Spacetime Plaza Screenshots: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
MelvinMan10 (talk | contribs)
MelvinMan10 (talk | contribs)
mNo edit summary
Line 3: Line 3:
==Overview==
==Overview==
<gallery>
<gallery>
STP_Exterior_NE.jpg|Looking at the main shopping areas from the northeast, with the tall buildings seen in background (7 August 2026)
STP_Exterior_NE.jpg|Looking at the main shopping areas from the northeast, with the tall buildings seen in background (6 September 2026)
STP_Exterior_SW.jpg|Looking from the southwest, with the Lavender Moon Hotel and Miriam Tower visible (7 August 2026)
STP_Exterior_SW.jpg|Looking from the southwest, with the Lavender Moon Hotel and Miriam Tower visible (6 September 2026)
</gallery>
</gallery>


Line 31: Line 31:
STP_ADS_B2F_2.jpg|Outside the lobby area on level B2 (19 June 2026)
STP_ADS_B2F_2.jpg|Outside the lobby area on level B2 (19 June 2026)
STP_ADS_B1F_1.jpg|Level B1 elevator lobby, with the escalators seen in background (19 June 2026)
STP_ADS_B1F_1.jpg|Level B1 elevator lobby, with the escalators seen in background (19 June 2026)
STP_April_Tower_1FLobby_1.jpg|April Tower lobby area on the 1<sup>st</sup> floor (6 September 2026)
STP_April_Tower_1FLobby_2.jpg|Another look at April Tower's lobby (2) (6 September 2026)
STP_April_Tower_Elev_1.jpg|April Tower's elevators on the 3<sup>rd</sup> floor (6 May 2026)
STP_April_Tower_Elev_1.jpg|April Tower's elevators on the 3<sup>rd</sup> floor (6 May 2026)
STP_April_Tower_Elev_2.jpg|Inside one of April Tower's elevators (6 May 2026)
STP_April_Tower_Elev_2.jpg|Inside one of April Tower's elevators (6 May 2026)
STP_ADS_1F_StoreArea.jpg|1<sup>st</sup> floor store area (6 September 2026)
STP_ADS_3F_StoreArea.jpg|3<sup>rd</sup> floor store area (6 September 2026)
</gallery>
</gallery>


Line 46: Line 50:


==Lumina Parking Garage and Lavender Moon Hotel==
==Lumina Parking Garage and Lavender Moon Hotel==
'''''Note from Mn10:''' Screenshots will come later. Please give me a few days or weeks to test the new additions first.''
<gallery>
<gallery>
STP_LuminaPG_Elev1.jpg|Parking elevators on the 1<sup>st</sup> floor (6 September 2026)
STP_LuminaPG_Elev1.jpg|Parking elevators on the 1<sup>st</sup> floor (6 September 2026)

Revision as of 10:52, 6 September 2026

Building information
Note: This place is still under development, so the final product may change greatly from these pictures.

Overview

Main mall

April Dept. Store and Tower

Miriam Tower

Lumina Parking Garage and Lavender Moon Hotel

Underground parking garage