 - 42 - Mechanical
 - 43-44 - Offices
 - R - Roof
 
Building 24
- B6-B1 - Basement
 - G - Ground Floor
 - 1-6 - Offices
 - 7 - Footbridge
 - 8-16 - Offices
 - 17 - Footbridge
 - 18 - Offices
 - 19 - Mechanical
 - 20 - Roof
 
Building 25
- B2-B1 - Basement
 - G - Ground Floor
 - 1-6 - Offices
 - 7 - Podium
 - 8-13 - Offices
 - 14 - Mechanical
 - 15 - Roof
 
Building 26
- B3-B1 - Basement
 - G - Ground Floor
 - 1-6 - Offices
 - 7 - Footbridge
 - 8-10 - Offices
 - 11 - Mechanical
 - 12-16 - Offices
 - 17 - Footbridge
 - 18 - Roof
 
Building 27
- B7 - Service Basement
 - B6 - Tunnel to Building 24
 - B5-B1 - Basement
 - G - Ground Floor
 - 1-5 - Special Patient Rooms
 - 6 - Mechanical
 - 7 - Footbridge
 - 8 - Special Patient Rooms
 - 9 - Roof
 
Building 28
- B2-B1 - Basement
 - G - Ground Floor
 - 1-3 - Offices
 - 4 - Mechanical
 - 5-6 - Offices
 - 7 - Footbridge
 - 8-16 - Offices
 - 17 - Footbridge
 - 18-24 - Offices
 - 25 - Mechanical
 - 26 - Offices
 - 27 - Footbridge / Roof
 
Building 29 (Service Building)
- 1 (B6) - Tunnel
 - 2-3 (B2-B1) - Basement and Tunnel Connector to Building 28
 - 4 (0) - Ground Floor
 - 5-10 (1-6) - Communications
 - 11 (7) - Footbridge to Building 28
 - 12 (8) - Communications Topside
 
File 7
Building 30
- SB (B7) - Sub-Basement
 - B2-B1 (B6-B5) - Basement Levels
 - 1 (B4) - Lower Level 2
 - 1R (B3) - Tunnel to Other Buildings
 - 2 (B2) - Lower Level 1
 - 2R (B1) - Storage
 - L (0) - Lobby
 - 3 (1) - Mezzanine
 - 4-12 (2-10) - Patient Rooms
 - 14-19 (11-16) - Patient Rooms
 - PH (17) - Penthouse
 - R (18) - Roof
 
Building 31
- SB - Sub-Basement
 - B6-B5 - Storage
 - B4 - Lower Level 2
 - B3 - Tunnel to Other Buildings
 - B2 - Storage
 - B1 - Lower Level 1
 - L - Lobby
 - M - Mezzanine
 - 2-9 - Offices
 - 10 - Mechanical
 - 11 - Roof
 
Building 32
- LL3 - Storage
 - T - Tunnel to Other Buildings
 - LL2-LL1 - Lower Levels
 - 1 (0) - Lobby
 - 2-12 - Offices
 - 14 - Mechanical
 - 15 - Roof
 
Building 33
- LL3 (-6) - Lower Level 3
 - L3M (-5) - Storage
 - LL2 (-4) - Lower Level 2
 - L2M (-3) - Tunnel to Other Buildings
 - LL1 (-2) - Lower Level 1
 - L1M (-1) - Storage
 - 1 (0) - Lobby
 - 1M (1) - Lobby Mezzanine
 - 2 - Lower Patient Rooms
 - 2M (3) - Lower Mezzanine
 - 3 (4) - Middle Patient Rooms
 - 3M (5) - Upper Mezzanine
 - 4 (6) - Upper Patient Rooms
 - 4M (7) - Mechanical
 - 5 (8) - Roof
 
File 8
Building 34
- B8 - Service Basement
 - B7-B6 - Unknown
 - B5 - Lower Tunnel Level
 - B4-B3 - Unknown
 - B2 - Upper Tunnel Level
 - B1 - Mechanical
 - 1 - Lobby
 - M - Mezzanine
 - 2 - Mechanical
 - 3-8 - Patient Rooms
 - 9 - Lower Footbridge
 - 10-20 - Patient Rooms
 - 21 - Upper Footbridge
 - 22-25 - Patient Rooms
 - 26 - Mechanical
 - 27-39 - Patient Rooms
 - R - Roof
 
Building 35
- B8 - Service Basement
 - B7-B6 - Express Zone
 - B5 - Lower Tunnel Level
 - B4-B3 - Unknown
 - B2 - Upper Tunnel Level
 - B1 - Unknown
 - 1 - Lobby
 - M - Mezzanine
 - 2-8 - Offices
 - 9 - Lower Footbridge
 - 10-18 - Offices
 - 19 - Mechanical
 - 20 - Offices
 - 21 - Upper Footbridge
 - 22-24 - Offices
 - R - Roof
 
Building 36
- B8 - Service Basement
 - B7-B6 - Unknown
 - B5 - Lower Tunnel Level
 - B4 - Mechanical
 - B3 - Unknown
 - B2 - Upper Tunnel Level
 - B1 - Mechanical
 - 1 - Lobby
 - M - Mezzanine
 - 2 - Mechanical
 - 3-8 - Offices
 - 9 - Lower Footbridge
 - 10 - Mechanical
 - 11-14 - Offices
 - R - Roof
 
Building 37
- B8 - Service Basement
 - B7-B4 - Express Zone
 - B3 - Mechanical
 - B2 - Upper Tunnel Level
 - B1 - Unknown
 - 1 - Lobby
 - M - Mezzanine
 - 2-8 - Patient Rooms
 - 9 - Lower Footbridge
 - 10-13 - Patient Rooms
 - 14 - Mechanical
 - 15-20 - Patient Rooms
 - 21 - Upper Footbridge
 - R - Roof