EG881 Integration Project: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
Line 66: Line 66:


== Planned buildings ==
== Planned buildings ==
There are currently no planned buildings.
* Coniferous Tower
* Denton Plaza
* Grove Building
* Lint Plaza
* Shillander Financial Center


== Past buildings ==
== Past buildings ==

Revision as of 12:57, 2 March 2024

The EG881 Integration Project is an integration project founded by escalatorgeek881. It is the first integration project as it allowed multiple buildings and their related data to be released at the same time, and more integration projects soon followed such as the Mn10 Integration Project and M72 Integration Project.

Versions

EG881 Integration Project 2011

  • Version 1.0 (04/04/2011)
  • Version 1.5 (05/01/2011)
  • Version 2.0 (06/05/2011)
  • Version 2.5 (07/30/2011)
  • Version 3.0 (09/25/2011)

EG881 Integration Project 2012

  • Build 1 (02/06/2012)
  • Build 2 (02/12/2012)
  • Build 3 (03/12/2012)
  • Build 4 (06/03/2012)
  • Build 5 (09/22/2012)
  • Build 6 (12/25/2012)

EG881 Integration Project 2013 / 2014

Integration Project 2013

  • Build 1 (01/14/2013)
  • Build 2 (05/26/2013)
  • Build 3 (10/19/2013)

Integration Project 2014

  • Build 1 (01/11/2014)
  • Build 2 (01/29/2014)
  • Build 3 (03/09/2014)

EG881 Integration Project (After 2014)

  • Build 1 (03/19/2015)
  • Build 2 (07/20/2015)
  • Build 3 (08/25/2015)
  • Build 4 (12/20/2015)
  • Build 5 (12/25/2015)
  • Build 6 (03/29/2016)
  • Build 7 (05/01/2016)
  • Build 8 (07/17/2016)
  • Build 9 (12/19/2016)
  • Build 10 (01/16/2017)
  • Build 11 (10/01/2018)
  • Build 12 (06/04/2023)
  • Build 13 (07/30/2023)
  • Build 14 (09/17/2023)
  • Build 15 (11/05/2023)
  • Build 16 (03/02/2024)

Current buildings

Planned buildings

  • Coniferous Tower
  • Denton Plaza
  • Grove Building
  • Lint Plaza
  • Shillander Financial Center

Past buildings