The Lift Excelsior Portfolio: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
m New hotfix build
mNo edit summary
Line 5: Line 5:
* '''Build 2''' - 30/01/2026
* '''Build 2''' - 30/01/2026
** '''Build 2.1''' - 02/02/2026
** '''Build 2.1''' - 02/02/2026
* '''Build 3''' - 20/03/2026


== Buildings ==
== Buildings ==
* [[Athlone Town Centre]] (since Build 1)
* [[Athlone Town Centre]] (since Build 1)
* [[Example Plaza]] (since Build 1)
* [[Example Plaza]] (since Build 1)
* [[Point Square Dublin]]
* [[Point Square Dublin]] (since Build 3)
* [[The Spaceport Triology]]
* [[The Spaceport Triology]]
* [[Blanchardstown Centre]] (since Build 2)
* [[Blanchardstown Centre]] (since Build 2)

Revision as of 12:47, 20 March 2026

Integration Project Info*
Elevator1512's Buildings *
38
tag
Escalatorgeek881's Buildings *
21
tag
Mn10's Buildings *
9
tag
M72's Buildings *
111
tag
Sumosoftinc's Buildings *
45
tag
EGR1312's Buildings *
42
tag
SS Showcase's Buildings *
18
tag
Haru's Buildings *
5
tag
Elevator1209's Buildings *
6
tag
LF's Buildings *
28
tag
HappyPizza64's Buildings *
14
tag
joao84704's Buildings *
29
tag
Lift Excelsior's Buildings *
4
tag
Current Integration Projects *
19
tag
Add this template *
This article is legitimate.
It contains good-faith information, such as an existing building or content.

The Lift Excelsior Portfolio is an integration project by The Lift Excelsior. Its main building is Blanchardstown Centre that is based on a real-life shopping center.

Versions

  • Build 1 - 16/04/2025 (No longer available)
  • Build 2 - 30/01/2026
    • Build 2.1 - 02/02/2026
  • Build 3 - 20/03/2026

Buildings

See also