Talk:The Piles Centre: Difference between revisions

From Skyscraper Wiki
Latest comment: 29 June by Lighthouse Friesland in topic Issues
Jump to navigation Jump to search
(→‎Issues: Reply)
Line 39: Line 39:


:Yes, I will fix the issues in Build 6 [[User:Lighthouse Friesland|Lighthouse Friesland]] ([[User talk:Lighthouse Friesland|talk]]) 12:22, 9 June 2024 (CDT)
:Yes, I will fix the issues in Build 6 [[User:Lighthouse Friesland|Lighthouse Friesland]] ([[User talk:Lighthouse Friesland|talk]]) 12:22, 9 June 2024 (CDT)
:@[[User:Joao84704|Joao84704]], What do you mean with "Some walls overlap each other"? [[User:Lighthouse Friesland|Lighthouse Friesland]] ([[User talk:Lighthouse Friesland|talk]]) 12:54, 29 June 2024 (CDT)


== Updates for Phase III ==
== Updates for Phase III ==

Revision as of 11:54, 29 June 2024

Missing Font

I am missing the dot-matrix-indicator-2.ttf font from the Fonts folder for this building. Let me know if you can provide a download link for just that file @Lighthouse Friesland. Elevator1512 (talk) 22:17, 1 May 2024 (CDT)Reply[reply]

I think I forgot to put that in the .zip file Lighthouse Friesland (talk) 07:03, 2 May 2024 (CDT)Reply[reply]
I forgot to put that again in the .zip file. I will reply you tommorow, bye bye...! Lighthouse Friesland (talk) 15:01, 2 May 2024 (CDT)Reply[reply]
Missing font has been added to the .zip file. Redownload the latest release. Lighthouse Friesland (talk) 08:35, 3 May 2024 (CDT)Reply[reply]
Got it, thanks! Elevator1512 (talk) 20:56, 4 May 2024 (CDT)Reply[reply]

Updates for Phase II

The current version (not yet public available) has a total of 11 elevators.

Updates on The Piles Centre:

- Added inspection box on top of the elevators
- Added lift sign above the main lift door
- Added two freight elevators
- Added some shops (Fielmann, Sostrene Grene, McDonalds, Lidl, Skyscraperville Post Office)
- Improved freight elevators 3 to 4 (elevators 8 to 9)
- Added call buttons for elevators 8 to 9
- Changed version to Phase II
Lighthouse Friesland (talk) 03:50, 20 May 2024 (CDT)Reply[reply]

I will add the lift machinery in Phase III. Lighthouse Friesland (talk) 11:32, 20 May 2024 (CDT)Reply[reply]

Issues

There are some issues with the walls. Some are Z-Fightings and there are others

also there are some spots that the walls are very weird


could change the textures and add windows >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> (fix this)

and the outer walls of elevator shafts dont really connect

some walls overlap each other too Joao84704 (talk) 12:21, 9 June 2024 (CDT)Reply[reply]

Yes, I will fix the issues in Build 6 Lighthouse Friesland (talk) 12:22, 9 June 2024 (CDT)Reply[reply]
@Joao84704, What do you mean with "Some walls overlap each other"? Lighthouse Friesland (talk) 12:54, 29 June 2024 (CDT)Reply[reply]

Updates for Phase III

- Adding elevator machinery
- Bug fixes
- More shops
- Adding a single stairwell for the mall Lighthouse Friesland (talk) 12:27, 9 June 2024 (CDT)Reply[reply]