Berlin TV Tower: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
Elevator1512 (talk | contribs) mNo edit summary |
||
Line 1: | Line 1: | ||
{{Legit}} | {{Legit}} | ||
'''Berlin TV Tower''' is a TV Tower created by Lighthouse Friesland. It is based off of a TV Tower located at Alexanderplatz in Berlin (Germany) and it's near [[ | '''Berlin TV Tower''' is a TV Tower created by Lighthouse Friesland. It is based off of a TV Tower located at Alexanderplatz in Berlin (Germany) and it's near [[Park Inn Hotel]]. | ||
==Updates== | == Updates == | ||
* '''Version 1A (September 22, 2022)''': First launch | * '''Version 1A (September 22, 2022)''': First launch | ||
* '''Version 1B (September 2, 2023)''': Changed elevator ceiling texture (except the staff lift) | * '''Version 1B (September 2, 2023)''': Changed elevator ceiling texture (except the staff lift) | ||
* '''Version 2 (October 25, 2023)''': Bug fixes (except the staff lift), changed button fixtures, cab texture and floor / indicator numbering (except the staff lift) | * '''Version 2 (October 25, 2023)''': Bug fixes (except the staff lift), changed button fixtures, cab texture and floor / indicator numbering (except the staff lift) | ||
* '''Version 3 (October 29, 2023)''': Bug fixes for the staff lift, changed floor and indicator numbering for the staff lift, corrected the roof to | * '''Version 3 (October 29, 2023)''': Bug fixes for the staff lift, changed floor and indicator numbering for the staff lift, corrected the roof to exactly 1,207 ft, changed the antenna/roof texture | ||
* '''Version 4A (November 16, 2023)''': Changed shaft door texture for all lifts, changed carpet texture and exterior wall texture in the lift lobby, changed floor texture for the public lifts (idk how the cab looks like in the service lift) | * '''Version 4A (November 16, 2023)''': Changed shaft door texture for all lifts, changed carpet texture and exterior wall texture in the lift lobby, changed floor texture for the public lifts (idk how the cab looks like in the service lift) | ||
* '''Version 4B (February 21, 2024)''': Bug fixes | * '''Version 4B (February 21, 2024)''': Bug fixes | ||
== Floors == | |||
==Floors== | |||
* '''1-2''' - Staff Area | * '''1-2''' - Staff Area | ||
* '''3''' - Lobby | * '''3''' - Lobby | ||
Line 18: | Line 17: | ||
* '''22''' - Restaurant | * '''22''' - Restaurant | ||
* '''24-30''' - Mechanical | * '''24-30''' - Mechanical | ||
== Gallery == | |||
==Gallery== | * NOTE: Some of the screenshots were made in Version 3. | ||
*NOTE: Some of the screenshots were made in Version 3. | |||
<gallery> | <gallery> | ||
Berlin TV Tower External Facade.png|Exterior of the Berlin TV Tower | Berlin TV Tower External Facade.png|Exterior of the Berlin TV Tower | ||
Line 26: | Line 24: | ||
Berlin TV Tower Observatory.jpg|Observatory | Berlin TV Tower Observatory.jpg|Observatory | ||
</gallery> | </gallery> | ||
== See also == | |||
==See also== | |||
* [[My Observation Tower]] | * [[My Observation Tower]] | ||
* [[Lighthouse Friesland Plaza]] | * [[Lighthouse Friesland Plaza]] | ||
* [[Mn10 Elevator Testing Center]] | * [[Mn10 Elevator Testing Center]] | ||
== External links == | == External links == | ||
* [https://en.wikipedia.org/wiki/Fernsehturm_Berlin Information about Berlin TV Tower in real life] | * [https://en.wikipedia.org/wiki/Fernsehturm_Berlin Information about Berlin TV Tower in real life] |
Revision as of 09:04, 11 March 2024
It contains good-faith information, such as an existing building or content. |
Berlin TV Tower is a TV Tower created by Lighthouse Friesland. It is based off of a TV Tower located at Alexanderplatz in Berlin (Germany) and it's near Park Inn Hotel.
Updates
- Version 1A (September 22, 2022): First launch
- Version 1B (September 2, 2023): Changed elevator ceiling texture (except the staff lift)
- Version 2 (October 25, 2023): Bug fixes (except the staff lift), changed button fixtures, cab texture and floor / indicator numbering (except the staff lift)
- Version 3 (October 29, 2023): Bug fixes for the staff lift, changed floor and indicator numbering for the staff lift, corrected the roof to exactly 1,207 ft, changed the antenna/roof texture
- Version 4A (November 16, 2023): Changed shaft door texture for all lifts, changed carpet texture and exterior wall texture in the lift lobby, changed floor texture for the public lifts (idk how the cab looks like in the service lift)
- Version 4B (February 21, 2024): Bug fixes
Floors
- 1-2 - Staff Area
- 3 - Lobby
- 4 - Elevator Lobby
- 5-20 - Mechanical
- 21 - Observatory
- 21M - Mechanical
- 22 - Restaurant
- 24-30 - Mechanical
Gallery
- NOTE: Some of the screenshots were made in Version 3.
-
Exterior of the Berlin TV Tower
-
Berlin TV Tower Antenna (looking from the air)
-
Observatory