The Lift Excelsior Portfolio: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
Line 26: Line 26:
* [[Transnational Hotel Breezelight Beach]] (since Build 4)
* [[Transnational Hotel Breezelight Beach]] (since Build 4)
* Zara in Mabel City (since Build 4)
* Zara in Mabel City (since Build 4)
* The Galway City Classic Lift Trail (since Build 4)
* [[The Galway City Classic Lift Trail]] (since Build 4 and 5)
* [[Intuition Road]] (since Build 4.5)
* [[Intuition Road]] (since Build 4.5)
* Jameson Court Apartments (since Build 5)


=== Planned Buildings ===
=== Planned Buildings ===
Line 36: Line 37:
* Bloomsden
* Bloomsden
* Coalham Town Centre 2026 Remaster (a modern-era take of [[Coalham High Street]])
* Coalham Town Centre 2026 Remaster (a modern-era take of [[Coalham High Street]])
* [[The Galway City Classic Lift Trail]]
* Jameson Court Apartments
* Trafford Centre
* Trafford Centre



Revision as of 14:17, 3 September 2026

Integration Project Info*
Elevator1512's Buildings *
38
tag
Escalatorgeek881's Buildings *
21
tag
Mn10's Buildings *
9
tag
M72's Buildings *
111
tag
Sumosoftinc's Buildings *
45
tag
EGR1312's Buildings *
42
tag
SS Showcase's Buildings *
18
tag
Haru's Buildings *
5
tag
Elevator1209's Buildings *
6
tag
LF's Buildings *
28
tag
HappyPizza64's Buildings *
14
tag
joao84704's Buildings *
29
tag
g-Elevators' Buildings *
1
tag
Lift Excelsior's Buildings *
15
tag
Current Integration Projects *
19
tag
Add this template *
This article is legitimate.
It contains good-faith information, such as an existing building or content.

The Lift Excelsior Portfolio is an integration project by The Lift Excelsior. Its main building is Trafford Centre that is based on a real-life shopping center. NewBuild, which was released as part of Build 3, is a text-based creator available as part of this IP.

Versions

  • Build 1 - 16/04/2025 (No longer available)
  • Build 2 - 30/01/2026
    • Build 2.1 - 02/02/2026
    • Build 2.2 - 08/02/2026
  • Build 3 - 20/03/2026
    • Build 3.1 - 22/03/2026
    • Build 3.2 - 31/03/2026
  • Build 4 - 04/06/2026
    • Build 4.1 - 05/06/2026
  • Build 4.5 - 23/07/2026
    • Build 4.6 - 26/07/2026

Buildings

Current Buildings

This list shows buildings currently available to download.

Planned Buildings

This list shows planned buildings that will be worked on in no particular order.

See also