Line Hospital (V1)
For the planned building with the same name, please go to this page.
Line Hospital V1 is a building complex that was made by elevator1512. There are a total of 8 separate building files and 37 buildings in the complex.
Floors
File 1
Building 1
Floors | Usage |
---|---|
T3-T1 | Storage Rooms |
L2 | Lower Ground Section 2 |
M | Maintenance Level |
L1 | Lower Ground Section 1 |
LG | Ground Floor |
UG | Upper Ground Floor |
1-19 | Patient Rooms |
20 | Lower Footbridge |
21-29 | Patient Rooms |
30 | Upper Footbridge |
31-32 | Patient Rooms |
33-34 | Mechanical |
R | Rooftop |
Building 2
Floors | Usage |
---|---|
SB | Sub-Basement |
B | Basement |
T3-T1 | Storage Rooms |
L2 | Lower Ground Section 2 |
M | Maintenance Level |
L1 | Lower Ground Section 1 |
LG | Ground Floor |
UG | Upper Ground Floor |
1-24 | Patient Rooms |
25 | Lower Footbridge |
26-29 | Offices |
30 | Upper Footbridge |
31 | Mechanical |
32 | Rooftop |
Building 3
Floors | Usage |
---|---|
SB | Subterranean Basement |
B | Basement |
T3-T1 | Storage Rooms |
L2 | Lower Ground Section 2 |
M | Maintenance Level |
L1 | Lower Ground Section 1 |
LG | Ground Floor |
UG | Upper Ground Floor |
1-19 | Patient Rooms |
20 | Lower Footbridge |
21-24 | Patient Rooms |
25 | Upper Footbridge |
26 | Mechanical |
27 | Rooftop |
Building 4
Floors | Usage |
---|---|
SB | Subterranean Basement |
B | Basement |
T3-T1 | Storage Rooms |
L2 | Lower Ground Section 2 |
M | Maintenance Level |
L1 | Lower Ground Section 1 |
LG | Ground Floor |
UG | Upper Ground Floor |
1-6 | Critical Care Units |
7-19 | Regular Units |
20 | Footbridge |
21-22 | Mechanical |
23 | Rooftop |
Communications Building (Building 5)
Floors | Usage |
---|---|
T2-T1 | Storage Rooms |
L2 | Generator for Building 1 |
M | Tunnel to Buildings 1-4 |
L1 | Generator for Buildings 2 and 3 |
LG | Communications |
UG | Communications |
1-4 | Communications |
5 | Rooftop |
File 2
Building 6
Floors | Usage |
---|---|
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2-8 | Patient Rooms |
9 | Mechanical |
10 | Rooftop |
Building 7
Floors | Usage |
---|---|
B5 | Generator Room |
B4 | Lower Basement |
B3 | Mezzanine |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2-9 | Offices |
10 | Footbridge |
11-12 | Upper Offices |
13 | Mechanical |
14 | Rooftop |
Building 8
Floors | Usage |
---|---|
B3-B1 | Underground Crosswalk |
1 | Lobby |
1A | Atrium |
2-9 | Lower Patient Rooms |
10 | Lower Footbridge |
11 | Lower Mechanical |
12-19 | Middle Patient Rooms |
20 | Upper Footbridge |
21-31 | Upper Patient Rooms |
32-33 | Mechanical |
H | Heliport Level |
Building 9
Floors | Usage |
---|---|
SB | Sub-Basement |
SM | Sub-Basement Mezzanine |
B4 | Storage Area |
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2 | Emergency Room |
3-5 | Extended Stay Patient Rooms |
6-9 | Lower Patient Rooms |
10 | Lower Footbridge |
11-19 | Upper Patient Rooms |
20 | Upper Footbridge |
21-24 | Offices |
25-26 | Mechanical |
27 | Roof |
Building 10
Floors | Usage |
---|---|
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
1A | Atrium |
2-9 | Lower Patient Rooms |
10 | Lower Footbridge |
11-18 | Upper Patient Rooms |
19 | Mechanical |
20 | Upper Footbridge |
21 | Roof |
Communications Building (Building 11)
Floors | Usage |
---|---|
B3 | Lower Basement |
M | Basement Mezzanine |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Exit and Storage |
1A | Storage |
2-3 | Storage |
4 | Rooftop |
File 3
Building 12
Floors | Usage |
---|---|
S2-S1 | Sub-Basement Level |
B5-B4 | Lower Basement Floor |
B3 | Basement Tunnel Section |
B2-B1 | Upper Basement Floors |
1 | Main Entrance |
2-4 | Critical Care Patient Rooms |
M | Lower Crosswalk |
5-9 | Lower Patient Rooms |
10 | Main Crosswalk |
11 | Lower Mechanical |
12-18 | Upper Patient Rooms |
19 | Upper Mechanical |
20 | Upper Crosswalk |
21-27 | Hospital Offices |
H | Heliport Area |
Building 13
Floors | Usage |
---|---|
B4 | Tunnel to Building 9 |
B3 | Tunnel to Buildings 12 and 13 |
B2 | Lower Basement |
B1 | Upper Basement |
1 | Main Entrance |
2-4 | Offices |
M | Mezzanine Footbridge |
5-6 | Offices |
7 | Roof |
Building 14
Floors | Usage |
---|---|
S1 | Lower Subterranean Basement |
B5 | Upper Subterranean Basement |
B4 | Basement Tunnel |
B3 | Lower Basement |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Main Entrance |
2-4 | Patient Rooms |
M | Mezzanine Footbridge |
5 | Mechanical |
6-9 | Patient Rooms |
10 | Main Footbridge |
11-12 | Patient Rooms |
13 | Mechanical |
14 | Roof |
Building 15
Floors | Usage |
---|---|
B4 | Storage Level |
B3 | Basement Tunnel |
B2 | Lower Basement |
B1 | Upper Basement |
1 | Main Entrance |
2-4 | Critical Care Patient Rooms |
M | Mezzanine Footbridge |
5-8 | Patient Rooms |
9 | Mechanical |
10-19 | Patient Rooms |
20 | Footbridge |
21 | Patient Rooms |
22 | Mechanical |
23 | Roof |
Communications Building (Building 16)
Floors | Usage |
---|---|
B3 | Lower Basement |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Lobby |
2-4 | Storage |
M | Storage |
5 | Roof |
File 4
Building 17
Floors | Usage |
---|---|
B3 | Lower Lounge |
B2 | Storage Room |
B1 | Basement Tunnel |
1 | Main Entrance |
2 | Hospital Reception |
3-6 | Lower Patient Rooms |
M | Crosswalk |
7-9 | Upper Patient Rooms |
10 | Mechanical |
11 | Roof |
Building 18
Floors | Usage |
---|---|
B2 | Storage Room |
B1 | Basement Level |
1 | Main Entrance |
2-6 | Offices |
M | Lower Crosswalk |
7-12 | Offices |
13 | Mechanical |
14-16 | Executive Offices |
17 | Upper Crosswalk |
18-24 | Patient Rooms |
25 | Roof |
Building 19
Floors | Usage |
---|---|
B3 | Lower Basement |
B2 | Storage Room |
B1 | Main Basement |
1 | Main Entrance |
2-6 | Patient Rooms |
M | Footbridge |
7-12 | Patient Rooms |
13 | Mechanical |
14-16 | Patient Rooms |
17 | Podium |
18-28 | Offices |
R | Roof |
File 5
Building 20
Floors | Usage |
---|---|
B6 | Lower Subterranean Basement |
B5 | Lower Basement |
B4 | Upper Subterranean Basement |
B3 | Basement Tunnel |
B2 | Middle Basement |
B1 | Upper Basement |
1 | Main Lobby |
2-8 | Patient Rooms |
9 | Mechanical |
10 | Lower Offices |
P | Office Podium Level |
11-18 | Upper Offices |
M | Mechanical |
R | Roof |
Building 21
Floors | Usage |
---|---|
B4 | Subterranean Basement |
B3 | Basement Tunnel |
B2 | Lower Basement |
B1 | Upper Basement |
1 | Main Lobby |
2-6 | Offices |
7 | Mechanical |
8-10 | Lower Patient Rooms |
P | Podium Level |
11-13 | Patient Rooms |
14 | Mechanical |
R | Roof |
File 6
Building 22
Floors | Usage |
---|---|
B4-B1 | Basement |
G | Lobby |
1-6 | Patient Rooms |
7 | Footbridge |
8 | Patient Rooms |
9 | Mechanical |
10-15 | Patient Rooms |
16 | Mechanical |
17 | Footbridge |
18-26 | Patient Rooms |
27 | Footbridge |
28 | Patient Rooms |
29 | Mechanical |
30-36 | Patient Rooms |
37 | Roof |
Building 23
Floors | Usage |
---|---|
B7-B1 | Basement |
G | Ground Floor |
1 | Special Care Patient Rooms |
2 | Mechanical |
3-6 | Special Care Patient Rooms |
7 | Footbridge |
8-16 | Patient Rooms |
17 | Footbridge |
18-20 | Patient Rooms |
21 | Mechanical |
22 | Service? |
23-26 | Offices |
27 | Footbridge |
28-41 | Offices |
42 | Mechanical |
43-44 | Offices |
R | Roof |
Building 24
Floors | Usage |
---|---|
B6-B1 | Basement |
G | Ground Floor |
1-6 | Offices |
7 | Footbridge |
8-16 | Offices |
17 | Footbridge |
18 | Offices |
19 | Mechanical |
20 | Roof |
Building 25
Floors | Usage |
---|---|
B2-B1 | Basement |
G | Ground Floor |
1-6 | Offices |
7 | Podium |
8-13 | Offices |
14 | Mechanical |
15 | Roof |
Building 26
Floors | Usage |
---|---|
B3-B1 | Basement |
G | Ground Floor |
1-6 | Offices |
7 | Footbridge |
8-10 | Offices |
11 | Mechanical |
12-16 | Offices |
17 | Footbridge |
18 | Roof |
Building 27
Floors | Usage |
---|---|
B7 | Service Basement |
B6 | Tunnel to Building 24 |
B5-B1 | Basement |
G | Ground Floor |
1-5 | Special Patient Rooms |
6 | Mechanical |
7 | Footbridge |
8 | Special Patient Rooms |
9 | Roof |
Building 28
Floors | Usage |
---|---|
B2-B1 | Basement |
G | Ground Floor |
1-3 | Offices |
4 | Mechanical |
5-6 | Offices |
7 | Footbridge |
8-16 | Offices |
17 | Footbridge |
18-24 | Offices |
25 | Mechanical |
26 | Offices |
27 | Footbridge / Roof |
Building 29 (Service Building)
Floors | Usage |
---|---|
1 (B6) | Tunnel |
2-3 (B2-B1) | Basement and Tunnel Connector to Building 28 |
4 (0) | Ground Floor |
5-10 (1-6) | Communications |
11 (7) | Footbridge to Building 28 |
12 (8) | Communications Topside |
13 (9) | Roof |
File 7
Building 30
- SB (B7) - Sub-Basement
- B2-B1 (B6-B5) - Basement Levels
- 1 (B4) - Lower Level 2
- 1R (B3) - Tunnel to Other Buildings
- 2 (B2) - Lower Level 1
- 2R (B1) - Storage
- L (0) - Lobby
- 3 (1) - Mezzanine
- 4-12 (2-10) - Patient Rooms
- 14-19 (11-16) - Patient Rooms
- PH (17) - Penthouse
- R (18) - Roof
Building 31
- SB - Sub-Basement
- B6-B5 - Storage
- B4 - Lower Level 2
- B3 - Tunnel to Other Buildings
- B2 - Storage
- B1 - Lower Level 1
- L - Lobby
- M - Mezzanine
- 2-9 - Offices
- 10 - Mechanical
- 11 - Roof
Building 32
- LL3 - Storage
- T - Tunnel to Other Buildings
- LL2-LL1 - Lower Levels
- 1 (0) - Lobby
- 2-12 - Offices
- 14 - Mechanical
- 15 - Roof
Building 33
- LL3 (-6) - Lower Level 3
- L3M (-5) - Storage
- LL2 (-4) - Lower Level 2
- L2M (-3) - Tunnel to Other Buildings
- LL1 (-2) - Lower Level 1
- L1M (-1) - Storage
- 1 (0) - Lobby
- 1M (1) - Lobby Mezzanine
- 2 - Lower Patient Rooms
- 2M (3) - Lower Mezzanine
- 3 (4) - Middle Patient Rooms
- 3M (5) - Upper Mezzanine
- 4 (6) - Upper Patient Rooms
- 4M (7) - Mechanical
- 5 (8) - Roof
File 8
Building 34
- B8 - Service Basement
- B7-B6 - Unknown
- B5 - Lower Tunnel Level
- B4-B3 - Unknown
- B2 - Upper Tunnel Level
- B1 - Mechanical
- 1 - Lobby
- M - Mezzanine
- 2 - Mechanical
- 3-8 - Patient Rooms
- 9 - Lower Footbridge
- 10-20 - Patient Rooms
- 21 - Upper Footbridge
- 22-25 - Patient Rooms
- 26 - Mechanical
- 27-39 - Patient Rooms
- R - Roof
Building 35
- B8 - Service Basement
- B7-B6 - Express Zone
- B5 - Lower Tunnel Level
- B4-B3 - Unknown
- B2 - Upper Tunnel Level
- B1 - Unknown
- 1 - Lobby
- M - Mezzanine
- 2-8 - Offices
- 9 - Lower Footbridge
- 10-18 - Offices
- 19 - Mechanical
- 20 - Offices
- 21 - Upper Footbridge
- 22-24 - Offices
- R - Roof
Building 36
- B8 - Service Basement
- B7-B6 - Unknown
- B5 - Lower Tunnel Level
- B4 - Mechanical
- B3 - Unknown
- B2 - Upper Tunnel Level
- B1 - Mechanical
- 1 - Lobby
- M - Mezzanine
- 2 - Mechanical
- 3-8 - Offices
- 9 - Lower Footbridge
- 10 - Mechanical
- 11-14 - Offices
- R - Roof
Building 37
- B8 - Service Basement
- B7-B4 - Express Zone
- B3 - Mechanical
- B2 - Upper Tunnel Level
- B1 - Unknown
- 1 - Lobby
- M - Mezzanine
- 2-8 - Patient Rooms
- 9 - Lower Footbridge
- 10-13 - Patient Rooms
- 14 - Mechanical
- 15-20 - Patient Rooms
- 21 - Upper Footbridge
- R - Roof