Spacetime Plaza: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
MelvinMan10 (talk | contribs)
MelvinMan10 (talk | contribs)
Line 47: Line 47:
<gallery>
<gallery>
STP_Exterior_SE.jpg|A recent photo of this complex (3 May 2026)
STP_Exterior_SE.jpg|A recent photo of this complex (3 May 2026)
STP_Main_Glass_Elev.jpg|A glass elevator in the center of the main mall (6 May 2026)
STP_April_Tower_Elev_1.jpg|April Tower elevators on the 3<sup>rd</sup> floor (6 May 2026)
STP_April_Tower_Elev_2.jpg|Inside one of April Tower's elevators. (6 May 2026)
</gallery>
</gallery>



Revision as of 14:34, 5 May 2026

Spacetime Plaza is a mixed-use complex in Tranquility City.

Current floor assignments

Main mall (Main engine)

  • B2-B1 - Parking
  • 1-7 - Shops (Exit to street on the 1st floor)
  • 8 - Upper shops (Spanning only some zones)
  • 9-10 - Parking garage access

Monica Dept. Store (Sub-engine 1)

  • B2-B1 - Parking
  • 1-6 - Sales area (Exit to street on the 1st floor)
  • 7-8 - Shops (Part of the main mall area)
  • 9 - Roof

April Dept. Store and Tower (Sub-engine 2)

  • B2-B1 - Parking
  • 1-7 - Sales area (Exit to street on the 1st floor)
  • 8 - Event area
  • 9-16 - Additional shops, offices, etc.
  • 17-18 - Pamela Space Bar
  • 19 - Mechanical
  • 20 - Roof

Parking garage and Lavender Moon Hotel (Sub-engine 3)

The parking levels are currently a WIP, but the hotel levels have not been started yet.

  • B2-B1 - Underground parking
  • 1 - Hotel entrance
  • 2-10* - Parking
  • 11-12 - Mechanical
  • 13 - Hotel lobby
  • 14 - Miriam Restaurant
  • 15-29 - Hotel rooms
  • 30 - Good Friday Restaurant
  • 31 - Mechanical
  • 32 - Roof

Accounting Tower (Sub-engine 4)

This will be the only building in this complex with three basements.

  • B3-B1 - Parking
  • 1-2 - Shops (Office lobby on the 1st floor)
  • 3-20 - Offices
  • 21 - Mechanical
  • 22 - Roof

Gallery

Trivia

  • This complex was in Mn10's idea around April-May 2017, but it was delayed for nine years due to a lot of details needed, such as:
    • The connected underground parking areas on levels B2 and B1.
    • The transition area between the mall and parking garage on the 4th and 6th floors.
  • This is the only place in Tranquility City to use the following fixtures:
    • Kone KDS 290/300: Currently used by 15 elevators in the main mall.
    • Otis ZEN: Used by all 11 elevators in April Department Store and Tower.
Tranquility City
Modern buildings (2023-2026)
2026 Spacetime Plaza
2024-2025 BLCSentai TowerDestiny PlazaBNMClarity Building
2023 GHHRabbit TowerBCHNMHBLTAceheartAmanda
Historic buildings (2015-2021)
2020-2021 DRTHDenver Remston HospitalMillennia PlazaEMC
2018 Marketing SquareWorld Management CenterSDU
2015-2016 SMTWestin Tranquility CityTQCCSerenity Hospital
See also: Mn10 Integration Project