Line Tower: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
Line 56: Line 56:
* '''LPH-MPH''' - Zone 4 Mechanical
* '''LPH-MPH''' - Zone 4 Mechanical
* '''UPH''' - Main Roof / Mechanical Penthouse
* '''UPH''' - Main Roof / Mechanical Penthouse
* '''PR''' - Elevator Machinery (mechanical for service/freight elevators)
* '''PR''' - <abbr title="Mechanical for Service/Freight elevators">Elevator Machinery</abbr>
* '''RF''' - Rooftop
* '''RF''' - Rooftop



Revision as of 23:02, 8 January 2025

This article is legitimate.
It contains good-faith information, such as an existing building or content.
This article describes a building that is currently part of the E1512 Integration Project by elevator1512.

It can be found here on the Skyscraper Simulator Forum.

This page (or section) is for a future building.

This article may need to be updated as more stuff comes.
The completed building may look different from the current information.

The Line Tower is a 183-floor multi-use tower located in downtown Dellis City and is will be made by Elevator1512. Most of the elevators have been added to the building. There will be observation decks on floors 175 and 176, and a restaurant also will be built on the 174th floor. There will be a total of 104 elevators in the tower. It is planned to be about 2,007 feet tall. The majority of the elevators will have either KSS 570 or KSS D40 USA fixtures.

Floors

This plan is still a work in progress and subject to frequent changes.

  • Floors in Bold italic are not yet finalized.

Zone B

  • SB2-SB - Zone B Mechanical
  • B3-B1 - Underground Storage
  • P9-P1 - Parking

Zone 1

  • LL3 - Service Level
  • LL2 - Motor Lobby
  • LL1 - Lower Lobby
  • LL1M - Lower Lobby Mezzanine
  • L - Lobby and Street Level
  • L2-L3 - Lobby Mezzanine
  • M - Mezzanine, Meeting Rooms
  • M2-M3 - Upper Mezzanine, Meeting Rooms
  • 1-9 - Meeting Rooms
  • 10-48 - Offices, Zone 1
  • 49-49M - Zone 1 Mechanical

Zone 2

  • 50 - Zone 2 Office Skylobby
  • 50M - Skylobby Mezzanine
  • 51-98 - Offices, Zone 2
  • 99-99M - Zone 2 Mechanical

Zone 3

  • 100 - Hotel Skylobby
  • 100M - Skylobby Mezzanine
  • 100U - Hotel Service Level
  • 101-132 - Hotel Rooms
  • 132M - Hotel / Residential Service Level
  • 133 - Residential Skylobby
  • 133M - Skylobby Mezzanine
  • 133U - Residential Service Level
  • 134-148 - Residences, Zone 1
  • 149-149M - Zone 3 Mechanical

Zone 4A

  • 150-167 - Residences, Zone 2
  • 168-172 - Penthouses
  • 172M - Upper Service Level

Zone 4B

  • 173 - Restaurant Kitchen
  • 174 - Line Restaurant
  • 174M - Restaurant Mezzanine
  • 175 - Observation Deck Lower Level
  • 175M - Observation Deck Mezzanine
  • 176 - Observation Deck Upper Level
  • 177-180 - Communications

Zone R

  • LPH-MPH - Zone 4 Mechanical
  • UPH - Main Roof / Mechanical Penthouse
  • PR - Elevator Machinery
  • RF - Rooftop

See also