Line Hospital File 2: Difference between revisions
Jump to navigation
Jump to search
Elevator1512 (talk | contribs) (Created page with "'''Line Hospital File 2''' is the second of eight files in the Line Hospital complex. There are a total of 6 buildings in this file. == Floors == === Building 6 === {| class="wikitable mw-collapsible mw-collapsed" |+ !Floors !Usage |- |'''B3''' |Lower Basement |- |'''M''' |Basement Mezzanine |- |'''B2''' |Middle Basement |- |'''B1''' |Upper Basement |- |'''1''' |Lobby |- |'''1A''' |Atrium |- |'''2-8''' |Patient Rooms |- |'''9''' |Mechanical |- |'''...") |
Elevator1512 (talk | contribs) |
||
Line 250: | Line 250: | ||
|Rooftop | |Rooftop | ||
|} | |} | ||
{| class="wikitable" | |||
|+ Line Hospital Complex | |||
|- | |||
| [[Line Hospital File 1|File 1]] || [[Line Hospital File 2|File 2]] || [[Line Hospital File 3|File 3]] || [[Line Hospital File 4|File 4]] || [[Line Hospital File 5|File 5]] || [[Line Hospital File 6|File 6]] || [[Line Hospital File 7|File 7]] || [[Line Hospital File 8|File 8]] | |||
|} | |||
[[Category:Elevator1512's buildings]] | [[Category:Elevator1512's buildings]] |
Revision as of 07:42, 11 September 2023
Line Hospital File 2 is the second of eight files in the Line Hospital complex. There are a total of 6 buildings in this file.
Floors
Building 6
Floors | Usage |
---|---|
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2-8 | Patient Rooms |
9 | Mechanical |
10 | Rooftop |
Building 7
Floors | Usage |
---|---|
B5 | Generator Room |
B4 | Lower Basement |
B3 | Mezzanine |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2-9 | Offices |
10 | Footbridge |
11-12 | Upper Offices |
13 | Mechanical |
14 | Rooftop |
Building 8
Floors | Usage |
---|---|
B3-B1 | Underground Crosswalk |
1 | Lobby |
1A | Atrium |
2-9 | Lower Patient Rooms |
10 | Lower Footbridge |
11 | Lower Mechanical |
12-19 | Middle Patient Rooms |
20 | Upper Footbridge |
21-31 | Upper Patient Rooms |
32-33 | Mechanical |
H | Heliport Level |
Building 9
Floors | Usage |
---|---|
SB | Sub-Basement |
SM | Sub-Basement Mezzanine |
B4 | Storage Area |
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2 | Emergency Room |
3-5 | Extended Stay Patient Rooms |
6-9 | Lower Patient Rooms |
10 | Lower Footbridge |
11-19 | Upper Patient Rooms |
20 | Upper Footbridge |
21-24 | Offices |
25-26 | Mechanical |
27 | Roof |
Building 10
Floors | Usage |
---|---|
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2-9 | Lower Patient Rooms |
10 | Lower Footbridge |
11-18 | Upper Patient Rooms |
19 | Mechanical |
20 | Upper Footbridge |
21 | Roof |
Communications Building (Building 11)
Floors | Usage |
---|---|
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Exit and Storage |
1A | Storage |
2-3 | Storage |
4 | Rooftop |
File 1 | File 2 | File 3 | File 4 | File 5 | File 6 | File 7 | File 8 |