The Piles Centre: Difference between revisions
No edit summary |
No edit summary |
||
Line 11: | Line 11: | ||
|2 | |2 | ||
|5 | |5 | ||
| | |4 | ||
|0 | |0 | ||
|0 | |0 |
Revision as of 11:32, 15 April 2024
This article may need to be updated as more stuff comes. |
The Piles Centre (German: Das Pfählen-Center) is an incomplete shopping centre and office (mixed-use) building in Skyscraperville by Lighthouse Friesland. It is LF's second building with realistic textures and sounds and has a total of over 5 elevators.
The Piles Centre
| |
---|---|
Plans
There will be plans by LF for realistic elevator textures and sounds coming from two of my videos.
Current Plan: I've already created the service elevator lobby No 1. Now I will create the freight elevator (Set II). Then I will release the building.
History
This building was built in 1959 as an office building without name. There was only 3 elevators, one passenger elevator and one freight elevator in 1 Makarina Street and one passenger elevator in 3 Makarina Street. In Floors 1-3, there was just offices and no shopping center in this location. Since 1991 there is a shopping centre here and both office building and shopping centre got a name, The Piles Centre. At that time the elevator in 3 Makarina Street and the offices in floors 1-3 were removed, but both elevators in 1 Makarina Street were modded by Haushahn. In 2014, H&M opened and decided to install one glass elevator there. That time also TK Maxx opened it's doors, and also TK Maxx installed an elevator. Also that time most of the old passenger elevators were modded by Lutz.
Floors
NOTE: The floors are a German floor numbering, except the buttons. The buttons have UK floor numbering.
Shopping Mall
- U2 - Storage Room (Currently nothing)
- U1 - Basement Level (Currently nothing)
- E - Ground Level and Exit
- 1 - First Floor
- 2 - Second Floor
- 3 - Third Floor
TK Maxx
- U2 - Storage Room
- U1 - Express Zone
- E - Ground Level and Exit
- 1 - Upper Level
H&M
- U2 - Storage Room
- U1 - Basement Level
- E - Ground Level and Exit
- 1 - Upper Level
Office Building
- U2 - Storage Room (Currently nothing)
- U1 - Storage Room (Currently nothing)
- E - Ground Level and Exit
- 1-3 - Express Zone
- 4-12 - Offices (Currently nothing)