Line Hospital File 3: Difference between revisions
Jump to navigation
Jump to search
Elevator1512 (talk | contribs) (Created page with "'''Line Hospital File 3''' is the third of eight files in the Line Hospital complex. There are a total of 5 buildings in this file. == Floors == === Building 12 === {| class="wikitable mw-collapsible mw-collapsed" |+ !Floors !Usage |- |'''S2-S1''' |Sub-Basement Level |- |'''B5-B4''' |Lower Basement Floor |- |'''B3''' |Basement Tunnel Section |- |'''B2-B1''' |Upper Basement Floors |- |'''1''' |Main Entrance |- |'''2-4''' |Critical Care Patient Rooms...") |
Elevator1512 (talk | contribs) |
||
Line 211: | Line 211: | ||
|Roof | |Roof | ||
|} | |} | ||
{| class="wikitable" | |||
|+ Line Hospital Complex | |||
|- | |||
| [[Line Hospital File 1|File 1]] || [[Line Hospital File 2|File 2]] || [[Line Hospital File 3|File 3]] || [[Line Hospital File 4|File 4]] || [[Line Hospital File 5|File 5]] || [[Line Hospital File 6|File 6]] || [[Line Hospital File 7|File 7]] || [[Line Hospital File 8|File 8]] | |||
|} | |||
[[Category:Elevator1512's buildings]] | [[Category:Elevator1512's buildings]] |
Revision as of 07:42, 11 September 2023
Line Hospital File 3 is the third of eight files in the Line Hospital complex. There are a total of 5 buildings in this file.
Floors
Building 12
Floors | Usage |
---|---|
S2-S1 | Sub-Basement Level |
B5-B4 | Lower Basement Floor |
B3 | Basement Tunnel Section |
B2-B1 | Upper Basement Floors |
1 | Main Entrance |
2-4 | Critical Care Patient Rooms |
M | Lower Crosswalk |
5-9 | Lower Patient Rooms |
10 | Main Crosswalk |
11 | Lower Mechanical |
12-18 | Upper Patient Rooms |
19 | Upper Mechanical |
20 | Upper Crosswalk |
21-27 | Hospital Offices |
H | Heliport Area |
Building 13
Floors | Usage |
---|---|
B4 | Tunnel to Building 9 |
B3 | Tunnel to Buildings 12 and 13 |
B2 | Lower Basement |
B1 | Upper Basement |
1 | Main Entrance |
2-4 | Offices |
M | Mezzanine Footbridge |
5-6 | Offices |
7 | Roof |
Building 14
Floors | Usage |
---|---|
S1 | Lower Subterranean Basement |
B5 | Upper Subterranean Basement |
B4 | Basement Tunnel |
B3 | Lower Basement |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Main Entrance |
2-4 | Patient Rooms |
M | Mezzanine Footbridge |
5 | Mechanical |
6-9 | Patient Rooms |
10 | Main Footbridge |
11-12 | Patient Rooms |
13 | Mechanical |
14 | Roof |
Building 15
Floors | Usage |
---|---|
B4 | Storage Level |
B3 | Basement Tunnel |
B2 | Lower Basement |
B1 | Upper Basement |
1 | Main Entrance |
2-4 | Critical Care Patient Rooms |
M | Mezzanine Footbridge |
5-8 | Patient Rooms |
9 | Mechanical |
10-19 | Patient Rooms |
20 | Footbridge |
21 | Patient Rooms |
22 | Mechanical |
23 | Roof |
Communications Building (Building 16)
Floors | Usage |
---|---|
B3 | Lower Basement |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
2-4 | Storage |
M | Storage |
5 | Roof |
File 1 | File 2 | File 3 | File 4 | File 5 | File 6 | File 7 | File 8 |