LF Integration Project: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
mNo edit summary
Line 4: Line 4:
In Build 5, I introduced [[RealisticTopBox2024]], a script where users allow to create inspection boxes easier.
In Build 5, I introduced [[RealisticTopBox2024]], a script where users allow to create inspection boxes easier.


A new build is coming every 3-4 weeks, sometimes a few days or more than 3-4 weeks.<br>
A new build (before Build 6) was coming every 3-4 weeks, sometimes a few days or more than 3-4 weeks.<br>
The upcoming Build 6 will probably be released the next 4-6 weeks.
The upcoming Build 6 will be released either today or tomorrow.
== Versions ==
== Versions ==
{{IpStatus}}
{{IpStatus}}
Line 13: Line 13:
* <span style="color:red;">'''Build 4'''</span> - [https://www.mediafire.com/file/jhwi1yn0yfxvfm1/Lighthouse_Friesland_Integration_Project_Build_4.zip/file 30/03/2024] (Support ended on 14/04/2024)
* <span style="color:red;">'''Build 4'''</span> - [https://www.mediafire.com/file/jhwi1yn0yfxvfm1/Lighthouse_Friesland_Integration_Project_Build_4.zip/file 30/03/2024] (Support ended on 14/04/2024)
* <span style="color:red;">'''Build 4.5'''</span> - [https://www.mediafire.com/file/3dpg9n5gd8oyr6f/Lighthouse_Friesland_Integration_Project_Build_4.5.zip/file 14/04/2024] (Support ended on 11/06/2024)
* <span style="color:red;">'''Build 4.5'''</span> - [https://www.mediafire.com/file/3dpg9n5gd8oyr6f/Lighthouse_Friesland_Integration_Project_Build_4.5.zip/file 14/04/2024] (Support ended on 11/06/2024)
* <span style="color:green;">'''Build 5'''</span> - [https://www.mediafire.com/file/h2f3a25d9h0b6a8/Lighthouse_Friesland_Integration_Project_Build_5.zip/file 11/06/2024]
* <span style="color:yellow;">'''Build 5'''</span> - [https://www.mediafire.com/file/h2f3a25d9h0b6a8/Lighthouse_Friesland_Integration_Project_Build_5.zip/file 11/06/2024]
* '''Build 6''' - TBA


== History ==
== History ==
Line 79: Line 80:


=== Since Upcoming Build 6 ===
=== Since Upcoming Build 6 ===
* [[The Piles Centre|{{Font Colour|The Piles Centre|yellow}}]] Phase III
* [[The Piles Centre|{{Font Colour|The Piles Centre|green}}]] Phase III
* [[Grape Residences|{{Font Colour|Grape Residences|yellow}}]] Phase I
* [[Grape Residences|{{Font Colour|Grape Residences|green}}]] Phase I
* [[B&B Hotel Central Berlin|{{Font Colour|B&B Hotel Central Berlin|darkred}}]]
* [[B&B Hotel Central Berlin|{{Font Colour|B&B Hotel Central Berlin|darkred}}]]
* [[Kollhoff-Tower]] (Simplified)
* [[Kollhoff-Tower|{{Font Colour|Kollhoff-Tower|green}}]] (Simplified)
* [[Skyscraperville High Street|{{Font Colour|Skyscraperville High Street|yellow}}]] Phase II (Market Subway Station and Thalia bookstore)
* [[Skyscraperville High Street|{{Font Colour|Skyscraperville High Street|green}}]] Phase II (Market Subway Station and Thalia bookstore)
* [[Lighthouse Cruise Center|{{Font Colour|Lighthouse Cruise Center|yellow}}]]
* [[Lighthouse Cruise Center|{{Font Colour|Lighthouse Cruise Center|green}}]] Phase I


=== Since Upcoming Build 7 ===
=== Since Upcoming Build 7 ===

Revision as of 13:04, 15 July 2025

Integration Project Info*
Elevator1512's Buildings *
38
tag
Escalatorgeek881's Buildings *
21
tag
Mn10's Buildings *
9
tag
M72's Buildings *
111
tag
Sumosoftinc's Buildings *
45
tag
EGR1312's Buildings *
42
tag
SS Showcase's Buildings *
18
tag
Haru's Buildings *
5
tag
Elevator1209's Buildings *
6
tag
LF's Buildings *
28
tag
HappyPizza64's Buildings *
14
tag
joao84704's Buildings *
29
tag
Lift Excelsior's Buildings *
4
tag
Current Integration Projects *
19
tag
Add this template *
This article is legitimate.
It contains good-faith information, such as an existing building or content.

The LF Integration Project is an integration project by Lighthouse Friesland. It's main building project is The Piles Centre. Newer buildings such as Centerville Main Hospital and some other buildings were added later.

In Build 5, I introduced RealisticTopBox2024, a script where users allow to create inspection boxes easier.

A new build (before Build 6) was coming every 3-4 weeks, sometimes a few days or more than 3-4 weeks.
The upcoming Build 6 will be released either today or tomorrow.

Versions

Legend

  • Red: Build is no longer supported
  • Yellow: Build will end support soon
  • Green: Supported

History

  • Before October 2023, all buildings were released in My skyscrapersim buildings on Scratch.
  • Since October 2023 and before this IP, all buildings were released in LF Data Pack. Due to the cost of downloading folders on MediaFire, I've abandoned my data pack and released this IP.
  • In April 2024, the RealisticTopBox2024 script was created to allow people adding an inspection box on top of the elevators easily. It was released 2 months later.

Buildings

Legend

- Red: Not started / Planned

- Dark Red: Cancelled

- Yellow: In progress (1x) / Completed (2x)

- Blue: Released, but still in progress

- Green: Released and completed

- Purple: Replaced

- Orange: Released, but is discontinued

Since Build 1

Since Build 2

Since Build 3

Since Build 4

Since Build 4.5

Since Build 5

Since Upcoming Build 6

Since Upcoming Build 7

External links

See also