Sandy Spire: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
No edit summary
m (V2 was released in the update that released V4)
Line 1: Line 1:
'''Sandy Spire''' is a skyscraper built by Skyscraper Simulator Showcase (June). This building's current version that is in progress has Eastinghouse elevators with Dover Impulse fixtures. There are also some large freight elevators and ThyssenKrupp Synergy MRL elevators being installed. It also has 4 versions:
'''Sandy Spire''' is a skyscraper built by Skyscraper Simulator Showcase (June). This building's current version that is in progress has Eastinghouse elevators with Dover Impulse fixtures. There are also some large freight elevators and ThyssenKrupp Synergy MRL elevators being installed. It also has 4 versions:
# V1 made in [[BBC]] (its probably lost media).
# V1 made in [[BBC]] (its probably lost media).
# V2 being hand-coded with 90 floors and a 300 foot length base. It is unknown whether this version still exists or not.
# V2 being hand-coded with 90 floors and a 300 foot length base.  
# V3 being hand-coded with 110 floors and a 400 foot length base.
# V3 being hand-coded with 110 floors and a 400 foot length base.
# V4 being hand-coded with 112 floors and a 660 floor length base.
# V4 being hand-coded with 112 floors and a 660 floor length base.

Revision as of 22:38, 2 December 2023

Sandy Spire is a skyscraper built by Skyscraper Simulator Showcase (June). This building's current version that is in progress has Eastinghouse elevators with Dover Impulse fixtures. There are also some large freight elevators and ThyssenKrupp Synergy MRL elevators being installed. It also has 4 versions:

  1. V1 made in BBC (its probably lost media).
  2. V2 being hand-coded with 90 floors and a 300 foot length base.
  3. V3 being hand-coded with 110 floors and a 400 foot length base.
  4. V4 being hand-coded with 112 floors and a 660 floor length base.

Floors (V3)

  • B - Basement
  • L - Lobby
  • GH - Great Hall
  • EH - Event Hall
  • 3-42 - Hotel Rooms
  • 43 - Mechanical
  • PL - Pool Level
  • 45 - 105 - Hotel Rooms
  • 106 - 107 - Commons
  • 108 - 110 - Topside Mechanical
  • RF - Roof

Floors (V4)

  • SB-B - Underground service levels
  • L - Lobby, access to pool and street
  • GH - Great Hall
  • EH - Event Hall
  • 2-14 - Parking
  • BR - Pool, Bridge to The Palace Tower, Event zone
  • OL - Event level, Security
  • 17-53 - Lower hotel
  • 54 - Middle service
  • 55 - Pool level
  • 56-105 - Upper hotel
  • 106 - Administration
  • 107 - Restaurant
  • 108-110 - Upper service and communications

See also