Line Tower: Difference between revisions
Elevator1512 (talk | contribs) |
Elevator1512 (talk | contribs) m (→Parking Garage) |
||
Line 60: | Line 60: | ||
* '''RF''' - Rooftop | * '''RF''' - Rooftop | ||
=== Parking Garage === | === Parking Garage === | ||
''Note: There may be multiple parking towers on either side of the main tower in separate BLD files.'' | ''Note: There may be multiple parking towers on either side of the main tower in separate BLD files. The floorplan below shows the tallest planned garage.'' | ||
* '''1''' - Lobby, Parking | * '''1''' - Lobby, Parking | ||
* '''2-24''' - Parking | * '''2-24''' - Parking |
Revision as of 22:18, 15 January 2025
It contains good-faith information, such as an existing building or content. |
This article describes a building that is currently part of the E1512 Integration Project by elevator1512. It can be found here on the Skyscraper Simulator Forum. |
---|
|
The Line Tower is a 183-floor multi-use tower located in downtown Dellis City and is will be made by Elevator1512. Most of the elevators have been added to the building. There will be observation decks on floors 175 and 176, and a restaurant also will be built on the 174th floor. There will be a total of 104 elevators in the tower. It is planned to be about 2,007 feet tall. The majority of the elevators will have KSS 570 fixtures, while the parking garage will have KSS D40 USA fixtures.
Floors
This plan is still a work in progress and subject to frequent changes.
Main Tower
Zone B
- SB2-SB - Zone B Mechanical
- B3-B1 - Underground Storage
- P9-P1 - Parking
Zone 1
- LL3 - Service Level
- LL2 - Motor Lobby
- LL2M - Service Mezzanine (not yet confirmed)
- LL1 - Lower Lobby
- LL1M - Lower Lobby Mezzanine
- L - Lobby and Street Level
- L2-L3 - Lobby Mezzanine
- M - Mezzanine, Meeting Rooms
- M2-M3 - Upper Mezzanine, Meeting Rooms
- 1-9 - Meeting Rooms
- 10-48 - Offices, Zone 1
- 49-49M - Zone 1 Mechanical
Zone 2
- 50 - Zone 2 Office Skylobby
- 50M - Skylobby Mezzanine
- 51-98 - Offices, Zone 2
- 99-99M - Zone 2 Mechanical
Zone 3
- 100 - Hotel Skylobby
- 100M - Skylobby Mezzanine
- 100U - Hotel Service Level
- 101-132 - Hotel Rooms
- 132M - Hotel / Residential Service Level
- 133 - Residential Skylobby
- 133M - Skylobby Mezzanine
- 133U - Residential Service Level
- 134-148 - Residences, Zone 1
- 149-149M - Zone 3 Mechanical
Zone 4A
- 150-167 - Residences, Zone 2
- 168-172 - Penthouses
- 172M - Upper Service Level
Zone 4B
- 173 - Restaurant Kitchen
- 174 - Line Restaurant
- 174M - Restaurant Mezzanine
- 175 - Observation Deck Lower Level
- 175M - Observation Deck Mezzanine
- 176 - Observation Deck Upper Level
- 177-180 - Communications
Zone R
- LPH-MPH - Zone 4 Mechanical
- UPH - Main Roof / Mechanical Penthouse
- PR - Elevator Machinery
- RF - Rooftop
Parking Garage
Note: There may be multiple parking towers on either side of the main tower in separate BLD files. The floorplan below shows the tallest planned garage.
- 1 - Lobby, Parking
- 2-24 - Parking
- 25 - Rooftop Parking