Spacetime Plaza Screenshots: Difference between revisions
Jump to navigation
Jump to search
MelvinMan10 (talk | contribs) |
MelvinMan10 (talk | contribs) |
||
| Line 36: | Line 36: | ||
</gallery> | </gallery> | ||
== | ==Lumina Parking Garage and Lavender Moon Hotel== | ||
<gallery> | |||
STP_LMH_1F_PKElev1.jpg|Parking elevators on the 1<sup>st</sup> floor (23 June 2026) | |||
STP_LMH_1F_PKElev2.jpg|Looking closer to a parking elevator (23 June 2026) | |||
STP_LMH_PKElev1.jpg|Inside one of the parking elevators (23 June 2026) | |||
STP_LMH_PKElev2.jpg|Riding a parking elevator to the 7<sup>th</sup> floor (23 June 2026) | |||
</gallery> | |||
==Underground parking garage== | ==Underground parking garage== | ||
Revision as of 06:01, 23 June 2026
Overview
-
Looking at the main shopping areas from the northeast, with the tall buildings seen in background (11 June 2026)
-
Looking from the southwest, with the Lavender Moon Hotel and Accounting Tower visible (11 June 2026)
Main mall
-
The main mall's center atrium with the glass elevators (13 May 2026)
-
A glass elevator at the center of the main mall (6 May 2026)
-
Parking elevator lobby on the 6th floor (6 May 2026)
-
Inside one of the parking elevators (10 June 2026)
-
Parking elevator lobby on the 10th floor (10 June 2026)
-
One of the elevators at the mall's east side (13 May 2026)
-
Another bank of elevators with different floor indicators (13 May 2026)
April Dept. Store and Tower
-
Lobby area on level B2, with the elevators and escalators visible (19 June 2026)
-
Outside the lobby area on level B2 (19 June 2026)
-
Level B1 elevator lobby, with the escalators seen in background (19 June 2026)
-
April Tower's elevators on the 3rd floor (6 May 2026)
-
Inside one of April Tower's elevators (6 May 2026)
Accounting Tower
-
Lobby area on the 1st floor (11 June 2026)
-
One of the office floors (1 June 2026)
-
An office local elevator (1 June 2026)
-
Another office elevator with a different interior (5 June 2026)
-
Looking at the parking elevators (4 June 2026)
-
Inside one of the parking elevators (5 June 2026)
Lumina Parking Garage and Lavender Moon Hotel
-
Parking elevators on the 1st floor (23 June 2026)
-
Looking closer to a parking elevator (23 June 2026)
-
Inside one of the parking elevators (23 June 2026)
-
Riding a parking elevator to the 7th floor (23 June 2026)
Underground parking garage
-
A ramp connecting the southeastern side of levels B1 and B2 (1 June 2026)
-
A ramp connecting the northeastern side of levels B1 and B2 (1 June 2026)
-
Northeastern end of the parking garage on level B1, underneath the Monica Dept. Store (10 June 2026)
-
Another look at the northeastern end of level B1 (10 June 2026)
-
Northeastern end of level B2, with both elevator lobbies of Monica Dept. Store completed (10 June 2026)