Spacetime Plaza Screenshots
Overview
-
Looking at the main shopping areas from the northeast, with the tall buildings seen in background (31 May 2026)
-
Looking from the southwest, with the Lavender Moon Hotel and Accounting Tower visible (31 May 2026)
Main mall and Monica Dept. Store
-
The main mall's center atrium with the glass elevators (13 May 2026)
-
A glass elevator at the center of the main mall (6 May 2026)
-
Parking elevator lobby on the 6th floor (6 May 2026)
-
Inside one of the parking elevators (10 June 2026)
-
Parking elevator lobby on the 10th floor (10 June 2026)
-
One of the elevators at the mall's east side (13 May 2026)
-
Another bank of elevators with different floor indicators (13 May 2026)
April Dept. Store and Tower
-
April Tower's elevators on the 3rd floor (6 May 2026)
-
Inside one of April Tower's elevators (6 May 2026)
Accounting Tower
-
One of the office floors (1 June 2026)
-
An office local elevator (1 June 2026)
-
Another office elevator with a different interior (5 June 2026)
-
Looking at the parking elevators (4 June 2026)
-
Inside one of the parking elevators (5 June 2026)
Underground parking garage
-
A ramp connecting the southeastern side of levels B1 and B2 (1 June 2026)
-
A ramp connecting the northeastern side of levels B1 and B2 (1 June 2026)
-
Northeastern end of the parking garage on level B1, underneath the Monica Dept. Store (10 June 2026)
-
Another look at the northeastern end of level B1 (10 June 2026)
-
Northeastern end of level B2, with both elevator lobbies of Monica Dept. Store completed (10 June 2026)