Sunny Bay Tower: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
MelvinMan10 (talk | contribs)
m Are you the real Haru? (Undid revision 22021 by 2001:4479:CE03:D300:85DA:CD53:7C15:7C02 (talk))
Tag: Undo
MelvinMan10 (talk | contribs)
m Gallery: - Correcting the plural form ("lobbys" > "lobbies")
 
Line 46: Line 46:
SBT Exterior.jpg|Exterior of the New Sunny Bay Tower (209 floors)
SBT Exterior.jpg|Exterior of the New Sunny Bay Tower (209 floors)
SBT Lobby.jpg|Sunny Bay Tower Lobby
SBT Lobby.jpg|Sunny Bay Tower Lobby
SBT - Local Elevator Lobby.jpg|One of the local elevator lobbys
SBT - Local Elevator Lobby.jpg|One of the local elevator lobbies
SBT - Local Elevator Interior.jpg|Interior of one of the local elevators
SBT - Local Elevator Interior.jpg|Interior of one of the local elevators
SBT - Floor 45 Skylobby.jpg|45th floor skylobby
SBT - Floor 45 Skylobby.jpg|45th floor skylobby

Latest revision as of 09:43, 2 June 2026

This article is legitimate.
It contains good-faith information, such as an existing building or content.
This page (or section) is for a future building.

This article may need to be updated as more stuff comes.
The completed building may look different from the current information.

This article describes a building that is currently part of Haru's Integration Project by Haru.

It can be found here on the Skyscraper Simulator Forum.

Old Sunny Bay Tower (106 floors)

Sunny Bay Tower is a 209-floor skyscraper that has a total of 67 Mitsubishi elevators. It is currently being created by Haru, and was first introduced in February 2023. It was originally planned to only have 106 floors, and was extended later to the current 209 floors tower.

NOTE: Only the first 90 floors and the first 67 elevators are completed, not including the Staff Basement (SB) level.

Floors[edit | edit source]

Zone 1[edit | edit source]

  • SB - Service Basement
  • P9-P1 - Parking
  • LL - Lower Level
  • L - Ground Lobby
  • M - Mezzanine
  • 2-42 - Zone 1 Offices
  • 43-44 - Zone 1 Mechanical

Zone 2[edit | edit source]

Old Floor Assignments
  • 45 - Zone 2 Office Skylobby
  • 46-87 - Zone 2 Offices
  • 88-89 - Zone 2 Mechanical

Zone 3[edit | edit source]

  • 90 - Hotel Skylobby
  • 91-125 - Hotel Rooms
  • 126 - Hotel Bar Level
  • 127-128 - Zone 3 Mechanical

Zone 4[edit | edit source]

  • 129 - Residential Skylobby
  • 130-161 - Residences
  • 162-163 - Zone 4 Mechanical

Zone 5A[edit | edit source]

  • 164 - Executive Residential Skylobby
  • 165 - Executive Restaurant
  • 166-189 - Executive Residences
  • 190-191 - Zone 5A Mechanical

Zone 5B[edit | edit source]

  • 192-198 - Ballrooms
  • 199 - Skydeck Restaurant
  • 200 - Grand Sunny Bay Skydeck
  • 201-207 - Communications
  • 208-209 - Zone 5B Mechanical
  • R - Roof

Gallery[edit | edit source]

See also[edit | edit source]