Aceheart Mall: Difference between revisions
Jump to navigation
Jump to search
MelvinMan10 (talk | contribs) m →Current floor assignments: - The 1st floor will be shifted closer to the street later. You can't clearly see from your eyes at this moment. |
MelvinMan10 (talk | contribs) m *Removed Trivia */ |
||
Line 23: | Line 23: | ||
*[[Beautiful Lotus Tower]] | *[[Beautiful Lotus Tower]] | ||
*[[Amanda Plaza]] | *[[Amanda Plaza]] | ||
==External links== | ==External links== | ||
*[https://www.youtube.com/watch?v=C_RbgKJ-qP0 Aceheart Mall elevator tour by Elevator1512] (9 March 2024) | *[https://www.youtube.com/watch?v=C_RbgKJ-qP0 Aceheart Mall elevator tour by Elevator1512] (9 March 2024) |
Revision as of 13:44, 2 March 2025
Aceheart Mall is a mall with an office tower in Tranquility City. This entire complex was built by Mn10.
Current floor assignments
Mall & office tower
- B2 - Parking
- B1 - Underground shops
- LL - Office service area
- 1-5 - Shops (Office lobby on the 1st floor)
- 6-23 - Offices
- 24 - Mechanical
- R - Office tower roof
North Parking Garage
- B2-B1 - Underground parking
- LL - Underground parking
- 1-4A - Parking (Exit to street on the 1st floor)
South Parking Garage
- LL - Underground parking
- 1-5 - Parking (Exit to street on the 1st floor)
See also
External links
- Aceheart Mall elevator tour by Elevator1512 (9 March 2024)
Mn10's buildings |
---|