The Spire
Jump to navigation
Jump to search
It contains good-faith information, such as an existing building or content. |
The Spire is a skyscraper created by EG881. It is also in SVN, along with Dellerton Plaza, Eternity Plaza, One Mantis Center, and a few other buildings. The building was left unfinished at an unknown date. The building has 115 elevators, although elevators 101-115 do not have any external call buttons.
Floors[edit | edit source]
Notes[edit | edit source]
- Italicized floors can't be accessed by any elevator.
Floor Names[edit | edit source]
Zone B[edit | edit source]
- C-A - Storage
- BR - Boiler Room
- PM - Piping and Maintenance
- EL - Electrical Control Center
- SB - Service Basement
Zone P[edit | edit source]
- B9-B1 - Blue Parking
- P9-P1 - Purple Parking
- LL9-LL1 - Office Parking
Zone L[edit | edit source]
- PL - Parking Lobby
- CL - Concourse Level
- LL - Lower Lobby
- GL - Ground Lobby
- ML - Mezzanine
- IL - International Level
Zone 1[edit | edit source]
- 3 - Zone 1 Office Storage
- 4-7 - Conference Rooms
- 8-41 - Zone 1 Offices
- 42-43 - Zone 1 Mechanical
Zone 2[edit | edit source]
- 44 - Zone 1 Executive Offices
- 45 - Zone 2 Lower Skylobby
- 46-54 - Zone 2 Offices
- 55 - Zone 2 Upper Skylobby
- 56 - Zone 2 Offices
- 57 - Zone 2 Service Level
- 58-114 - Zone 2 Offices
- 115-116 - Zone 2 Mechanical
Zone 3[edit | edit source]
- 117 - Zone 3 Lower Skylobby
- 118 - Zone 3 Service Level
- 119 - Zone 3 Upper Skylobby
- 120-158 - Zone 3 Offices
- 159 - Zone 3 Mechanical
Zone 4[edit | edit source]
- 160-176 - Zone 3 Offices
- 177 - Hotel Skylobby
- 178 - Apartment Lower Service Level
- 179-197 - Apartments
- 198 - Zone 4 Mechanical
Zone 5[edit | edit source]
- 199 - Apartment Skylobby
- 200 - Condominiums Skylobby
- 201-212 - Apartments
- 213 - Apartment Upper Service Level
- 214 - Pool Maintenance Service Level
- 215 - The Pool of the Sky
- 216 - Lower Condos Service Level
- 217-227 - Condominiums
- 228 - Upper Condos Service Level
- 229-238 - Condominiums
- 239 - Zone 5 Mechanical
Zone 6[edit | edit source]
- 240-270 Hotel Rooms
- 271 - Zone 6 Mechanical
Zone 7[edit | edit source]
- 272 - Hotel Lower Service Level
- 273-288 - Hotel Rooms
- 289 - Hotel Upper Service Level
- 290 - Ballroom Service Level
- 291-292 - The Sky Ballroom
- 293 - The Signature Service Level
- 294-295 - The Signature Restaurant
- 296-298 - Communications
- 299 - Topside Mechanical
- 300 - The Spire Skydeck 300
- R - Pyramid Roof