Pyramid Park Delta City: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
No edit summary
Line 4: Line 4:
''The floor plans below have not yet been finalized. There might be a midpoint amenity taking up floors 34-35, with most elevators stopping at one or both of those floors.''
''The floor plans below have not yet been finalized. There might be a midpoint amenity taking up floors 34-35, with most elevators stopping at one or both of those floors.''
* '''SB''' - Sub-Basement
* '''SB''' - Sub-Basement
* '''B''' - Lower Level
* '''B''' - Basement
* '''1''' - Main Lobby
* '''L''' - Main Lobby
* '''2''' - Upper Lobby
* '''M''' - Mezzanine / Management
* '''M''' - Mezzanine / Management
* '''3-33''' - Offices (no 13th floor)
* '''UL''' - Upper Mezzanine / Maintenance
* '''34-35''' - Midway Interchange and Special Offices
* '''2-34''' - Offices (no 13th floor)
* '''36''' - Lower Mechanical
* '''35-36''' - Midway Interchange and Special Offices
* '''36M''' - Lower Mechanical Mezzanine
* '''37''' - Lower Mechanical
* '''37-66''' - Offices
* '''37M''' - Lower Mechanical Mezzanine
* '''38-66''' - Offices
* '''67-71''' - Executive Offices
* '''67-71''' - Executive Offices
* '''72''' - Upper Mechanical
* '''72''' - Upper Mechanical

Revision as of 22:37, 8 June 2026

This article is legitimate.
It contains good-faith information, such as an existing building or content.
This article describes a building that is currently part of the E1512 Integration Project by elevator1512.

It can be found here on the Skyscraper Simulator Forum.

This page (or section) is for a future building.

This article may need to be updated as more stuff comes.
The completed building may look different from the current information.

Pyramid Park Delta City is a planned office tower to be located in Delta City and currently being built by elevator1512. It is currently the main building project for the E1512 Integration Project.

Floors

The floor plans below have not yet been finalized. There might be a midpoint amenity taking up floors 34-35, with most elevators stopping at one or both of those floors.

  • SB - Sub-Basement
  • B - Basement
  • L - Main Lobby
  • M - Mezzanine / Management
  • UL - Upper Mezzanine / Maintenance
  • 2-34 - Offices (no 13th floor)
  • 35-36 - Midway Interchange and Special Offices
  • 37 - Lower Mechanical
  • 37M - Lower Mechanical Mezzanine
  • 38-66 - Offices
  • 67-71 - Executive Offices
  • 72 - Upper Mechanical
  • 72M - Upper Mechanical Mezzanine
  • R - Roof