Spacetime Plaza: Difference between revisions
Jump to navigation
Jump to search
MelvinMan10 (talk | contribs) m →Gallery |
MelvinMan10 (talk | contribs) m →Accounting Tower (Sub-engine 4): - The number of floors is subject to change. |
||
| Line 40: | Line 40: | ||
*'''B3-B1''' - <span style="color:green;">Parking</span> | *'''B3-B1''' - <span style="color:green;">Parking</span> | ||
*'''1-2''' - <span style="color:green;">Shops</span> <span style="color:blue;">(Office lobby on the 1<sup>st</sup> floor)</span> | *'''1-2''' - <span style="color:green;">Shops</span> <span style="color:blue;">(Office lobby on the 1<sup>st</sup> floor)</span> | ||
*'''3- | *'''3-??''' - Offices | ||
*''' | *'''??''' - Mechanical | ||
*''' | *'''??''' - Roof | ||
==Gallery== | ==Gallery== | ||
Revision as of 02:18, 6 May 2026
Spacetime Plaza is a mixed-use complex in Tranquility City.
Current floor assignments
Main mall (Main engine)
- B2-B1 - Parking
- 1-7 - Shops (Exit to street on the 1st floor)
- 8 - Upper shops (Spanning only some zones)
- 9-10 - Parking garage access
Monica Dept. Store (Sub-engine 1)
- B2-B1 - Parking
- 1-6 - Sales area (Exit to street on the 1st floor)
- 7-8 - Shops (Part of the main mall area)
- 9 - Roof
April Dept. Store and Tower (Sub-engine 2)
- B2-B1 - Parking
- 1-7 - Sales area (Exit to street on the 1st floor)
- 8 - Event area
- 9-16 - Additional shops, offices, etc.
- 17-18 - Pamela Space Bar
- 19 - Mechanical
- 20 - Roof
Parking garage and Lavender Moon Hotel (Sub-engine 3)
The parking levels are currently a WIP, but the hotel levels have not been started yet.
- B2-B1 - Underground parking
- 1 - Hotel entrance
- 2-10* - Parking
- 11-12 - Mechanical
- 13 - Hotel lobby
- 14 - Miriam Restaurant
- 15-29 - Hotel rooms
- 30 - Good Friday Restaurant
- 31 - Mechanical
- 32 - Roof
Accounting Tower (Sub-engine 4)
This will be the only building in this complex with three basements.
- B3-B1 - Parking
- 1-2 - Shops (Office lobby on the 1st floor)
- 3-?? - Offices
- ?? - Mechanical
- ?? - Roof
Gallery
-
A recent photo of this complex (3 May 2026)
-
A glass elevator in the center of the main mall (6 May 2026)
-
Parking elevator lobby (6 May 2026)
-
Inside one of the parking elevators (6 May 2026)
-
April Tower elevators on the 3rd floor (6 May 2026)
-
Inside one of April Tower's elevators. (6 May 2026)
Trivia
- This complex was in Mn10's idea around April-May 2017, but it was delayed for nine years due to a lot of details needed, such as:
- The connected underground parking areas on levels B2 and B1.
- The transition area between the mall and parking garage on the 4th and 6th floors.
- This is the only place in Tranquility City to use the following fixtures:
- Kone KDS 290/300: Currently used by 15 elevators in the main mall.
- Otis ZEN: Used by all 11 elevators in April Department Store and Tower.
| Tranquility City | |
|---|---|
| Modern buildings (2023-2026) | |
| 2026 | Spacetime Plaza |
| 2024-2025 | BLC • Sentai Tower • Destiny Plaza • BNM • Clarity Building |
| 2023 | GHH • Rabbit Tower • BCH • NMH • BLT • Aceheart • Amanda |
| Historic buildings (2015-2021) | |
| 2020-2021 | DRTH • Denver Remston Hospital • Millennia Plaza • EMC |
| 2018 | Marketing Square • World Management Center • SDU |
| 2015-2016 | SMT • Westin Tranquility City • TQCC • Serenity Hospital |