EG881 Integration Project: Difference between revisions
Jump to navigation
Jump to search
Elevator1512 (talk | contribs) mNo edit summary |
Elevator1512 (talk | contribs) mNo edit summary |
||
Line 1: | Line 1: | ||
{{legit}} | |||
The '''EG881 Integration Project''' is an [[Integration Projects|integration project]] founded by escalatorgeek881. It is the first integration project as it allowed multiple buildings and their related data to be released at the same time, and more integration projects soon followed such as the [[Mn10 Integration Project]] and [[M72 Integration Project]]. It also introduced [[Escalator2011]] which allows users to create realistic-looking escalators. | The '''EG881 Integration Project''' is an [[Integration Projects|integration project]] founded by escalatorgeek881. It is the first integration project as it allowed multiple buildings and their related data to be released at the same time, and more integration projects soon followed such as the [[Mn10 Integration Project]] and [[M72 Integration Project]]. It also introduced [[Escalator2011]] which allows users to create realistic-looking escalators. | ||
== Versions == | == Versions == |
Revision as of 21:45, 10 March 2024
It contains good-faith information, such as an existing building or content. |
The EG881 Integration Project is an integration project founded by escalatorgeek881. It is the first integration project as it allowed multiple buildings and their related data to be released at the same time, and more integration projects soon followed such as the Mn10 Integration Project and M72 Integration Project. It also introduced Escalator2011 which allows users to create realistic-looking escalators.
Versions
EG881 Integration Project 2011
- Version 1.0 (04/04/2011)
- Version 1.5 (05/01/2011)
- Version 2.0 (06/05/2011)
- Version 2.5 (07/30/2011)
- Version 3.0 (09/25/2011)
EG881 Integration Project 2012
- Build 1 (02/06/2012)
- Build 2 (02/12/2012)
- Build 3 (03/12/2012)
- Build 4 (06/03/2012)
- Build 5 (09/22/2012)
- Build 6 (12/25/2012)
EG881 Integration Project 2013 / 2014
Integration Project 2013
- Build 1 (01/14/2013)
- Build 2 (05/26/2013)
- Build 3 (10/19/2013)
Integration Project 2014
- Build 1 (01/11/2014)
- Build 2 (01/29/2014)
- Build 3 (03/09/2014)
EG881 Integration Project (After 2014)
- Build 1 (03/19/2015)
- Build 2 (07/20/2015)
- Build 3 (08/25/2015)
- Build 4 (12/20/2015)
- Build 5 (12/25/2015)
- Build 6 (03/29/2016)
- Build 7 (05/01/2016)
- Build 8 (07/17/2016)
- Build 9 (12/19/2016)
- Build 10 (01/16/2017)
- Build 11 (10/01/2018)
- Build 12 (06/04/2023)
- Build 13 (07/30/2023)
- Build 14 (09/17/2023)
- Build 15 (11/05/2023)
- Build 16 (03/02/2024)
Current buildings
- Dellerton Plaza (V2)
- Eternity Plaza (V2)
- EG881 Ranch House
- Terrace V3
- Terrace Border V2
- Triton Center III (V2)
- Sky I (V2)
- Northeast Triad Convention Center (NTCC)
- Stratford Business Complex
- Coniferous Tower
- Denton Plaza
- Grove Building
- Lint Plaza
- Shillander Financial Center
- Doolittle Meridian Center (New Building next to Doolittle St. Garage)
Planned buildings
There are currently no planned buildings.
Past buildings
- Read more: Escalatorgeek881's Buildings