Berlin TV Tower: Difference between revisions
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
* '''Version 2 (October 25, 2023)''': Bug fixes (except the staff lift), changed button fixtures, cab texture and floor / indicator numbering (except the staff lift) | * '''Version 2 (October 25, 2023)''': Bug fixes (except the staff lift), changed button fixtures, cab texture and floor / indicator numbering (except the staff lift) | ||
* '''Version 3 (October 29, 2023)''': Bug fixes for the staff lift, changed floor and indicator numbering for the staff lift, corrected the roof to exact 1207 ft, changed the antenna/roof texture | * '''Version 3 (October 29, 2023)''': Bug fixes for the staff lift, changed floor and indicator numbering for the staff lift, corrected the roof to exact 1207 ft, changed the antenna/roof texture | ||
* '''Version | * '''Version 4A (November 16, 2023)''': Changed shaft door texture for all lifts, changed carpet texture and exterior wall texture in the lift lobby, changed floor texture for the public lifts (idk how the cab looks like in the service lift) | ||
* '''Version | * '''Version 4B (February 21, 2024)''': Bug fixes | ||
==Floors== | ==Floors== |
Revision as of 11:52, 21 February 2024
Berlin TV Tower is a TV Tower created by Lighthouse Friesland. It is based on a TV Tower located in Berlin (Germany) and it's near Park Inn Hotel.
I'm working on the upcoming version 5. Don't beg for releases until I finished with the update.
Updates
- Version 1A (September 22, 2022): First launch
- Version 1B (September 2, 2023): Changed elevator ceiling texture (except the staff lift)
- Version 2 (October 25, 2023): Bug fixes (except the staff lift), changed button fixtures, cab texture and floor / indicator numbering (except the staff lift)
- Version 3 (October 29, 2023): Bug fixes for the staff lift, changed floor and indicator numbering for the staff lift, corrected the roof to exact 1207 ft, changed the antenna/roof texture
- Version 4A (November 16, 2023): Changed shaft door texture for all lifts, changed carpet texture and exterior wall texture in the lift lobby, changed floor texture for the public lifts (idk how the cab looks like in the service lift)
- Version 4B (February 21, 2024): Bug fixes
Floors
- 1-2 - Staff Area
- 3 - Lobby
- 4 - Elevator Lobby
- 5-20 - Mechanical
- 21 - Observatory
- 21M - Mechanical
- 22 - Restaurant
- 24-30 - Mechanical
Gallery
- NOTE: Some of the screenshots were made in Version 3.
-
Exterior of the Berlin TV Tower
-
Berlin TV Tower Antenna (looking from the air)
-
Observatory