Sandy Spire: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
No edit summary
mNo edit summary
Line 1: Line 1:
{{legit}}
{{legit}}{{IpInfo/S3}}
'''Sandy Spire''' is a skyscraper built by Skyscraper Simulator Showcase (June). This building's most recent version has Eastinghouse elevators with Dover Impulse fixtures, as well as some large freight elevators and ThyssenKrupp Synergy MRL elevators. It also has 4 versions:
'''Sandy Spire''' is a skyscraper built by Skyscraper Simulator Showcase (June). This building's most recent version has Eastinghouse elevators with Dover Impulse fixtures, as well as some large freight elevators and ThyssenKrupp Synergy MRL elevators. It also has 4 versions:
# V1 made in [[BBC]] (its probably lost media).
# V1 made in [[BBC]] (its probably lost media).

Revision as of 18:33, 10 May 2024

This article is legitimate.
It contains good-faith information, such as an existing building or content.
This article describes a building that is part of the Extreme MEGAProjects by Skyscraper Simulator Showcase.

It can be found here on the Skyscraper Simulator Forum.

Sandy Spire is a skyscraper built by Skyscraper Simulator Showcase (June). This building's most recent version has Eastinghouse elevators with Dover Impulse fixtures, as well as some large freight elevators and ThyssenKrupp Synergy MRL elevators. It also has 4 versions:

  1. V1 made in BBC (its probably lost media).
  2. V2 being hand-coded with 90 floors and a 300 foot length base.
  3. V3 being hand-coded with 110 floors and a 400 foot length base.
  4. V4 being hand-coded with 112 floors and a 660 floor length base.

Floors (V3)

  • B - Basement
  • L - Lobby
  • GH - Great Hall
  • EH - Event Hall
  • 3-42 - Hotel Rooms
  • 43 - Mechanical
  • PL - Pool Level
  • 45 - 105 - Hotel Rooms
  • 106 - 107 - Commons
  • 108 - 110 - Topside Mechanical
  • RF - Roof

Floors (V4)

  • SB-B - Underground service levels
  • L - Lobby, access to pool and street
  • GH - Great Hall
  • EH - Event Hall
  • 2-14 - Parking
  • BR - Pool, Bridge to The Palace Tower, Event zone
  • OL - Event level, Security
  • 17-53 - Lower hotel
  • 54 - Middle service
  • 55 - Pool level
  • 56-105 - Upper hotel
  • 106 - Administration
  • 107 - Restaurant
  • 108-110 - Upper service and communications

See also