Spacetime Plaza Screenshots/2: Difference between revisions
Jump to navigation
Jump to search
MelvinMan10 (talk | contribs) |
MelvinMan10 (talk | contribs) |
||
| Line 39: | Line 39: | ||
STP_Mall_WestEscLby_3.jpg|West escalator lobby (5 August 2026) | STP_Mall_WestEscLby_3.jpg|West escalator lobby (5 August 2026) | ||
</gallery> | </gallery> | ||
<center>[[Spacetime Plaza Screenshots|Page 1]], [[Spacetime Plaza Screenshots/2|Page 2]]</center> | |||
[[Category:Screenshots]] | [[Category:Screenshots]] | ||
[[Category:Spacetime Plaza Screenshots|*]] | [[Category:Spacetime Plaza Screenshots|*]] | ||
Revision as of 01:53, 19 September 2026
Note: This place is still under development, so the final product may change greatly from these pictures.
Miriam Tower
-
Lobby area on the 1st floor (11 June 2026)
-
An office local elevator (23 June 2026)
-
Another office elevator with a different interior (5 June 2026)
-
One of the office floors (20 August 2026)
-
Looking at the parking elevators (4 June 2026)
-
Inside one of the parking elevators (5 June 2026)
Lumina Parking Garage and Lavender Moon Hotel
-
Parking elevators on the 1st floor (6 September 2026)
-
Looking closer to a parking elevator (5 September 2026)
-
Inside one of the parking elevators (6 September 2026)
-
Riding a parking elevator upstairs (5 September 2026)
-
A hotel local elevator (19 September 2026)
-
Another hotel elevator with a different design (19 September 2026)
-
Underground loading dock between the hotel and Monica Dept. Store (7 August 2026)
-
Another look at the underground loading dock (7 August 2026)
-
Parking entrance on level B1 (7 August 2026)
-
A service hallway on a hotel level (6 September 2026)
-
Inside one of the Tower Service Elevators (6 September 2026)
-
Inside the Podium Service Elevator (6 September 2026)
Underground parking garage
-
Ramps connecting the southeastern side of levels B1 and B2 (3 August 2026)
-
Ramps connecting the northeastern side of levels B1 and B2 (3 August 2026)
-
Northeastern end of the parking garage on level B1, underneath the Monica Dept. Store (10 June 2026)
-
Another look at the northeastern end of level B1 (10 June 2026)
-
Northeastern end of level B2, with both elevator lobbies of Monica Dept. Store completed (10 June 2026)
-
East escalator lobby (1) (5 August 2026)
-
East escalator lobby (2) (5 August 2026)
-
West escalator lobby (5 August 2026)