25th Street Medical offices and Pharmacy

From Skyscraper Wiki
Jump to navigation Jump to search

The Republic Department of Health 25th Street Medical Office and Pharmacy building was an in-development building created by Abigail, there were plans for 3 floors and 2 elevators. the building was to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th Street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.

A Front View of Future Construction plans, at this time only the ground level (excluding support pillar) has been built
A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built

Dev Screenshots are to follow eventually.

Screenshots[edit | edit source]

Development plans[edit | edit source]

Release was expected in January 2025 but was cancelled in December 2024 due to issues in Abigail's life. 25th Street is planned to have a spiritual successor in the form of the Northern Technologies Building.

Development Phases[edit | edit source]

  • Phase I - Structural, consisting of the building's floors, doors, textures, and minor/moderate details.
  • Phase II - Elevators and Signage.
  • Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before Phase III begins.
  • Phase IV - Release/Refinement. By this point, the building will have a full public release available.

Floors[edit | edit source]

  • K - Basement, Machine rooms, Storage, Servers (Room added, currently inaccessible)
  • L - Lobby, Storage, Pharmacy (Phase I complete)
  • 1 - Offices, Storage (Interfloor Area WIP)
  • 2 - Doctor's exam rooms, Waiting room, offices (Not yet added)
  • R - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added)

See also[edit | edit source]