25th Street Medical offices and Pharmacy: Difference between revisions

From Skyscraper Wiki
Jump to navigation Jump to search
No edit summary
(grammar edits, fixed typo, new image in gallery.)
Line 1: Line 1:
The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by [[User:Abigail|Abigail]], there are plans for r floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, and may utilize the EG881 Integration Project to allow for curves and superior texture handling. it is planned to be a representation of how the 25th street Pharmacy would have looked in June of 1979, Four months after it's canonical construction finished.  
The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by [[User:Abigail|Abigail]], there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.  
[[File:25th st front plan.png|alt=A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]]
[[File:25th st front plan.png|alt=A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]]
Dev Screenshots are to follow eventually.  
Dev Screenshots are to follow eventually.  


== Screenshots ==
== Screenshots ==
<gallery>
<gallery>
File:Screenshot 2024-03-20 144359.png|A screenshot of 25th Street, note the missing ceiling texture.
File:Screenshot 2024-03-20 144359.png|A screenshot of 25th Street, note the missing ceiling texture, which has since been fixed.
File:25thtopview-3-20.png|Aerial View of the lobby.
</gallery>
</gallery>


== Development plans ==
== Development plans ==
Release is expected by January 2025, however it may take longer if conditions change. Unfinished BLD files may be provided upon request.
Release is expected by January 2025, however, it may take longer if conditions change. Unfinished BLD files may be provided upon request.
The Project Is currently in Phase I.
The Project Is currently in Phase I.


Line 16: Line 17:
* Phase II - Elevators and Signage.
* Phase II - Elevators and Signage.
* Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before phase III begins.
* Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before phase III begins.
* Phase IV - Release/Refinement. By this point the building will have a full public release available.
* Phase IV - Release/Refinement. By this point, the building will have a full public release available.


== Floors ==
== Floors ==
* '''B''' - Basement, Machine rooms, Storage, Servers (Not yet added)
* '''K''' - Basement, Machine rooms, Storage, Servers (Not yet added)
* '''G''' - Lobby, Storage, Pharmacy (Phase I complete)
* '''L''' - Lobby, Storage, Pharmacy (Phase I complete)
* '''1''' - Offices, Storage (Not yet added)
* '''1''' - Offices, Storage (Not yet added)
* '''2''' - Doctor's exam rooms, Waiting room, offices (Not yet added)
* '''2''' - Doctor's exam rooms, Waiting room, offices (Not yet added)
* '''R''' - Roof top, Maintenance, AzureNet Radio uplink (Not yet added)
* '''R''' - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added)


== See also ==
== See also ==

Revision as of 17:45, 20 March 2024

The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by Abigail, there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.

A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built
A front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built

Dev Screenshots are to follow eventually.

Screenshots

Development plans

Release is expected by January 2025, however, it may take longer if conditions change. Unfinished BLD files may be provided upon request. The Project Is currently in Phase I.

Development Phases

  • Phase I - Structural, this consists of the building's floors, doors, and some minor/moderate details.
  • Phase II - Elevators and Signage.
  • Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before phase III begins.
  • Phase IV - Release/Refinement. By this point, the building will have a full public release available.

Floors

  • K - Basement, Machine rooms, Storage, Servers (Not yet added)
  • L - Lobby, Storage, Pharmacy (Phase I complete)
  • 1 - Offices, Storage (Not yet added)
  • 2 - Doctor's exam rooms, Waiting room, offices (Not yet added)
  • R - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added)

See also