25th Street Medical offices and Pharmacy: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
(grammar edits, fixed typo, new image in gallery.)
m (Reverted edit by Lighthouse Friesland (talk) to last revision by Abigail)
Tag: Rollback
 
(2 intermediate revisions by 3 users not shown)
Line 1: Line 1:
The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by [[User:Abigail|Abigail]], there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.  
The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by [[User:Abigail|Abigail]], there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th Street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.  
[[File:25th st front plan.png|alt=A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]]
[[File:25th st front plan.png|alt=A Front View of Future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]]
Dev Screenshots are to follow eventually.  
Dev Screenshots are to follow eventually.  


Line 10: Line 10:


== Development plans ==
== Development plans ==
Release is expected by January 2025, however, it may take longer if conditions change. Unfinished BLD files may be provided upon request.
Release is expected by January 2025, however, this is not exact. Release may come sooner or later than expected. Unfinished BLD files may be provided upon request.
The Project Is currently in Phase I.
The Project Is currently in Phase I.


== Development Phases ==
== Development Phases ==
* Phase I - Structural, this consists of the building's floors, doors, and some minor/moderate details.
* Phase I - Structural, consisting of the building's floors, doors, textures, and minor/moderate details.
* Phase II - Elevators and Signage.
* Phase II - Elevators and Signage.
* Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before phase III begins.
* Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before Phase III begins.
* Phase IV - Release/Refinement. By this point, the building will have a full public release available.
* Phase IV - Release/Refinement. By this point, the building will have a full public release available.


== Floors ==
== Floors ==
* '''K''' - Basement, Machine rooms, Storage, Servers (Not yet added)
* '''K''' - Basement, Machine rooms, Storage, Servers (Room added, currently inaccessible)
* '''L''' - Lobby, Storage, Pharmacy (Phase I complete)
* '''L''' - Lobby, Storage, Pharmacy (Phase I complete)
* '''1''' - Offices, Storage (Not yet added)
* '''1''' - Offices, Storage (Interfloor Area WIP)
* '''2''' - Doctor's exam rooms, Waiting room, offices (Not yet added)
* '''2''' - Doctor's exam rooms, Waiting room, offices (Not yet added)
* '''R''' - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added)
* '''R''' - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added)

Latest revision as of 09:01, 7 May 2024

The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by Abigail, there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th Street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.

A Front View of Future Construction plans, at this time only the ground level (excluding support pillar) has been built
A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built

Dev Screenshots are to follow eventually.

Screenshots[edit | edit source]

Development plans[edit | edit source]

Release is expected by January 2025, however, this is not exact. Release may come sooner or later than expected. Unfinished BLD files may be provided upon request. The Project Is currently in Phase I.

Development Phases[edit | edit source]

  • Phase I - Structural, consisting of the building's floors, doors, textures, and minor/moderate details.
  • Phase II - Elevators and Signage.
  • Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before Phase III begins.
  • Phase IV - Release/Refinement. By this point, the building will have a full public release available.

Floors[edit | edit source]

  • K - Basement, Machine rooms, Storage, Servers (Room added, currently inaccessible)
  • L - Lobby, Storage, Pharmacy (Phase I complete)
  • 1 - Offices, Storage (Interfloor Area WIP)
  • 2 - Doctor's exam rooms, Waiting room, offices (Not yet added)
  • R - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added)

See also[edit | edit source]