Centerville Main Hospital: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:


This building will be built probably today (on 23/02/2024) or maybe other day. It will be made with [[BBC]]. (Sorry it will be hand-coded because the building creator takes ages to load)
This building will be built probably today (on 23/02/2024) or maybe other day. It will be made with [[BBC]]. (Sorry it will be hand-coded because the building creator takes ages to load)
Elevators: 2 freight elevators and 3 passenger elevators.
== Floors ==
== Floors ==
* '''B1''' - Underground Clinics
* '''B1''' - Underground Clinics

Revision as of 12:02, 23 February 2024

The Centerville Main Hospital is a planned hospital in Centerville by Lighthouse Friesland. There will be 4 vintage elevators with manual doors and a 90s Otis elevator. The exterior will look like the ones in Himmelstor Hospital. Also, the 90s Otis elevator will serve only the ground floor and the upper floors.

This building will be built probably today (on 23/02/2024) or maybe other day. It will be made with BBC. (Sorry it will be hand-coded because the building creator takes ages to load)

Elevators: 2 freight elevators and 3 passenger elevators.

Floors

  • B1 - Underground Clinics
  • G - Ground Floor
  • 1-7 - Hospital Levels

See also