Burgundy Crimson Hotel: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
Tag: Manual revert
Line 10: Line 10:
|-
|-
|'''GL (1)'''
|'''GL (1)'''
|Ground lobby (cafés and shops)
|Ground lobby<abbr title="Cafés and shops">*</abbr>
|-
|-
|'''ML (2)'''
|'''ML (2)'''
Line 33: Line 33:
|Roof
|Roof
|}
|}
===Rosewood Building===
===Rosewood Building===
{| class="wikitable mw-collapsible mw-collapsed"
{| class="wikitable mw-collapsible mw-collapsed"

Revision as of 08:47, 24 July 2024

This article is legitimate.
It contains good-faith information, such as an existing building or content.
This article describes a building that is currently being worked on as part of the Mn10 Integration Project by Mn10.

It can be found here on the Skyscraper Simulator Forum.

Burgundy Crimson Hotel is a hotel that was created by Mn10 in mid 2023.

Floors

Burgundy Building

Floors Allocation
GL (1) Ground lobby*
ML (2) Main lobby
3 Shops, relaxing area, etc.
4 Common rooms, garden
5-17 Hotel rooms
18 Restaurant
19 Mechanical
R Roof

Rosewood Building

Floors Allocation
LL Lower level (open plan shops)
1 Lobby
2-10 Hotel rooms
11 Mechanical
R Roof

Parking Garage

Note: The parking garage's elevators serve only floors ending with "A" and the buttons are simply labeled as B, 1, 2, etc.

Floors Allocation
BA-BB Basement parking
1A-6A Parking
6B-7A Roof parking

See also