25th Street Medical offices and Pharmacy: Difference between revisions
Jump to navigation
Jump to search
(Added info on what my plans will be, these could be delayed depending on personal circumstances.) |
(More development info, cleaned up the page.) |
||
Line 2: | Line 2: | ||
[[File:25th st front plan.png|alt=A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]] | [[File:25th st front plan.png|alt=A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]] | ||
Dev Screenshots are to follow eventually. | Dev Screenshots are to follow eventually. | ||
== Development plans == | == Development plans == | ||
Release is expected by January 2025, however it may take longer if conditions change. Unfinished BLD files may be provided upon request. | Release is expected by January 2025, however it may take longer if conditions change. Unfinished BLD files may be provided upon request. | ||
The Project | The Project Is currently in Phase I. | ||
Phase II | |||
Phase III | == Development Phases == | ||
* Phase I - Structural, this consists of the building's floors, doors, and some minor/moderate details. | |||
* Phase II - Elevators and Signage. | |||
* Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before phase III begins. | |||
* Phase IV - Release/Refinement. By this point the building will have a full public release available. | |||
== Floors == | == Floors == | ||
* '''G''' - Lobby, Storage, Pharmacy | * '''G''' - Lobby, Storage, Pharmacy (Phase I complete) | ||
* '''1''' - Offices, Storage | * '''1''' - Offices, Storage (Not yet added) | ||
* '''2''' - Doctor's exam rooms, Waiting room, offices | * '''2''' - Doctor's exam rooms, Waiting room, offices (Not yet added) | ||
* '''R''' - Roof top, Maintenance, AzureNet Radio uplink | * '''R''' - Roof top, Maintenance, AzureNet Radio uplink (Not yet added) | ||
[[Category:Buildings]] | [[Category:Buildings]] |
Revision as of 10:39, 19 March 2024
The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by Abigail, there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, and may include integration projects to allow for curves and superior texture handling. it is planned to be a representation of how the 25th street Pharmacy would have looked in June of 1979, Four months after it's canonical construction finished.
Dev Screenshots are to follow eventually.
Development plans
Release is expected by January 2025, however it may take longer if conditions change. Unfinished BLD files may be provided upon request. The Project Is currently in Phase I.
Development Phases
- Phase I - Structural, this consists of the building's floors, doors, and some minor/moderate details.
- Phase II - Elevators and Signage.
- Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before phase III begins.
- Phase IV - Release/Refinement. By this point the building will have a full public release available.
Floors
- G - Lobby, Storage, Pharmacy (Phase I complete)
- 1 - Offices, Storage (Not yet added)
- 2 - Doctor's exam rooms, Waiting room, offices (Not yet added)
- R - Roof top, Maintenance, AzureNet Radio uplink (Not yet added)