EG881 Integration Project
The EG881 Integration Project is an integration project founded by escalatorgeek881. It is the first integration project as it allowed multiple buildings and their related data to be released at the same time, and more integration projects soon followed such as the Mn10 Integration Project and M72 Integration Project.
Versions
EG881 Integration Project 2011
- Version 1.0 (04/04/2011)
- Version 1.5 (05/01/2011)
- Version 2.0 (06/05/2011)
- Version 2.5 (07/30/2011)
- Version 3.0 (09/25/2011)
EG881 Integration Project 2012
- Build 1 (02/06/2012)
- Build 2 (02/12/2012)
- Build 3 (03/12/2012)
- Build 4 (06/03/2012)
- Build 5 (09/22/2012)
- Build 6 (12/25/2012)
EG881 Integration Project 2013 / 2014
Integration Project 2013
- Build 1 (01/14/2013)
- Build 2 (05/26/2013)
- Build 3 (10/19/2013)
Integration Project 2014
- Build 1 (01/11/2014)
- Build 2 (01/29/2014)
- Build 3 (03/09/2014)
EG881 Integration Project (After 2014)
- Build 1 (03/19/2015)
- Build 2 (07/20/2015)
- Build 3 (08/25/2015)
- Build 4 (12/20/2015)
- Build 5 (12/25/2015)
- Build 6 (03/29/2016)
- Build 7 (05/01/2016)
- Build 8 (07/17/2016)
- Build 9 (12/19/2016)
- Build 10 (01/16/2017)
- Build 11 (10/01/2018)
- Build 12 (06/04/2023)
- Build 13 (07/30/2023)
- Build 14 (09/17/2023)
- Build 15 (11/05/2023)
Current buildings
- Dellerton Plaza (V2)
- Eternity Plaza (V2)
- EG881 Ranch House
- Terrace V3
- Terrace Border V2
- Triton Center III (V2)
- Sky I (V2)
- Northeast Triad Convention Center (NTCC)
- Stratford Business Complex
Planned buildings
- Coniferous Tower
- Denton Plaza
- Grove Building
- Lint Plaza
- Shillander Financial Center
Past buildings
- Read more: Escalatorgeek881's Buildings