EG881 Integration Project: Difference between revisions
MelvinMan10 (talk | contribs) m (Removed info directly copied from the old Wiki.) |
Elevator1512 (talk | contribs) No edit summary |
||
Line 62: | Line 62: | ||
== Past buildings == | == Past buildings == | ||
* ''Read more: [[Buildings/Creators A-H#escalatorgeek881's Buildings|Escalatorgeek881's Buildings]]'' | * ''Read more: [[Buildings/Creators A-H#escalatorgeek881's Buildings|Escalatorgeek881's Buildings]]'' | ||
== External links == | |||
* [https://skyscrapersimulatorforum.createaforum.com/integration-projects/eg881-integration-project/ EG881 Integration Project - The Skyscraper Simulator Forum] | |||
[[Category:Integration Projects]] | [[Category:Integration Projects]] | ||
[[Category:EG881's buildings|*]] | [[Category:EG881's buildings|*]] |
Latest revision as of 21:39, 14 October 2024
Integration Project Info* | ||
---|---|---|
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
tag | ||
It contains good-faith information, such as an existing building or content. |
The EG881 Integration Project is an integration project founded by escalatorgeek881. It is the first integration project as it allowed multiple buildings and their related data to be released at the same time, and more integration projects soon followed such as the Mn10 Integration Project and M72 Integration Project. It also introduced Escalator2011 which allows users to create realistic-looking escalators, and In-Code Basic Stairwell Creator to create stairwells in seconds. This project was one of the forum's most popular topics until it was left untouched in late 2018. Later in May 2023, EG881 returned to the new forum and posted some progress on various buildings, such as NTCC, SBC, and Dellerton Plaza.
Versions[edit | edit source]
EG881 Integration Project 2011[edit | edit source]
- Version 1.0 (04/04/2011)
- Version 1.5 (05/01/2011)
- Version 2.0 (06/05/2011)
- Version 2.5 (07/30/2011)
- Version 3.0 (09/25/2011)
EG881 Integration Project 2012[edit | edit source]
- Build 1 (02/06/2012)
- Build 2 (02/12/2012)
- Build 3 (03/12/2012)
- Build 4 (06/03/2012)
- Build 5 (09/22/2012)
- Build 6 (12/25/2012)
EG881 Integration Project 2013 / 2014[edit | edit source]
Integration Project 2013[edit | edit source]
- Build 1 (01/14/2013)
- Build 2 (05/26/2013)
- Build 3 (10/19/2013)
Integration Project 2014[edit | edit source]
- Build 1 (01/11/2014)
- Build 2 (01/29/2014)
- Build 3 (03/09/2014)
EG881 Integration Project (After 2014)[edit | edit source]
- Build 1 (03/19/2015)
- Build 2 (07/20/2015)
- Build 3 (08/25/2015)
- Build 4 (12/20/2015)
- Build 5 (12/25/2015)
- Build 6 (03/29/2016)
- Build 7 (05/01/2016)
- Build 8 (07/17/2016)
- Build 9 (12/19/2016)
- Build 10 (01/16/2017)
- Build 11 (10/01/2018)
- Build 12 (06/04/2023)
- Build 13 (07/30/2023)
- Build 14 (09/17/2023)
- Build 15 (11/05/2023)
- Build 16 (03/02/2024)
Current buildings[edit | edit source]
- Dellerton Plaza (V2)
- Eternity Plaza (V2)
- EG881 Ranch House
- Terrace V3
- Terrace Border V2
- Triton Center III (V2)
- Sky I (V2)
- Northeast Triad Convention Center (NTCC)
- Stratford Business Complex
- Coniferous Tower
- Denton Plaza
- Grove Building
- Lint Plaza
- Shillander Financial Center
- Doolittle Meridian Center (New Building next to Doolittle St. Garage)
Planned buildings[edit | edit source]
There are currently no planned buildings.
Past buildings[edit | edit source]
- Read more: Escalatorgeek881's Buildings