Northeast Triad Convention Center: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
No edit summary
Line 1: Line 1:
{{legit}}
{{Future infrastructure}}
{{Bld
{{Bld
|Northeast Triad Convention Center
|Northeast Triad Convention Center

Revision as of 10:25, 12 April 2024

This page (or section) is for a future building.

This article may need to be updated as more stuff comes.
The completed building may look different from the current information.

Northeast Triad Convention Center

Status
Incomplete
Completed
Unknown
Abbreviation
NTCC
Creator
EG881
Aboveground Floors
26
Underground Floors
4
Passenger Elevators
18
Service Elevators
3
Dumbwaiters
0
Staircases
3
Function
Convention Center
Part of
EG881 Integration Project
Website
Not provided
How to use this template?



The Northeast Triad Convention Center is a complex of buildings made by escalatorgeek881 (EG881). It consists of the 26-floor Cityview Office Tower (formally known as the Octagon Plaza), the 10-floor South Convention Center, the 8-floor North Parking Garage, the currently empty Palmetto Building, the nearby 7-floor Doolittle Street Parking Garage and the Doolittle Meridian Center next to Doolittle St. Garage. There are a total of 52 elevators in the entire complex.

Floors

Cityview Tower

  • SB - Sub-Basement (Lower service area)
  • B - Basement
  • 1 - Ground Entrance / Service Area
  • 2 - Lobby
  • 3-9 - Convention Center (access to South Convention Center on floors 4 and 5)
  • 10-25 - Offices
  • 26 - Trapezoid Restaurant
  • R - Roof

Convention Center

  • B - Gibson Auditorium
  • 1 - Empty / Service Area
  • 2 - Lobby and Convention Center
  • 3-9 - Convention Center (access to Central Parking Garage on floors 2-4; Cityview Tower on floor 5)
  • 10 - Edinburgh Room, Norpoint Room, service area
  • 11 - Roof

North Parking Garage

  • P4-P1 - Underground Parking
  • 1 - Lower Parking
  • 2 - Street Level Parking
  • 3-8 - Aboveground Parking (Convention Center Connector on floor 5)

Central Parking Garage

  • 1 - Underground Parking
  • 2-4 - Aboveground Parking
  • 5 - Convention Center

Doolittle Street Parking Garage

  • 1 - Underground Parking
  • 2 - Lower Street Exit, Parking, Access to Doolittle Meridian Center
  • 3 - Parking, Bridge to Doolittle Meridian Center
  • 4 - Parking
  • 5 - Upper Street Level, Parking
  • 6 - Parking
  • 7 - Rooftop Parking

Doolittle Meridian Center

  • 1 - Ground Floor
  • 2 - Offices, Bridge to Doolittle St. Garage
  • 3-19 - Offices

Notes

Floors B & P1, SB & P2 are split-level from each other.

See also