25th Street Medical offices and Pharmacy: Difference between revisions
(→Development plans: might go faster than I thought, on the other hand, might not.) |
(Dev info update 3/26/24) |
||
Line 1: | Line 1: | ||
The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by [[User:Abigail|Abigail]], there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th | The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by [[User:Abigail|Abigail]], there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th Street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished. | ||
[[File:25th st front plan.png|alt=A Front View of | [[File:25th st front plan.png|alt=A Front View of Future Construction plans, at this time only the ground level (excluding support pillar) has been built|thumb|A Front View of future Construction plans, at this time only the ground level (excluding support pillar) has been built]] | ||
Dev Screenshots are to follow eventually. | Dev Screenshots are to follow eventually. | ||
Line 14: | Line 14: | ||
== Development Phases == | == Development Phases == | ||
* Phase I - Structural, | * Phase I - Structural, consisting of the building's floors, doors, textures, and minor/moderate details. | ||
* Phase II - Elevators and Signage. | * Phase II - Elevators and Signage. | ||
* Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before | * Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before Phase III begins. | ||
* Phase IV - Release/Refinement. By this point, the building will have a full public release available. | * Phase IV - Release/Refinement. By this point, the building will have a full public release available. | ||
== Floors == | == Floors == | ||
* '''K''' - Basement, Machine rooms, Storage, Servers ( | * '''K''' - Basement, Machine rooms, Storage, Servers (Room added, currently inaccessible) | ||
* '''L''' - Lobby, Storage, Pharmacy (Phase I complete) | * '''L''' - Lobby, Storage, Pharmacy (Phase I complete) | ||
* '''1''' - Offices, Storage ( | * '''1''' - Offices, Storage (Interfloor Area WIP) | ||
* '''2''' - Doctor's exam rooms, Waiting room, offices (Not yet added) | * '''2''' - Doctor's exam rooms, Waiting room, offices (Not yet added) | ||
* '''R''' - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added) | * '''R''' - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added) |
Revision as of 20:02, 26 March 2024
The Republic Department of Health 25th Street Medical Office and Pharmacy building is an in-development building created by Abigail, there are plans for 3 floors and 2 elevators. the building is to serve as a Proof of Concept for fully-furnished buildings in Skyscrapersim, utilizing the EG881 Integration Project for superior building detail. Canonically, the Building represents how 25th Street Pharmacy would have looked in June of 1979, Four months after its canonical construction finished.
Dev Screenshots are to follow eventually.
Screenshots
-
A screenshot of 25th Street, note the missing ceiling texture, which has since been fixed.
-
Aerial View of the lobby.
Development plans
Release is expected by January 2025, however, this is not exact. Release may come sooner or later than expected. Unfinished BLD files may be provided upon request. The Project Is currently in Phase I.
Development Phases
- Phase I - Structural, consisting of the building's floors, doors, textures, and minor/moderate details.
- Phase II - Elevators and Signage.
- Phase III - Furniture. This could cause unexpected delays. the Phase II Building will be made public as a Pre-Release before Phase III begins.
- Phase IV - Release/Refinement. By this point, the building will have a full public release available.
Floors
- K - Basement, Machine rooms, Storage, Servers (Room added, currently inaccessible)
- L - Lobby, Storage, Pharmacy (Phase I complete)
- 1 - Offices, Storage (Interfloor Area WIP)
- 2 - Doctor's exam rooms, Waiting room, offices (Not yet added)
- R - Rooftop, Maintenance, AzureNet Radio uplink (Not yet added)